ML20053E900

From kanterella
Jump to navigation Jump to search
Sixth Interim Deficiency Rept Re Significant Const Deficiency 17 Concerning Base Metal Defect in Main Steam & Feedwater Containment Penetration Anchors.Final Rept Delayed to 820831 Due to Secondary Flush & Chemical Cleaning
ML20053E900
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/03/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, Q-3-A35.07.17, W3K82-0314, W3K82-314, NUDOCS 8206100191
Download: ML20053E900 (2)


Text

'

1 LOUISIANA 24, ouAnONOt smur P O W E R & L 1 G H T! P O BOX 6008

  • NEW ORdANS louts:* (504) 366 2345 ANA 70174

'assac J

' June 3, 1982 G D McLENDON Senior voce Prescent W3K82-0314

. Q-3-A35.07.17 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission __

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 3hh g't i t ,.. - 1

Subject:

Waterford SES Unit No. 3 ;6 i, i Docket No. 50-382 Id M lN M Significant Construction Deficiency No. 17

" Base Metal Defect in Main Steam and Feedwat-IQU i- .

Containment Penetration Anchors" Sixth Interim Report -

Reference:

1) LP&L Letter W3K82-0155 dated March 18, 1982
2) Telecon R. G. Bennett (LP&L) to L. Martin (NRC), 6/1/82

Dear Mr. Collins:

In reference 1, LP&L indicated that corrective action necessary to close Significant Construction Deficiency No. 17 would be complete and a Final Report submitted to the USNRC by June 1, 1982. Ilowever, the completion date is being restrained due to secondary flush and chemical cleaning.

Following this, construction will require approximately six to eight weeks to remove the temporary piping and complete the permanent piping instal-lati..a associated with the main steam and feed water systems.

Based on the above information, a final report will be submitted on or before August 31, 1982.

Very truly yours, GDMcL/LLB/ncd 8206100191 820603 PDR S ADOCK 05000382 sy,m 1

Mr. John T. Collins Page 2 cc: 1) Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20553 l

t l

_