Response to Notice of Violation (NRC Inspection Report 05000483/2016002)
ML16258A043
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/14/2016
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Diya F
Union Electric Co
Taylor N
Shared Package
ML16258A035 List:
References
ML16225A577, ML16253A225 IR 2016002
Download: ML16258A043 (3)


See also: IR 05000483/2016002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

September 14, 2016

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT - RESPONSE TO NOTICE OF VIOLATION (NRC

INSPECTION REPORT 05000483/2016002)

Dear Mr. Diya:

On August 12, 2016, the Nuclear Regulatory Commission (NRC) cited Union Electric

Companys failure, in the case of a condition adverse to quality, to promptly identify and correct

the condition as required by 10 CFR Part 50 Appendix B, Criterion XVI, Corrective Action. The

Notice of Violation, enclosed with Inspection Report 05000483/2016002 (ML16225A577),

required you to respond in writing within 30 days. You responded by letter dated September 9,

2016 (ML16253A225).

We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We

will review your corrective actions during a future inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Nick Taylor, Chief

Project Branch B

Division of Reactor Projects

Docket No: 50-483

License No: NPF-30

ML16258A043 / ADAMS PACKAGE: ML16258A035

SUNSI Review

By: SMJ2

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE

PE:DRP B

SPE:DRP B

C:DRP B

NAME

SJanicki

DProulx

NTaylor

SIGNATURE

/RA/

/RA/

/RA/

DATE

9/13/16

9/13/16

9/14/16

Letter to Mr. Fadi Diya from Mr. Nick Taylor dated September 14, 2016

SUBJECT:

CALLAWAY PLANT - RESPONSE TO NOTICE OF VIOLATION (NRC

INSPECTION REPORT 05000483/2016002)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)