Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Sixth Interval Inservice Testing (1ST) Plan". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20092K350  + (Sixth Interim Deficiency Rept Re Seismic Analysis of Auxiliary Control Bldg.Initially Reported on 820226.Div of Engineering Design Engineering Procedure 3.03 Revised.Next Rept Will Be Submitted by 841019)
  • ML20058D027  + (Sixth Interim Deficiency Rept Re Seismic Qualification of B&W Equipment in TVA Panels.Initially Reported on 801124.Two Hundred fifty-three B&W Devices Acceptable.Remaining 32 Under re-evaluation.Next Rept Expected 820927)
  • ML20053E900  + (Sixth Interim Deficiency Rept Re Significant Const Deficiency 17 Concerning Base Metal Defect in Main Steam & Feedwater Containment Penetration Anchors.Final Rept Delayed to 820831 Due to Secondary Flush & Chemical Cleaning)
  • ML20052G588  + (Sixth Interim Deficiency Rept Re Source Insp,Initially Reported on 810120.Util Continuing Evaluation of Results of Insp of Equipment & Matl Purchased & of Generic Implications.Next Rept Due by 820827)
  • ML20062C699  + (Sixth Interim Deficiency Rept Re Steam Pressure Regulator Malfunction.Initially Reported on 810519.Util in Tentative Agreement W/B&W Findings & Details of Analysis Requested. Next Rept Expected by 821012.Also Reported Per Part 21)
  • ML19323E409  + (Sixth Interim Deficiency Rept Re Tensile Anchor Capacities Lower than Design Allowable.Testing & Evaluation Programs for Welded Stud Anchors W/Flexible Plate Connections in Progress)
  • ST-HL-AE-2439, Sixth Interim Deficiency Rept Re Veritrak Transmitters. Initially Reported on 870801.Temp Compensation Shift on Transmitter Capsules No Longer Concern,Per Westinghouse Testing.Amplifier Being Tested.Next Rept by 880331  + (Sixth Interim Deficiency Rept Re Veritrak Transmitters. Initially Reported on 870801.Temp Compensation Shift on Transmitter Capsules No Longer Concern,Per Westinghouse Testing.Amplifier Being Tested.Next Rept by 880331)
  • ML20076H769  + (Sixth Interim Deficiency Rept Re Viking Flow Control Valves in Fire Protection Sys.Initially Reported on 811124.Drawing Rev Review Continuing.Next Rept to Be Submitted by 830809. Also Reportable Per Part 21)
  • ML20040F854  + (Sixth Interim Deficiency Rept Re Water in Rock Anchor Tendon Head Protective Grease Cans,Initially Reported 790523.Water Being Pumped from 23 Holes in Unit 1 Tendon Gallery Floor to Lower Groundwater Level.Next Rept Expected 820512)
  • ML20055A792  + (Sixth Interim Deficiency Rept Re Weld Designation Discrepancy in Detail Sheets Supplied by Itt Grinnell for Pipe Hangers & Supports,Initially Reported 800905.Detail Sheets Revision Continuing.Also Reportable Under Part 21)
  • ML20009H641  + (Sixth Interim Deficiency Rept Re Welding of Structural Steel Annulus Floor Framing,Initally Reported on 800415.Util Is Continuing Reinsp of Welds Identified for Sampling by MIL- Std 105d.Next Rept by 811029)
  • ML20090H196  + (Sixth Interim Deficiency Rept of Significant Const Deficiency 57 Re Inadequate Instrumentation & Control Installations & Turnover Documentation.Initially Reported on 830729.Final Rept Will Be Submitted by 840215)
  • ML20076C051  + (Sixth Interim Deficiency Rept on Q-related Equipment Cooled by non-Q HVAC Sys.Bechtel Reviewing Safety Function of Class IE Devices to Determine safety-related Implications of Equipment Failure Following Dbas.Next Rept by 831115)
