Line 26: |
Line 26: |
| MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.(DISTRIBUTION CODE A003>FOR ACTION: INTERNAL: EXTERNAL: BRANCH CHIEF Z IEMANN~+W/2 ENCL EG F,++W/ENCL OR ACTION+4W/2 ENCL LPDR S ROCHESTER'Y~I | | MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.(DISTRIBUTION CODE A003>FOR ACTION: INTERNAL: EXTERNAL: BRANCH CHIEF Z IEMANN~+W/2 ENCL EG F,++W/ENCL OR ACTION+4W/2 ENCL LPDR S ROCHESTER'Y~I |
| +W/ENCL T IC~~W/ENCL NSIC++W/ENCL BNL<NATLAB)44M/ENCL ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL DISTRIBUTION: | | +W/ENCL T IC~~W/ENCL NSIC++W/ENCL BNL<NATLAB)44M/ENCL ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL DISTRIBUTION: |
| LTR 10 ENCL 10 SIZE: 1P+3P+iP CONTROL NBR: 780480239 END I'P I P il 44 I 4 IC | | LTR 10 ENCL 10 SIZE: 1P+3P+iP CONTROL NBR: 780480239 END I'P I P il 44 I 4 IC |
| (;/g'/~;,"" gFI gp~t I30gt(<j'3.$ | | (;/g'/~;,"" gFI gp~t I30gt(<j'3.$ |
| tII'.II+j';;;:,',I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 g), yg PEcovEO++~IC(7S78 0)G.~TELEPHONE APEA cooE Tie 546.2700 Ginna Station February 9, 1978 Director, Office of Management Information and Program Control U.S.NUCLEAR REGULATORY COMMISSION Washington, D.C.20555 Subject Monthly Report for January, 1978 Operating Status Information R.E.Ginna Nuclear.Power Plant Unit No.1 Docket No.50-244 Gentlemen: | | tII'.II+j';;;:,',I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 g), yg PEcovEO++~IC(7S78 0)G.~TELEPHONE APEA cooE Tie 546.2700 Ginna Station February 9, 1978 Director, Office of Management Information and Program Control U.S.NUCLEAR REGULATORY COMMISSION Washington, D.C.20555 Subject Monthly Report for January, 1978 Operating Status Information R.E.Ginna Nuclear.Power Plant Unit No.1 Docket No.50-244 Gentlemen: |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:Operating Report
MONTHYEARML18137A2162018-05-31031 May 2018 Annual Radiological Environmental Operating Report: January 1, 2017 - December 31, 2017 ML18137A2132018-05-11011 May 2018 and Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report and 2017 Annual Radiological Environmental Operating Report ML0509503022005-03-30030 March 2005 R. E. Ginna Nuclear Power Plant, Transmittal of Core Operating Limits Report (COLR) ML0414204852003-12-31031 December 2003 2003 Annual Radiological Environmental Operating Report ML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 2018-05-31
[Table view] Category:Monthly
MONTHYEARML18142B3531978-09-0707 September 1978 Forwards Monthly Operating Status Report for Month of August 1978 ML18142B3541978-08-0303 August 1978 Forwards Monthly Operating Status Report for Month of July, 1978 ML18142B3551978-07-10010 July 1978 Forwards Monthly Operating Status Report for Month of June, 1978 ML18142B3561978-06-14014 June 1978 Forwards Monthly Operating Status Report for Month of May, 1978 ML18142B3571978-04-0505 April 1978 Forwards Monthly Operating Status Report for Month of March, 1978 ML18142B3581978-03-0707 March 1978 R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1978 ML18142B3591978-02-0909 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3611978-02-0606 February 1978 Forwards Monthly Operating Status Report for Month of January 1978 ML18142B3621978-01-0505 January 1978 Forwards Monthly Operating Status Report for Month of December 1977 ML18142B3631977-12-0505 December 1977 Forwards Monthly Operating Status Report for Month of November 1977 ML18142B3851976-05-0505 May 1976 R.E Ginna - Forwards Monthly Operating Status Report for Month of April 1976 ML18142B3861976-03-0808 March 1976 Forwards Monthly Operating Status Report for Month of March 1976 ML18142B3871976-03-0505 March 1976 Forwards Monthly Operating Status Report for Month of February 1976 ML18142B3971975-07-0707 July 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of June 1975 1978-09-07
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DISTRIBUTION FOR INCOMING MATERIAL 50-244 REC: NRC ORG: LANG L S ROCHESTER GAS 8c ELEC DOCI3ATE: 02/09/78 DATE RCVD: 02/16/78 DOCTYPE: OTHER NOTARIZED:
NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 10 MONTHLY OPERATING REPT FQR JANUARY 1978-UNIT 1...W/ATT NARRATIVE
SUMMARY
.PLANT NAME: RE GINNA-UNIT 1 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:+++++++++++++++++
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS+4+4<++<+<<<<<<<<+
MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.(DISTRIBUTION CODE A003>FOR ACTION: INTERNAL: EXTERNAL: BRANCH CHIEF Z IEMANN~+W/2 ENCL EG F,++W/ENCL OR ACTION+4W/2 ENCL LPDR S ROCHESTER'Y~I
+W/ENCL T IC~~W/ENCL NSIC++W/ENCL BNL<NATLAB)44M/ENCL ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL DISTRIBUTION:
LTR 10 ENCL 10 SIZE: 1P+3P+iP CONTROL NBR: 780480239 END I'P I P il 44 I 4 IC
(;/g'/~;,"" gFI gp~t I30gt(<j'3.$
tII'.II+j';;;:,',I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 g), yg PEcovEO++~IC(7S78 0)G.~TELEPHONE APEA cooE Tie 546.2700 Ginna Station February 9, 1978 Director, Office of Management Information and Program Control U.S.NUCLEAR REGULATORY COMMISSION Washington, D.C.20555 Subject Monthly Report for January, 1978 Operating Status Information R.E.Ginna Nuclear.Power Plant Unit No.1 Docket No.50-244 Gentlemen:
Pursuant to our proposed Technical Specification
6.9.1 attached
herewith is the monthly operating status report for Ginna Station for the month of January, 1978.ll Very truly yours, LSL:fah Attachments Superintendent 780480239)god 3 I jo 4 It I OPERATING DATA REPORT DOCKET NO.50 244 DATE Fe rua 1 78 COMPI,ETED BY'ndrew E.McNamara, Operations Aide~OPERATING STATUS 490 1.Unit Name: GINNA STATIO 2.Reporting Period: 3.Licensed.Thermal Power (MWt): 4.Nameplate Rating (Gross MWc): 5.Design Electrical Rating (Net MWe)t 6.Maximum Dependable Capacity (Gross hfWe): 7.Maximum Dependable Capacity (Net MWe): 8.If Changes Occur in Capacity Ratings (Items 490 470 TELEPHONE.
