ML17341A733: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:~~FLORIDA POWER AND LIGHT COMPANY OFFSITE EMERGENCY ORGANIZATION EMERGENCY ROSTER PROCEDURE 1301 10/23/81 Page 1 1.0 Ti tl e: Emergency Roster-Offsite Emergency Organization 2.0 A royal aod List of Effectiv~e Pa es: 2.1 Approvals Reviewed by 1981 I Approved by: ZCCgCczm-/J~~g, 1981 2.2 List of Effective~Pa es Emergency Planning Supervisor Director, Nuclear Energy,~Pa e 1 through 8, inclusive 3 0~Sco e: 3.1~pur ose: Date 10/23/81 This procedure provides the phone numbers of personnel involved with emergency response to be called by the Emergency Control Officer (ECO)or his designee.3.2 Discussion:
Upon activation of the Emergency Plan, the ECO or his designee shall refer to Appendix A for notifications to be made..3.3 Authority:
This procedure implements the Turkey Point Plant Radiological Emergency Plan and the St.Luci e Plant Radiological Emergency Plan.4.0 Precautions:
None 5.0 Resyonsibi 1 i ti es: 5.1 The ECO or his designee shall make all phone calls prescribed in procedur'e number 1101 and the Emergency Plan.5.2 The ECO or his designee shall maintain a record of all communications with offsite personnel and organizations.
5.3 The Emergency Plan Supervisor shall be responsible for periodic-.-tf~rification and updating of the Emergency Roster.Sii22i0454 8ii2iOC i PDR ADOCK 05000250 I<F PDR<<
~~c1p f.l'C.Jc,J&MAL dUL-~vs-(}}

Revision as of 10:23, 4 October 2018

Public Version of Revised Emergency Plan Implementing Procedure 1301, Offsite Emergency Organization Roster. Apps A,B & C (Call Lists) Withheld (Ref 10CFR2.790)
ML17341A733
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/23/1981
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17341A730 List:
References
1301-01, 1301-1, NUDOCS 8112210454
Download: ML17341A733 (2)


Text

~~FLORIDA POWER AND LIGHT COMPANY OFFSITE EMERGENCY ORGANIZATION EMERGENCY ROSTER PROCEDURE 1301 10/23/81 Page 1 1.0 Ti tl e: Emergency Roster-Offsite Emergency Organization 2.0 A royal aod List of Effectiv~e Pa es: 2.1 Approvals Reviewed by 1981 I Approved by: ZCCgCczm-/J~~g, 1981 2.2 List of Effective~Pa es Emergency Planning Supervisor Director, Nuclear Energy,~Pa e 1 through 8, inclusive 3 0~Sco e: 3.1~pur ose: Date 10/23/81 This procedure provides the phone numbers of personnel involved with emergency response to be called by the Emergency Control Officer (ECO)or his designee.3.2 Discussion:

Upon activation of the Emergency Plan, the ECO or his designee shall refer to Appendix A for notifications to be made..3.3 Authority:

This procedure implements the Turkey Point Plant Radiological Emergency Plan and the St.Luci e Plant Radiological Emergency Plan.4.0 Precautions:

None 5.0 Resyonsibi 1 i ti es: 5.1 The ECO or his designee shall make all phone calls prescribed in procedur'e number 1101 and the Emergency Plan.5.2 The ECO or his designee shall maintain a record of all communications with offsite personnel and organizations.

5.3 The Emergency Plan Supervisor shall be responsible for periodic-.-tf~rification and updating of the Emergency Roster.Sii22i0454 8ii2iOC i PDR ADOCK 05000250 I<F PDR<<

~~c1p f.l'C.Jc,J&MAL dUL-~vs-(