ML20023C461
| ML20023C461 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/11/1983 |
| From: | Maurin L LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3I83-0157, W3I83-157, NUDOCS 8305170351 | |
| Download: ML20023C461 (1) | |
Text
l I 0UISIANA P O W E R & L i G H T! P O BOX 6000
- 342 OuAnoNOE S am NEW ORLEANS LOUIStANA 70174 * (504) 366 2345
'iE0IE yS Eb u
L. V MAURIN Vice Presnient Nuclear Operahons May 11, 1983 W3I83-0157 Q-3-A35-07.35 Mr. John T. Collins Regional Administrator, Region IV p )@
qI U.S. Nuclear Regulatory Commission j
611 Ryan Plaza Drive, Suite 1000 g g 2@
Arlington, Texas 76012 Li
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency Report No. 35 -
" Material Properties of Tube Track and Welding Fittings" Sixth Interim Report
REFERENCE:
LP&L Letter W3I83-0099 dated November 15, 1982 jE-17
Dear Mr. Collins:
At the present time, tests on J.C. White tube track and welding fittings are being performed by an independent testing laboratory, Lucious Pitkins, Inc., in order to determine acceptability for use.
Testing and corrective action completion is currently scheduled for June 30, 1983. A final report will be submitted by July 20, 1983.
Very truly yours, L.V. Ma rin LVM: MAL:ys cc:
- 1) Director 3)
Mr. E.L. Blake Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555
- 2) Director 4)
Mr. W.M. Stevenson Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.
20555 8305170351 830517 DR ADOCK 05000382 PDR