  • ML20077D394  + (Sixth Interim Deficiency Repts 81-30 & 81-33 Re Generic Implications of Failure to Implement Design Criteria in Design Drawings.Initially Reported on 810401.Review of Functional Control Logic Diagrams Complete.Next Rept 831021)
  • ML20100N926  + (Sixth Interim Part 21 & Deficiency Rept,Item 101 Re Defective Governor Drive Coupling Installed in Tdi Emergency Diesel Generator Sets.Initially Reported on 820909.Final Rept Will Be Submitted by 850415)
  • ML20023D490  + (Sixth Interim Rept Re Significant Const Deficiency Rept 54 on Tube Steel (HT-166) Lamination.Corrective Action Completed by Replacing 240 Ft of Tube Steel Installed in safety-related Sys.Final Rept Delayed Until 830623)
  • ML20023C461  + (Sixth Interim Rept of Significant Const Deficiency Rept 35 Re Matl Properties of Tube Track & Welding Fittings.Jc White Fittings Tested by Lucious Pitkins,Inc.Corrective Actions Will Be Completed 830630.Final Rept by 830720)
  • W3P84-2673, Sixth Interim Rept of Significant Const Deficiency 90 Re Electric Conduit Overstress.Approx 1,000 Conduits Require Reinsp.Completion of Walkdowns,Evaluation & Rework Expected by mid-Oct.Final Rept to Be Submitted by 841026  + (Sixth Interim Rept of Significant Const Deficiency 90 Re Electric Conduit Overstress.Approx 1,000 Conduits Require Reinsp.Completion of Walkdowns,Evaluation & Rework Expected by mid-Oct.Final Rept to Be Submitted by 841026)
  • ML20097C574  + (Sixth Interim Rept of Significant Const Deficiency 90 Re Electrical Conduit Overstress.Initially Reported on 840816. Final Rept to Be Provided on 840921)
  • ML20023E071  + (Sixth Interim Rept of Significant Const Deficiency 37 Re Failures of Resistance Temp Detectors (Rtd).Due to Restrictions Placed on Entering RTD Cabinets During Testing, Submittal of Final Rept Delayed Until 830812)
  • ML20053B964  + (Sixth Interim Rept on Significant Const Deficiency Re Defective Valve Actuators (Fisher Controls),Initially Reported 820111.Replacement of Three Spring Cans & Set of Piston Seals Recommended.Final Rept by 821015)
  • ML20080H951  + (Sixth Interim Significant Const Deficiency Rept 78 Re American Bridge Structural Steel Defects.Addl Work Required to Complete Two Nonconformance Repts.Final Rept Will Be Submitted on 840309)
  • ML20078R801  + (Sixth Interim Significant Const Deficiency Rept 66 Re Defective GE Type Akr Breakers.Verification of Supporting Documentation Will Be Completed in Late Nov 1983.Final Rept Will Be Submitted on 831208)
  • ML20079L959  + (Sixth Interim Significant Const Deficiency Rept 60 Re Turnover Documentation & Inadequate Hanger Weld Problems. Documentation Review Still in Progress.Final Rept Will Be Submitted on 840316)
  • ML20078R438  + (Sixth Interim Significant Deficiency Rept 32 Re Stress Analysis for Welding Pipe Support Attachments Not Performed Prior to Fabrication.Final Rept Expected by 840203)
  • ML20115H617  + (Sixth Maint/Refueling Outage (1R6) Owners Rept for ISI for Vogtle Electric Generating Plant Unit 1)
  • ML20070V767  + (Sixth Motion for Summary Disposition of Contention NH-13 on Compliance w/NUREG-0737 Re Personnel Qualifications & Training.No Genuine Issue of Matl Fact Exists.Related Correspondence)
  • ML21225A572  + (Sixth Notice of Supplemental Disclosures)
  • ML20092K610  + (Sixth Part 21 & Deficiency Rept Item 80 Re Pressure Sensing Line in Starting Air Sys for Tdi Emergency Standby Diesel Generator Sets.Initially Reported on 820419.Also Reported by Tdi Per 10CFR21)
  • ML20088A721  + (Sixth Part 21 Deficiency Rept,Item 61 Re Defective Valve Springs Mfg by Transamerica Delaval,Inc (Tdi) on Diesel Engines.Initially Reported on 810828.TDI Removed Defective Springs.Final Rept by 840908)
