U-600691, Informs That FSAR Figure 17.2-2 Re QA Organizational Chart Not Updated in FSAR Amend 38.Figure Will Be Updated in Next FSAR Amend to Correspond to Encl Figure 1-3 of Operational QA Manual

From kanterella
(Redirected from U-600691)
Jump to navigation Jump to search
Informs That FSAR Figure 17.2-2 Re QA Organizational Chart Not Updated in FSAR Amend 38.Figure Will Be Updated in Next FSAR Amend to Correspond to Encl Figure 1-3 of Operational QA Manual
ML20203L654
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/26/1986
From: Spangenberg F
ILLINOIS POWER CO.
To: Butler W
Office of Nuclear Reactor Regulation
References
U-600691, NUDOCS 8608290033
Download: ML20203L654 (2)


Text

___ _-___ .. __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

t U- 600691

, L30-86( 08-26)-L 1A.120 ILLINDIS POWER COMPANY CLINTON POWER STATION. P.o. BOX 678. CLINTON, ILLINOIS 61727 August 26, 1986 Docket No. 50-461 Director of Nuclear Reactor Regulation Attention: Dr. W. R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing U. S. Nuclear Regulatory Con. mission Washington, DC 20555

Subject:

Clinton Power Station Quality Assurance Organization

Dear Dr. Butler:

In Clinton Power Station (CPS) Final Safety Analysis Report (FSAR)

Amendment 38, organizational changes were made within Section 17.2 as a result of Revision 16 to the Illinois Power Operational Quality Assurance (QA) Manual. Among the changes made were the deletion of the Director - Construction and Procurement QA, Supervisor - Construction QA l

and the QA Administrative Section.

Although the FSAR text was updated, the corresponding figure which shows the QA organizational chart, FSAR Figure 17.2-2, was not updated in Amendment 38. This figure will be updated in the next FSAR Amendment to correspond to Figure 1-3 of the Operational QA Manual (attached).

If you have any questions on this matter, please contact us.

Sincerely yours,

/ l r .h . 3 J

F. A. pang bergf Manager - L censing and Safety Attachment N

JLP/kaf ec: B. L. Siegel, NRC Clinton Licensing Project Manager Regional Administrator, Region III, USNRC i NRC Resident Office Illinois Department of Nuclear Safety f0 0 8608290033 860826 PDR ADOCK 05000461 b'I H PDR

p- n -

. n-

. CN IRQ.A. ORGANIZATION .Eis 19 A PRESIDENT

>g "8

Ec EXECUTIVE 2m VICE -- , ON PRESIDENT *

, o 5 l

  • ~

W '

8

$mE

> -i VICE 5 PRESIDENT I I "o z

a l 8

$ MANAGER QUALITY ---J 8

ASSURANCE p.

- ',i s

. j* '

DIRECTOR l

DIRECTOR DIRECTop ENhlNE G8 M[NITNR N VERIFICATION PROGRAM shf!hg gu y g '

t R.

SUPERYlSOR SUPERVISOR SUPERVISOR UP SOR OUALITY QUAllTY QUAllTY SUPERVISOR SUPERVISOR OPERATIONS 8 P.._ E- "**T OUALIT Y AUDITS CONTROL TECHNICAL QA SYSTE.*?3 MAINTENANCE SUPPORT ,

, .h.

  • i t

NE8 s *'

  • C; 4 2i ,

-. m v.

W k5 g ' $ .

, FIGURE I-3 ll

. v.