Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25169A219 + (Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS))
- ML19009A093 + (Revision of One Procedure That Implements the Radiological Emergency Response Plan)
- ML19009A118 + (Revision of One Procedure That Implements the Radiological Emergency Response Plan)
- ML23232A001 + (Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13)
- ML24178A414 + (Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP))
- ML23296A253 + (Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) EPP 06-021 and Epf 06-021-01)
- ML18163A129 + (Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS))
- ML19247C071 + (Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan)
- ML21305A879 + (Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan)
- ML22255A103 + (Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan (RERP))
- ML20245E415 + (Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS))
- GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 + (Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020)
- L-14-285, Revision of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (Revision of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- ML24002A726 + (Revision of Pennstate Breazeale Reactor Requalification Plan)
- NRC 2003-0108, Revision of Pressure Temperature Limits Expiration Dates + (Revision of Pressure Temperature Limits Expiration Dates)
- ML033240022 + (Revision of Pressure Temperature Limits Expiration Dates)
- BSEP 08-0067, Revision of Proposed Alternative for the Fourth 10-Year Inservice Inspection Interval + (Revision of Proposed Alternative for the Fourth 10-Year Inservice Inspection Interval)
- ML22062A521 + (Revision of RG 5.71 (Draft Guidance 5061) Public Meeting Slides)
- ML22069A090 + (Revision of RG 5.71 - Draft Guidance 5061 - Public Meeting Transcript)
- ML22069A068 + (Revision of RG 5.71 -Draft Guidance 5061-Public Meeting Transcript)
- BSEP 12-0121, Revision of Regulatory Commitment Regarding Replacement of Core Plate Plugs + (Revision of Regulatory Commitment Regarding Replacement of Core Plate Plugs)
- BSEP 11-0106, Revision of Regulatory Commitment Regarding Replacement of Unit 2 Core Plate Plugs + (Revision of Regulatory Commitment Regarding Replacement of Unit 2 Core Plate Plugs)
- PMNS20201297, Revision of Regulatory Guide 1.183 + (Revision of Regulatory Guide 1.183)
- PMNS20210214, Revision of Regulatory Guide 1.183 + (Revision of Regulatory Guide 1.183)
- PMNS20210593, Revision of Regulatory Guide 1.183 + (Revision of Regulatory Guide 1.183)
- NLS2006051, Revision of Relief Request PR-02 + (Revision of Relief Request PR-02)
- ML032830262 + (Revision of Relief Request PR-89-34 for Repair of Reactor Pressure Vessel Head Penetration Nozzles, Millstone Power Station, Unit No. 2)
- BSEP 02-0163, Revision of Request for License Amendment - Frequency of Performance-Based Leakage Rate Testing + (Revision of Request for License Amendment - Frequency of Performance-Based Leakage Rate Testing)
- BSEP 07-0136, Revision of Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479 + (Revision of Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479)
- ULNRC-04993, Revision of Request for Relief from ASME Section XI Requirements in Order to Temporarily Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping by Weld Overlay Reinforcement + (Revision of Request for Relief from ASME Section XI Requirements in Order to Temporarily Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping by Weld Overlay Reinforcement)
- ULNRC-04942, Revision of Request for Relief from ASME Section XI Requirements in Order to Temporarily Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping by Weld Overlay Reinforcement + (Revision of Request for Relief from ASME Section XI Requirements in Order to Temporarily Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping by Weld Overlay Reinforcement)
- RNP-RA/14-0072, Revision of Requested Approval Date of License Amendment Request + (Revision of Requested Approval Date of License Amendment Request)
- LIC-03-0080, Revision of Response to Interim Compensatory Measure B.4.h of Interim Safeguards & Security Compensatory Measures Order + (Revision of Response to Interim Compensatory Measure B.4.h of Interim Safeguards & Security Compensatory Measures Order)
- ML042880368 + (Revision of Response to Request for Additional Information Waterborne Threat)
- ML20150A332 + (Revision of SLCs 16-11-2, 16-11-7 and Loes)
- NLS2010085, Revision of Safeguards Plan + (Revision of Safeguards Plan)
- ML23345A160 + (Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements)
- ML19249C667 + (Revision of Schedule and Level-of-Effort Estimates for Review of License Amendment Requests)
- ML023580338 + (Revision of Schedule for Conduct of Review of Virgil C. Summer Nuclear Station License Renewal Application)
- ML041460420 + (Revision of Schedule for Conduct of Review of Browns Ferry Nuclear Plant, Units 1, 2, and 3 License Renewal Application)
- ML040550582 + (Revision of Schedule for Conduct of Review of Arkansas Nuclear One, Unit 2, License Renewal Application)
- ML043560097 + (Revision of Schedule for Conducting the Review of Point Beach Nuclear Plant, Units 1 and 2 License Renewal Application)
- ML051800354 + (Revision of Schedule for Conducting the Review of the Donald C. Cook Nuclear Plant, Units 1 and 2, License Renewal Application)
- ML101310090 + (Revision of Schedule for Review for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 License Renewal Application)
- ML102700490 + (Revision of Schedule for Review of Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application)
- ML022590085 + (Revision of Schedule for Review of H.B. Robinson Steam Electric Plant, Unit 2, License Renewal Application)
- ML023240495 + (Revision of Schedule for Review of H.B. Robinson, Unit 2 License Renewal Application)
- ML101960636 + (Revision of Schedule for Review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application)
- ML102300092 + (Revision of Schedule for Review of the Indian Point Nuclear Generating Units 2 and 3, License Renewal Application)
- ML101260536 + (Revision of Schedule for Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application)
- ML100110063 + (Revision of Schedule for Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application)