MONTHYEARML23152A2552023-06-0505 June 2023 Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML22178A2312022-06-28028 June 2022 Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station ML22088A1972022-03-30030 March 2022 Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22084A1022022-03-27027 March 2022 Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML22077A8062022-03-23023 March 2022 Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML21314A5362021-11-18018 November 2021 Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds at ML21266A0652021-09-23023 September 2021 NEI Presentation - ROP Public Meeting 09232021 (002) ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML20196L6582020-07-14014 July 2020 July 28, 2020 Public Meeting Notice on Spent Fuel Performance Margins Meeting ML19298B1102019-11-0101 November 2019 Summary of October 17, 2019, Meeting with NEI Regarding Draft Regulatory Guide-1351, Dispositioning of Technical Specifications That Are Insufficient to Ensure Plant Safety ML19249C7112019-09-0404 September 2019 Summary of the July 18, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station ML18331A3702018-12-0303 December 2018 Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding Use of New Probabilistic Risk Assessment Methods ML18313A1982018-11-14014 November 2018 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Post-Shutdown Emergency Plan for Davis-Besse Nuclear Power Station ML18208A3322018-07-27027 July 2018 Member Comments on Draft SSHAC Report ML18192A6522018-07-10010 July 2018 Summary of Public Meeting to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML17258A1462017-09-20020 September 2017 Summary of September 12, 2017, Meeting with Firstenergy Nuclear Operating Company Regarding Its Licensing Amendment Request to Adopt National Fire Protection Association Standard 805 at Davis-Besse Nuclear Power Station, Unit No. 1 ML17227A0302017-09-0505 September 2017 Summary of Meeting with the Nuclear Energy Institute on NEI 15-03, Revision 1, Licensee Actions to Address Nonconservative Technical Specifications ML17229B1362017-08-16016 August 2017 Summary of July 19, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17087A1882017-03-28028 March 2017 Summary of Closed Meeting with Firstenergy Nuclear Operating Company Regarding Changes to the Davis-Besse Nuclear Power Station, Unit No. 1, Security Plan ML16197A0522016-07-14014 July 2016 Summary of June 21, 2016, Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Station ML16130A7502016-05-12012 May 2016 Summary of April 12, 2016, Teleconference Regarding Steam Generator Tube Inservice Inspection ML14177A5782016-02-22022 February 2016 November 13, 2013, Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Delay in Submittal of Fire Risk Reduction Amendment Request ML16006A3512016-01-20020 January 2016 December 17,2015 Summary of Meeting with Firstenergy Nuclear Operating Company on Its License Amendment Request to Revise the Emergency Diesel Generator Surveillance Requirements at Davis-Besse Nuclear Power Station, Unit 1 ML16007A3962016-01-12012 January 2016 Summary of January 5, 2016, Meeting with Firstenergy Nuclear Operating Company on Its Planned License Amendment Request to Revise the Emergency Action Level Scheme at Davis-Besse Nuclear Power Station, Unit No. 1 ML15196A5162015-07-24024 July 2015 Summary of Telephone Conference Call Held on May 06, 2015, and May 19, 2015 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML15170A2862015-06-18018 June 2015 Summary of the Public Open House Regarding Davis-Besse Nuclear Power Station ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15056A4562015-04-20020 April 2015 Summary of Teleconference Call Held February 20, 2015, Between U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14224A6142014-08-12012 August 2014 Summary of Public Meeting to Discuss the 2013 Performance of Davis-Besse Nuclear Power Station ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 ML14099A3392014-04-22022 April 2014 March 27, 2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and First Energy Nuclear Operating Company Concerning Commitment 13 of the Safety Evaluation Report Pertaining to the Davis Besse Unit 1, Licens ML14080A1842014-03-21021 March 2014 Summary of Webinar Meeting to Discuss NRC Inspection Activities Associated with the Davis-Besse Nuclear Power Station Installation of Two New Steam Generators ML13240A0702013-08-29029 August 2013 8 22 2013 DB NRC Telecon Summary License Condition ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13182A4082013-07-17017 July 2013 Summary of Telephone Conference Call Held on October 16, 2012, Between NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA (TAC No. ME640) ML13197A2572013-07-17017 July 2013 5 28 2013 DB Hs Bolts Telecon Summary ML13149A2862013-07-12012 July 2013 Summary of Telephone Conference Call Held on May 2, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station License Renewal Application ML13182A4432013-07-12012 July 2013 Summary of Telephone Conference Call Held on April 11, 2013, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Powe ML13149A2882013-07-0909 July 2013 May 9, 2013, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Stat ML13168A2422013-06-14014 June 2013 6/11/2013 - Summary of Open House to Discuss the 2012 Davis-Besse Nuclear Power Station End-Of-Cycle Performance ML13091A3272013-03-29029 March 2013 Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities ML13051A0682013-03-26026 March 2013 January 16, 2013 Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML13051A6602013-03-26026 March 2013 Summary of Telephone Conference Call Held on January 23, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA ML13025A0272013-02-14014 February 2013 October 23, 2012 Summary of Telephone Conference Call Held Between the Nuclear Regulatory and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station, License ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12243A2832012-08-30030 August 2012 Summary of Public Meeting to Discuss Nrc'S Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks 2023-06-05
[Table view] |
Text
April 10, 2002 MEMORANDUM TO: Stephanie M. Coffin, Section Chief Structural Integrity & Metallurgy Section Materials and Chemical Engineering Branch FROM: Steven D. Bloom, Lead Project Manger for Bulletin 2002-01(RA by SDB)
Structural Integrity and Metallurgy Section Materials and Chemical Engineering Branch
SUBJECT:
SUMMARY
OF MARCH 13, 2002 TELEPHONE CONVERSATION ON THE DAVIS BESSE REACTOR VESSEL HEAD DEGRADATION FOLLOW-UP This memorandum is written to document the telephone conversation which occurred on March 13, 2002, between the Nuclear Energy Institute (NEI), the Electric Power Research Institute (EPRI)/Materials Reliability Program (MRP), and the NRC. The NRC was represented by Brian Sheron, Jack Strosnider, William Bateman, and Steven Bloom, while the MRP was represented by Mike Short, Chairman of the Issues and Integration Group (IIG).
