U-600335, Forwards Rev 14 to Illinois Nuclear Power Const QA Manual, Reflecting Recent Changes to Organization & Responsibilities

From kanterella
Jump to navigation Jump to search
Forwards Rev 14 to Illinois Nuclear Power Const QA Manual, Reflecting Recent Changes to Organization & Responsibilities
ML20137R885
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/25/1985
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20137R888 List:
References
U-600335, NUDOCS 8512060109
Download: ML20137R885 (1)


Text

q U- 600335 L34-85(11-25)-L 1A.120 IILIN018 POWER COMPANY CLINTON POWER STATION. P.O. 80X 678, CUNTON, ILUNots 61727 [

November 25, 1985 8

= "mun Docket No. 50-461 3- :' ^ r- fD L[p A.

Mr. James G. Keppler Regional Administrator pg y JL, i Wl ' C{

~~

Region III U. S. Nuclear Regulatory Commission hlE f 2 E- - N C

Caas-799 Roosevelt Road /

Glen Ellyn, Illinois 60137 oN# A,f g Clinton Power Station b&C ~

Subject:

Construction QA Manual - Revision 14

Dear Mr. Keppler:

Enclosed is Revision 14 of the Illinois Power Nuclear Power Construction Quality Assurance Manual dated October 11, 1985, reflecting recent changes to the Illinois Power Company organization and responsibilities. This submittal is provided in accordance with the requirements of 10CFR50.55(f)(3).

A matrix of changes has been enclosed for your convenience.

The changes to the subject QA manual have been evaluated by Illinois Power Company as not reducing the quality program commitments. Please contact me if you have any questions.

Sincerely yours,

. . Hall Vice President JLP/kaf Enclosures cc: B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety NRC Office of Inspection and Enforcement U. S. NRC Document Control Desk, Washington, DC B512060109 B51125 gon ancx oma*J2

,NOV 271985 l\ * / a