Sixth Interim Rept Re Significant Const Deficiency Rept 54 on Tube Steel (HT-166) Lamination.Corrective Action Completed by Replacing 240 Ft of Tube Steel Installed in safety-related Sys.Final Rept Delayed Until 830623
ML20023D490
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/16/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
W3I83-0175, W3I83-175, NUDOCS 8305200542
Download: ML20023D490 (1)


Text

l_OUISI AN A

,42 De a nONOe S1neer POWER & L1GHT P O BOX 6008

  • NEW ORLEANS. LOUISlANA 70174. (504) 366-2345 MIOCLE SOUTH UTIUTIES SYSTEM May 16, 1983 W3183-0175 Q-3-A35.07.54 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency Report No. 54

" Tube Steel (HT-166) Lamination" Sixth Interim Report

REFERENCE:

LP&L letter W3I83-0092 dated March 21, 1983

Dear Mr. Collins:

At the present time, corrective action is completed on the replacement of 240 feet of (Ht-16600) laminated tube steel that was installed in safety related systems. As of now, approximately 80 feet of (Ht-16600) tube steel has not been located. A search is being conducted to assure that none of the missing tube steel is installed in safety related systems. In view of the above, a final report will be delayed until June 23, 1983.

Very truly 'ours,

/m m F. J. Drummond Project Support Manager-Nuclear FJD/ MAL /cmk cc:

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 TCO2 8305200542 830916 PDR ADOCK 05000382 S

PDR

- - - -