Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20162A153 + (Summary of June 8, 2020, Partially Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment)
- ML20163A172 + (Summary of June 9, 2020, Pre-Submittal Meeting with Exelon Generation Company, LLC, Regarding Planned License Amendment Request to Modify Surveillance Requirement 3.6.1.3)
- ML22168A164 + (Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants)
- ML12045A534 + (Summary of June, 2011, Telconference Meetings with TVA Regarding Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 7, I & C)
- ML19331B191 + (Summary of Kansas Periodic Meeting to Discuss Status of Kansas Agreement State Program)
- ML23325A178 + (Summary of Key Differences Between Kairos Hermes 1 and Hermes 2 Facility Designs and Review Schedule for Kairos Hermes 2 Construction Permit Application)
- ML20245C850 + (Summary of LC Rouse,Jj Swift & Rd Hurt 890403-04 Site Visit Re Licensee Plans for Terminating Licenses)
- ML19289G132 + (Summary of LER Subcommittee 790207 Meeting in Washington,Dc Re ACRS Review of LERs for 1976-78)
- ML20049H970 + (Summary of LWR Safety Research in the U.S.A.,Presented at the International Conference on Nuclear Power & ITS Fuel Cycle Held at Salzburg (Austria) on May 2-3,1977)
- ML100290453 + (Summary of Lessons Learned Oversight Board Meeting to Discuss If They Met the Management Directive 6.8 Lessons-Learned Program Criteria)
- ML20082A511 + (Summary of Levels of Nuclear Property Insurance Maintained by Util)
- ML102500562 + (Summary of License Renewal Meeting Between NRC and NEI to Discuss Current License Renewal Topics and Process Improvements)
- ML033210401 + (Summary of License Renewal Meeting Between the U.S.Nuclear Regulatory Commission (NRC) Staff and the NEI License Renewal Working Group; Duke for the Mcguire and Catawba Nuclear Stations, Units 1 and 2; FPL, for St. Lucie, Units 1 and 2.)
- ML040920461 + (Summary of License Renewal Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and the NEI, H. B. Robinson, R.E. Ginna, Etc. - Slides)
- ML010190047 + (Summary of License Renewal Meeting Between the NRC and the NEI License Renewal Working Group; ANO-1 SNC for Hatch Nuclear Plant, Units 1 and 2 and for FPL for Turkey Point Units 3 and 4)
- ML030780584 + (Summary of License Renewal Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and the NEI License Renewal Working Group; Duke for the Mcguire and Catawba Nuclear Stations, Units 1 and 2; Exelon for the Peach Bottom Atomic Po)
- ML040860665 + (Summary of License Renewal Meeting Between NRC & NEI, Cp&L, H.B. Robinson, Rg&E, R.E. Ginna, Sce&G, V.C. Summer, Exelon, Dresden & Quad Cities, Snoc, Farley, Entergy, Arkansas One, Unit 2 and I&M, D.C. Cook)
- ML053540029 + (Summary of License Renewal Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and the Nuclear Energy Institute (NEI) License Renewal Working Group)
- ML022180220 + (Summary of License Renewal Meeting Between NRC Staff, Nuclear Energy Inst. (NEI) & Utilities to Discuss Status of License Renewal Activities)
- ML082480547 + (Summary of License Renewal Meeting Held Between Us Nuclear Regulatory Commission Staff and Nuclear Energy Institute to Discuss Industry Comments on Draft License Renewal Interim Staff Guidance 2008-01)
- ML12219A375 + (Summary of License Renewal Open House Meeting for South Texas Project)
- ML003696960 + (Summary of License Renewal Steering Committee Meeting with the License Renewal Working Group)
- ML093380260 + (Summary of License Renewal Teleconference Meeting Between NRC Staff and the Nuclear Energy Institute Regarding Small Bore Piping Socket Welds)
- ML060200507 + (Summary of License Renewal Telephone Conference Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force)
- ML062340160 + (Summary of License Renewal Telephone Conference Call and Meeting Held Between the Us NRC and NEI)
- Information Notice 1995-24, Summary of Licensed Operator Requalification Inspection Program Findings + (Summary of Licensed Operator Requalification Inspection Program Findings)
- ML091980363 + (Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes)
- ML20199E160 + (Summary of Licensing Support Sys Interagency Coordinating Committee 860220 Meeting to Develop Licensing Support Sys & Review Proposed Draft Charters)
- ML20236B450 + (Summary of Liquid & Gaseous Effluents Released;1988 Fuel Cycle Calculations;1988 Meterological Survey & Solid Waste Rept)
- ML20248B085 + (Summary of Liquid & Gaseous Effluents Released)
- 0CAN121901, Summary of Lost Specimens Investigation Report + (Summary of Lost Specimens Investigation Report)
- ML16341C569 + (Summary of MD Trifunac Comments During ACRS 840614 Meeting in Washington,Dc Re Reevaluation of Facility Seismic Design)
- ML17268A073 + (Summary of Major Comments from ACRS Sub 08/24/2017 (ADAMS))
- ML20125D639 + (Summary of Major Points Agreed Upon at 791203 Meeting Re GEIS Comment Resolution)
- ML050490454 + (Summary of Management Meeting (Public Mtg) Between PSEG and NRC Ref: Hope Creek Tech Issues/Sit)
- ML040701151 + (Summary of Management Meeting at Region II Office)
- ML25085A014 + (Summary of March 05 2025 - NRC 50.69 Public Meeting Workshop)
- ML25058A198 + (Summary of March 10 2024 NRC Public Meeting with PWROG Executive Committee)
- ML21077A268 + (Summary of March 10, 2021, Public Meeting with Holtec International to Discuss Pre-Application of Shielding Method of Evaluation Topical Report)
- ML25086A084 + (Summary of March 10, 2025, Public Observation Meeting Preapplication Meeting for Planned License Amendment Request for Change to Main Steam Line Technical Specifications)
- ML20104A038 + (Summary of March 11, 2020 Meeting Regarding Global Nuclear Fuel (Gnf) Update on Accident Tolerant Fuel (ATF) Licensing Plans)
- ML21085A211 + (Summary of March 11, 2021 Meeting with Orano Federal Services & Encl 1 Meeting Attendees)
- ML22088A197 + (Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections)
- ML18088A077 + (Summary of March 12, 2018 Public Meeting Regarding ITP and Sead 3 for NRC-Licensed Facilities)
- ML17276A086 + (Summary of March 12, 2018, Pre-Application Meeting with Southern Nuclear Company, Inc., to Discuss a Future Risk-Informed Completion Times Amendment)
- ML25098A098 + (Summary of March 13 and 14, 2025, Information Public Meeting to Discuss Lessons Learned Related to Digital Instrumentation and Controls Licensing Activities)
- ML020990008 + (Summary of March 13, 2002 Telephone Conversation on the Davis-Besse Reactor Vessel Head Degradation Follow-up)
- ML19149A594 + (Summary of March 13, 2019, Meeting with Florida Power & Light Company Regarding a Planned License Amendment Request for St. Lucie Plant, Unit 2)
- ML23076A064 + (Summary of March 13, 2023, Public Meeting Between Office of Nuclear Regulation Management and Pressurized Water Owners Group Executive Committee to Discuss Top Focus Areas by Each Entity in 2023)
- ML110810972 + (Summary of March 14, 2011, Meeting with Exelon to Discuss Proposed Main Steam Safety Valve License Amendment Request)
- ML18073A255 + (Summary of March 14, 2018 Public Meeting with KHNP to Discuss Human Factors Engineering)