UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
September 14, 2016
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT - RESPONSE TO NOTICE OF VIOLATION (NRC
INSPECTION REPORT 05000483/2016002)
Dear Mr. Diya:
On August 12, 2016, the Nuclear Regulatory Commission (NRC) cited Union Electric
Companys failure, in the case of a condition adverse to quality, to promptly identify and correct
the condition as required by 10 CFR Part 50 Appendix B, Criterion XVI, Corrective Action. The
Notice of Violation, enclosed with Inspection Report 05000483/2016002 (ML16225A577),
required you to respond in writing within 30 days. You responded by letter dated September 9,
2016 (ML16253A225).
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We
will review your corrective actions during a future inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA/
Nick Taylor, Chief
Project Branch B
Division of Reactor Projects
Docket No: 50-483
License No: NPF-30
ML16258A043 / ADAMS PACKAGE: ML16258A035
SUNSI Review
By: SMJ2
Yes No
Publicly Available
Non-Publicly Available
Non-Sensitive
Sensitive
Keyword:
OFFICE
PE:DRP B
SPE:DRP B
C:DRP B
NAME
SJanicki
DProulx
NTaylor
SIGNATURE
/RA/
/RA/
/RA/
DATE
9/13/16
9/13/16
9/14/16
Letter to Mr. Fadi Diya from Mr. Nick Taylor dated September 14, 2016
SUBJECT:
CALLAWAY PLANT - RESPONSE TO NOTICE OF VIOLATION (NRC
INSPECTION REPORT 05000483/2016002)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)