Mike Short stated that the MRP was working with the Davis Besse root cause investigation team to determine the potential effect of the Davis Besse findings on other licensees. He stated that he expected the wastage issue to be attributed to boric acid. MRP developed a request for information from all licensees following the previous telephone conversations between the NRC and the MRP on March 8, 2002. (See ML020700711)
The MRP asked four questions of all pressurized water reactors (PWRs), which they paraphrased:
- 1. At your most recent inspection, did you do a sufficient visual examination over 100% of the head to have detected external surface corrosion or accumulation of boric acid crystals?
- 2. If the visual inspection was not 100% (or was in some way hampered), can you confidently say that you dont have external head corrosion?
- 3. If ultrasonic testing (UT) or another non-visual approach was used at your most recent inspection, was the UT examination capable of detecting corrosion of the low alloy steel head material (changes in back reflection)? Did you perform a full length UT of the RPV nozzles to the top of the head?
- 4. For plants with spring 2002 outages (all susceptible classes), what plans can you make/how will you show that there is not significant boric acid corrosion?
The MRP stated that they had received responses from all plants and that they would talk about them at the meeting on March 19, 2002. The MRP indicated they were considering, or doing the following:
- 1. Develop inspection guidance for future inspections. This guidance would address leakage from above the head and the potential for leakage from vessel head penetration nozzles.
- 2. MRP members are part of the Davis Besse root cause effort and will conduct a review of the findings for generic implications.
- 3. The owners groups in the last decade has performed substantial work on wastage from boric acid and will review this information in light of the Davis Besse event. They will also look at how plants responded to Generic Letter 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants.
The MRP stated that the author of the EPRI Boric Acid Corrosion Guide Book, is on the Davis Besse root cause team.
- 4. Incorporate the Davis Besse findings into the control rod drive mechanism (CRDM) risk assessment findings.
The MRP stated that the information they collected from their survey would address NRCs questions 1 and 2 of Brian Sherons letter dated March 11, 2002 (ML020700711). They stated that question 3 will take more time to answer. The NRC discussed a potential need for a justification for continued operation for some plants if the next outage of opportunity for an inspection of the RPV head is not scheduled for another year.
Project Number 0689 CONTACT Steven D. Bloom, NRR/EMCB 415-1313 The MRP stated that they had received responses from all plants and that they would talk about them at the meeting on March 19, 2002. The MRP indicated they were considering, or doing the following:
- 1. Develop inspection guidance for future inspections. This guidance would address leakage from above the head and the potential for leakage from vessel head penetration nozzles.
- 2. MRP members are part of the Davis Besse root cause effort and will conduct a review of the findings for generic implications.
- 3. The owners groups in the last decade has performed substantial work on wastage from boric acid and will review this information in light of the Davis Besse event. They will also look at how plants responded to Generic Letter 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants.
The MRP stated that the author of the EPRI Boric Acid Corrosion Guide Book, is on the Davis Besse root cause team.
- 4. Incorporate the Davis Besse findings into the control rod drive mechanism (CRDM) risk assessment findings.
The MRP stated that the information they collected from their survey would address NRCs questions 1 and 2 of Brian Sherons letter dated March 11, 2002 (ML020700711). They stated that question 3 will take more time to answer. The NRC discussed a potential need for a justification for continued operation for some plants if the next outage of opportunity for an inspection of the RPV head is not scheduled for another year.
Project Number 0689 CONTACT Steven D. Bloom, NRR/EMCB 415-1313 DISTRIBUTION EMCB R/F WHBateman ADAMS/ACCESSION No.: ML020990008 OFFICE DE:L Proj Mgr DE:SC NAME SDBloom SMCoffin DATE 04/10/02 04/10/02 OFFICIAL RECORD COPY