1-716-546-2700 Ext.291-205 at Ginna Notes Line ll: The number of hours in Reporting Period, Cumula-tive, are from date of Initial, on-line of generator, not date of commercial operation.
Number 3 Through 7)Since Last Report, Give Reasons: 9.'ower Level to Which Restricted, If Any (Net i~fWe): 10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cumulative 744 744 11.Hours In Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, Date Refueling"-March 17, 1978-6 weeks 587 587 0 0 872,256 872,256 239,624 239 624 79%79%79%72%72%72%72%1%l%%d and Duration of Each): 71 736 54,625.62 8.5*.69,309,298 22 427 484 74%70%70%12%25.If Shut Down At End Of Report.Period, Estimated Date of Startup: February 3y 1978 26.Units In Test Status (Prior to Commercial Operation):
- Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved*Cumulative Data Commencing January 1, 1975 49 88 (RKV.I/78) 4 l ,q, A RAGE DAILY UNIT POWER UNIT MONTH January 1978 DAY AVERAGE DAILY POWER LEVEL (M We-Net)DOCKET NO..UNIT¹I Gtnna Statio Februar.3 1978 COMPLETED BY Andrew E.McNamara, Operations Aide TELEPHONE 1-716-546-2700, Ext.291-205, at Ginna DAY.AVERAGE DAILY POWER LEVEL (MWe-Net)1 2 10 ll 12 13 14 16 415 415 416.415 417 416 416 416 414 376 367 411 349 315 17 18 19 20 21.22 23 24 25*26'7*2B*2$30*31 415 415 416 415 415 416 416 416 357*Unit Shutdown INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.40 47 tRKVo 1/74)
DOCKET NO.50-244 UNIT NAhll<l Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS C:OhtPLETED ltY Andrew E.McNamara, Ope ations Aide REPORT hlONTll*TELEPllO l: 1-716-546-2700 Ext.291-205 At Ginna Ho.Date 0 ss 0 P.0 0 o O lxl Ol~0 c v e<<IA c 0 l.icensee Event Report Il Ew.e O N o o c D~C 0 Q c~o lJ Cause L Corrective Action to Prevent Recurrence 780125 157 78-03 CB HTEXCH"B" Steam Generator, Tuba Leak (Refer to L.E.R.78-03 for Corrective Actions)F: Forced St Scheduled 49 dg (Ra v, t/rd)Reason: A-Equipmcnt Failure (Explain)8-htaintenancc or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)ll-Other (Explain)hlechod: 1-hlanual 2-hlanual Scram.3-Automatic Scram.4-Other (Explain)FxhibicAi-Inscruccions for Preparation of.Data Entry Sheets for Licensee Event Rcport (LER)File (NUREG-ol6l)Exhibit~-Same Source 1 I 4 HARRATIYE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.0-2 UNIT DATE February 3, 1978 COMPLETED BY Andrew E.McNamara, Operations Aide NTH JAWJARY, 1978 TELEPHONE 1 716 546 2700'xt~291 205 at Ginna The Reactor Power Level averaged 100%in the Report Month.The exceptions were: Two unit power level reductions to~48%to repair condenser tube leaks, on 1/11 and 1/14, respectively.
A unit shutdown on 1/25 to effect repairs on the"B" steam generator, tube leak.The unit remained shutdown at the end of the Report Period.iQ~123 u/TS) 7 NARRATIVE
SUMMARY
OF SAFETY-RELATED MAINTENANCE I.JANUARY 1978 Ma)or safety-related.
maintenance"for the month of January included plugging of a tube leak in the 1B Steam Generator." An additi'onal seven tubes were plugged due to defect indications.
During the steam generator outage, the"B" loop sample valve was repaired due to a gasket leak and.the steam general'r"snubber SG>>A-7 was inspected and.rebuilt with new seals as preventive mannite'nance.
The terminal blocks for the pressurizer pressure and level control transmitters located in the containment were replaced, with Westinghouse terminal blocks.Con-trol rod power cables were checked for proper polarity and.terminal changes were made as necessary.
Additional non-shutdown work included repair of a weld leak in the 1B charging pump discharge relief piping and rebuilding of a worn 1A charging pump varidrive unit.
RECEIVEO ppCUHEH'O<
WOL OES.C ggFEB l6 Phf lR 4l U.S.tIRC OISTRIBUTIOH SERVICES SRAIICH