ULNRC-06365, Updated Response to Notice of Violation Inspection Report 50-483/2016002

From kanterella
Jump to navigation Jump to search
Updated Response to Notice of Violation Inspection Report 50-483/2016002
ML17117A275
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/27/2017
From: Herrmann T
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IR 2016002, ULNRC-06365
Download: ML17117A275 (4)


Text

Timothy E. Herrmann, P.E.

~rt. Site Vice President Ameren Missouri WAmeren Callaway Energy Center T 573.619.2155 F 573.676.4056 MISSOURI therrmann@ameren.com April27,2017 ULNRC-06365 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 2.201 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATIN G LICENSE NPF-30 UPDATED RESPONSE TO NOTICE OF VIOLATION INSPECTIO N REPORT 50-483/2016002

References:

1. Letter dated August 12, 2016 from Nicholas H. Taylor, USNRC, to Fadi Diya, Union Electric Company, "Callaway Plant- NRC Integrated Inspection Report 05000483/2016002 and Notice of Violation" (ADAMS Accession Number ML16225A577)
2. ULNRC-06326, "Reply to a Notice of Violation Inspection Report No. 50-483/2016002,"

dated September 9, 2016 (ADAMS Accession Number ML16253A225)

3. Letter dated September 14, 2016 from Nick Taylor , USNRC, to Fadi Diya, Union Electric Company, "Callaway Plant - Response to Notice of Violation (NRC Inspection Report 05000483/2016002)" (ADAMS Accession Number ML16258A043)

On August 12, 2016, Union Electric Company (dba Ameren Missouri) received a Notice of Violation (NOV) identified for the Callaway Plant (Reference 1). Ameren Missouri's 30-day response to the NOV was provided in Reference 2, and the NRC's review and acknowledgement of the response to the NOV was provided in Reference 3.

In Reference 2, Ameren Missouri committed to perform an Essential Service Water (ESW) system transient analysis and identify non-conforming structural components by April 30, 2017. Further, a supplemental response identifying actions required as a result of the transient analysis was committed to be provided by June 30, 2017. This letter communicates that the preliminary results of the transient analysis are still being finalized such that the final analysis will not be completed by the end of April.

60000000000000 Junction CC & Hwy 0 Fulton, MO 65251 AmerenMissouri.com ..............

PO Box 620, MC CA-460 STARS ~ Alliance

ULNRC-06365 April27,2017 Page2 However, it is still Ameren Missouri's intent to provide a supplemental response identifying actions required as a result of the analysis by June 30, 2017, per the original commitment.

Therefore, it can be expected that the ESW transient analysis will be completed and the supplemental response identifying actions will be provided by June 30, 2017.

This letter does not contain new commitments.

If there are any questions concerning this letter, please contact Ms. Sarah Kovaleski, Director, Engineering Design, at (573) 489-9435.

Sincerely, T. E. Herrmann Site Vice President

ULNRC-06365 April 27, 2017 Page 3 cc: Mr. Kriss M. Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Klos Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8H4 Washington, DC 20555-0001

ULNRC-06365 April 27, 2017 Page 4 Index and send hardcopy to QA file(s):

A160.0761 A170.0103 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via NOV ULNRC Distribution:

F. M. Diya T. E. Herrmann B. L. Cox S. P. Banker S. G. Kovaleski L. E. Eitel C. M. Norman R. C. Wink T. B. Elwood Corporate Communications NSRB Secretary RRA Department File STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission