I LouisiamA P O W E R & LiG H T /Waterford 3 SES/P. O. Box B/Killona, LA 70066 SuNsEsSIU August 30, 1984 W3K84-2036 Q-3-A35.07.90 hh@/% %
Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission N
Th i
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 j
REFERENCE:
LP&L letter W3K84-1905 dated August 16, 19M
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 90
" Electrical Conduit Overstressed" Fifth Interim Report The above referenced letter indicated submittal of an Interim and/or Final Report to the USNRC on August 30, 1984.
At the present time, additional walkdowns are being conducted to verify corrective action and is scheduled to be completed in mid September 1984. The Final Report is scheduled to be submitted to the USNRC on September 21, 1984.
Very truly yours, T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 l
C l
B409170150 840830 0
PDR ADOCK 05000382 S
-w-q s '
i
?\\.-
Mr. John T. Collins August-30, 1984 W3K84-2036 Page 2 cc: Director
-Office of. Management Information and Program Control U. S. Nuclear Regulatory Commission
. Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814
-.