Pages that link to "ML20207S418"
Jump to navigation
Jump to search
The following pages link to ML20207S418:
Displayed 50 items.
- IR 05000311/1987005 (← links)
- IR 05000272/1997003 (← links)
- IR 05000272/1985024 (← links)
- IR 05000272/1985029 (← links)
- ML20137N586 (← links)
- ML20137B602 (← links)
- IR 05000272/1996013 (← links)
- ML20135B268 (← links)
- ML20135A946 (← links)
- ML20134B674 (← links)
- IR 05000272/1985016 (← links)
- PNO-I-85-075, on 851006,plant Tripped.Caused by Condensation in Condenser Vacuum Sensing Line Reaching Sensor Causing Turbine Trip W/Automatic Reactor Trip.Plant in Cold Shutdown for Maint & Mod to Condenser (← links)
- ML20133A449 (← links)
- ML20133A434 (← links)
- IR 05000272/1985009 (← links)
- PNO-I-85-044, on 850628,RCS Water Inventory Balance Indicated Unidentified Leak Rate Increased from 0.72 Gpm (Tech Spec Limit Is 1.0 Gpm) on 850627 & Steam Observed Leaking from Inlet Flange of Pressurizer Relief Valve PR-4 (← links)
- IR 05000272/1992021 (← links)
- IR 05000272/1985012 (← links)
- IR 05000272/1985008 (← links)
- PNO-I-92-075, upon Investigation of Alarm Printed Out on Auxiliary Typewriter on 921213,operators Determined That Cpu for Overhead Annunciator (Oha) Had Failed to Perform, Resulting in Loss of Oha Sys for 1 H & 41 Minutes (← links)
- IR 05000272/1986002 (← links)
- ML20154D456 (← links)
- ML20151Y123 (← links)
- ML20151X972 (← links)
- ML20151X655 (← links)
- ML20151X542 (← links)
- ML20151U957 (← links)
- ML20151U393 (← links)
- ML20151U128 (← links)
- PNO-I-98-057, on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal (← links)
- IR 05000272/1986009 (← links)
- ML20198B365 (← links)
- IR 05000272/1985098 (← links)
- ML20197C965 (← links)
- IR 05000272/1999001 (← links)
- IR 05000272/1987005 (← links)
- IR 05000311/1987006 (← links)
- PNO-I-86-061, on 860806,equipment Qualification Discrepancy Identified W/Field Wiring within Limitorque Valve Operators in Containments.Both Units Shut Down to Replace Questionable Wires W/Qualified Wires (← links)
- PNO-I-86-054, on 860721,licensee Initiated Normal Shutdown from 100% Power to Inspect & Correct Main Generator Hydrogen Leak Into Stator Cooling Water Sys.Completion of Insp & Repairs Expected in Approx 7 Days (← links)
- IR 05000272/1986007 (← links)
- ML20202F136 (← links)
- IR 05000272/1986026 (← links)
- IR 05000272/1987003 (← links)
- ML20207S404 (← links)
- IR 05000272/1986023 (← links)
- PNO-I-86-075, on 860916,operators Removed Unit 1 from Svc to Repair Steam Leak on High Pressure Turbine Steam Return Line.Leak Caused by Steam Erosion on Section of 20-inch Pipe.Affected Section of Pipe Replaced (← links)
- IR 05000272/1986028 (← links)
- IR 05000272/1986027 (← links)
- PNO-I-86-066, on 860826,turbine Trip/Reactor Trip & Safety Injection Occurred During Troubleshooting on Steam Generator Level Indicator 22.Natural Circulation Established & Third Vital Bus & Nonvital Loads Reenergized (← links)
- IR 05000311/1986035 (← links)