ML20023D490
| ML20023D490 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/16/1983 |
| From: | Drummond F LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| W3I83-0175, W3I83-175, NUDOCS 8305200542 | |
| Download: ML20023D490 (1) | |
Text
l_OUISI AN A
,42 De a nONOe S1neer POWER & L1GHT P O BOX 6008
- NEW ORLEANS. LOUISlANA 70174. (504) 366-2345 MIOCLE SOUTH UTIUTIES SYSTEM May 16, 1983 W3183-0175 Q-3-A35.07.54 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency Report No. 54
" Tube Steel (HT-166) Lamination" Sixth Interim Report
REFERENCE:
LP&L letter W3I83-0092 dated March 21, 1983
Dear Mr. Collins:
At the present time, corrective action is completed on the replacement of 240 feet of (Ht-16600) laminated tube steel that was installed in safety related systems. As of now, approximately 80 feet of (Ht-16600) tube steel has not been located. A search is being conducted to assure that none of the missing tube steel is installed in safety related systems. In view of the above, a final report will be delayed until June 23, 1983.
Very truly 'ours,
/m m F. J. Drummond Project Support Manager-Nuclear FJD/ MAL /cmk cc:
- 1) Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director 4)
Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 TCO2 8305200542 830916 PDR ADOCK 05000382 S
- - - -