ML20090H196
| ML20090H196 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/13/1983 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 57, W3K83-1549, NUDOCS 8310280012 | |
| Download: ML20090H196 (2) | |
Text
- _ ____-_______ -_______ _ __ _____ _
l l
l OUISIANA
}
POWE R & LiG H T/ Water ford 3 SES/P. O. Box B/Killona, LA 70066 EIU $SYS EM October 13, 1983 W3K83-1549 Q-3-A35.07.57
- Ef @[R {'vI7pc s
Mr. John T. Collins j
Regional Administrator, Region IV U. S. Nuclear Regulatory Commission OCT 2 01983 i1 611 Ryan Plaza Drive, Suite 1000 j
Arlington, Texas 76012 REFERENCF; LP&L letter W3I83-0254 dated July 29, 1983
~
I
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 57
" Inadequate Instrumentation & Control Installations & Turnover Documentation" Sixth Interim Report The above refere.nced letter indicated submittal of a Final Report to the USNRC no later than October 14, 1983.
At the present time, review of tile final documentation indicates remaining corrective action. This additional corrective action is scheduled to be completed by January 24, 1984. A Final Report will be submitted to the USNRC by February 15, 1984.
Very truly yours, W
Wu T. F. Gerrets Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8310280012 831013 PDR ADOCK 05000382 S
PDR l b.' 1 ~7
Mr. John T. Collins-October 13, 1963 W3K83-1549 Page 2 cc:. Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission 1 Washington, D.C.
20555' Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036
'Mr. W. M. Stevenson Monroe & Lemann a
1424 Whitney Building New Orleans, Louisiana 70130 4
a 4
'l