  • ML20093D800  + (Sixth Part 21/Deficiency Repts NCR 1819,2170,2186,2187 & 2231 Re Failure of Basics Inflow,Inc Butterfly Valve Seats. Initially Reported on 820511.All Valves Subj to Deficiency Repaired)
  • ML20235X753  + (Sixth Partial Response to FOIA Request Re Plant Operation & Piping Deficiencies.Forwards Documents Listed in App N.App N Documents Also Available in PDR & Responsive to Requests FOIA-84-744 & FOIA-84-776)
  • ML20151K323  + (Sixth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App I.Documents Listed in App J Already Available in PDR)
  • ML20141L908  + (Sixth Partial Response to FOIA Request for Documents.Records in App F Being Withheld in Entirety (Ref Exemption 7A))
  • ML20140F148  + (Sixth Partial Response to FOIA Request for All Records Re Enforcement Action EA-84-93 for Facility.Portion of App X Withheld (Ref FOIA Exemption 5).Apps V & W & Portion of App X Available in PDR)
  • ML20140B822  + (Sixth Partial Response to FOIA Request for All Records Re Enforcement Action EA-84-93 for Facility.Portion of App X Withheld (Ref FOIA Exemption 5).Apps V & W & Portion of App X Available in PDR)
  • ML20154D992  + (Sixth Partial Response to FOIA Request for Documents. Documents Listed in App I Being Withheld in Part (Ref FOIA Exemption 5))
  • ML20203A035  + (Sixth Partial Response to FOIA Request for Documents. Documents Listed in App G Withheld in Entirety (Ref FOIA Exemption 5))
  • ML20204B908  + (Sixth Partial Response to FOIA Request for Records.App K Records Being Made Available in PDR & Encl)
  • ML20211L122  + (Sixth Partial Response to FOIA Request for Documentation Re Region IV Allegation Data Forms from 830101-850820.App K Document Partially Withheld & App L Documents Completely Withheld (Ref FOIA Exemptions 6 & 7))
  • ML20134C503  + (Sixth Partial Response to FOIA Request for Documents.App M Documents Encl & Being Made Available in Pdr.App N Records Copyrighted & Only Being Made Available for Insp in PDR)
  • ML20134C519  + (Sixth Partial Response to FOIA Request for Documents.App M Documents Encl & Being Made Available in Pdr.App N Records Copyrighted & Only Being Made Available for Insp in PDR)
  • ML20202J321  + (Sixth Partial Response to FOIA Request for Documents.Record Subj to Request Encl & Identified in App H)
  • ML20134J703  + (Sixth Partial Response to FOIA Request for Documents.App L Records Being Released in Part (Ref FOIA Exemption 7))
  • ML20134J707  + (Sixth Partial Response to FOIA Request for Documents.App L Records Being Released in Part (Ref FOIA Exemption 7))
  • ML20215H890  + (Sixth Partial Response to FOIA Request for Documents Re Allegations.Forwards App C & D Documents.App B Documents Also Available in PDR)
  • ML20134M933  + (Sixth Partial Response to FOIA Request for Documents.Records in App G Encl & Will Be Available in PDR)
  • IA-96-398, Sixth Partial Response to FOIA Request for Documents.Records in App G Encl & Will Be Available in PDR  + (Sixth Partial Response to FOIA Request for Documents.Records in App G Encl & Will Be Available in PDR)
  • ML20204B298  + (Sixth Partial Response to FOIA Request for Documents Re Communications with Gap.Forwards App E Documents.Documents Also Available in PDR)
  • ML20134F882  + (Sixth Partial Response to FOIA Request for Documents.Records in App K Encl & Available in Pdr.App L Records Encl & Being Withheld in Part (Ref FOIA Exemptions 4,5 & 6))