Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses Allegation Followup on Advanced Medical Sys". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19317H460  + (Discusses Aircraft Crash Probability Issue & Testimony Re Us Air Flight 170 Over Tmi.Ltr from First Officer of Flight 170 & NRC 800429 Inquiry Encl.Nrc Will Not Comment on Ltr Until Reply from Pilot Is Received)
  • ML20211A729  + (Discusses Airflow Measurement & Control for supplied-air Respirators,In Response to Regional Inspector Request.Encl Lasl Memorandum Provides Suggestions for Using supplied-air Respirators.Ie Considering Drafting Info Notice)
  • ML19261E855  + (Discusses Airport Proximity to Facility Site Per Telecon W/ W Lowe & 680206 Ofc Visit W/G Charnoff)
  • ML19309C491  + (Discusses Aj Hazle 791219 Request for NRC Assessment of Potential Radiological Impact of U Mill Operation on Proposed Residential Subdivision.Results of NRC Evaluation Are Summarized in NRC to Hazle)
  • ML19224D576  + (Discusses Ak Morse 790521 Petition to Suspend License DPR-45.Addresses a Allegations Re Continuous Venting of Containment,Analysis of Liquefaction,Leakage,Pumpage,Fuel Failures & Spent Fuel.Certificate of Svc Encl)
  • ML20052A848  + (Discusses Alameda County Citizens Against Vallecitos Re Request for Revocation of License SNM-960.Request Should Be Denied)
  • ML20079C625  + (Discusses Alignment of Valves for Shutdown Cooling Entry at Plant)
  • ML20128J143  + (Discusses All Agreement State 960216 SP-96-022 Ltr Re Operating in Areas of Exclusive Federal Jurisdiction at Federal Facilities Without Having Either Filed for Reciprocity or Applied for Specific NRC License)
  • ML20072C848  + (Discusses All-Hazards Emergency Mgt Plan Re TMI Surrounding Region)
  • ML20204G695  + (Discusses Allegation 100 Re Solid Debris from Unqualified Paints Inside Containment.Ser,Concluding Operation W/Potential to Generate 3 Cubic Ft of Solid Debris, Acceptable.Salp Input Also Encl)
  • ML20206G835  + (Discusses Allegation 4-83-A-44 Re Hold Tag Log.Due to Lack of Specificity & Technical/Safety Significance of Failure to Remove Hold Tag,Allegation Not Pursued.Insp Action Taken. Addl Info Encl)
  • ML20136B964  + (Discusses Allegation 4-83-A-66 Re Morale Problem Caused by Reporting Employees Studying Manuals or Drawings as Idle Workers.Allegation Should Be Closed)
  • ML20206G880  + (Discusses Allegation 4-83-A-70.Regular Use of drug-sniffing Dog Onsite Found No Cocaine.Allegation Closed.W/O 831019 Telcon Record)
  • ML20140G599  + (Discusses Allegation 4-83-A-86)
  • IA-84-717, Discusses Allegation 4-83-A-86  + (Discusses Allegation 4-83-A-86)
  • ML20206G750  + (Discusses Allegation 4-84-A-114.Based on Encl Insp Rept 50-482/85-03,allegation Closed.W/O Encl)
  • ML20206H112  + (Discusses Allegation 4-85-A-013 Re Const Activities.No Response Received from Soliciting Cooperation. Allegation Closed)
  • ML20206H044  + (Discusses Allegation 4-85-A-077 Re 6 Rem Exposure to Worker from Pipe Leak Inside Containment Bldg on 850707.Insp Conducted on 850715-19 Concluded That Overexposure Did Not Occur)
  • ML20206G762  + (Discusses Allegation 4-85-A-077 Re Radiation Overexposure in Containment Bldg.Based on Encl Insp Rept 50-482/85-31, Allegations Found Unsubstantiated.Addl Info Encl.W/O Insp Rept)
  • ML20057B221  + (Discusses Allegation 4-91-A-0018 Re Employee Concerns at Plant)
  • ML20138L628  + (Discusses Allegation 9 Re Cylinder Testing Machine)
  • ML20237K740  + (Discusses Allegation 91 & Allegation on Use of A325 Bolts, Per Engineering Deficiencies Noted in Insp of Plant on 831130-1209.Related Info Encl)
  • ML20044C291  + (Discusses Allegation 91-A-0084 Re Seismicity of Diesel SW Gauges,Per Allegation Panel Discussion on 910508)
  • ML20199H359  + (Discusses Allegation AQ-55 of Alleger A-60 Re Interview on 841115)
  • ML20034F019  + (Discusses Allegation Case RII-92-A-0093 Brunswick Structural Issues)
  • ML20134H237  + (Discusses Allegation Followup on Advanced Medical Sys)
  • ML20134J155  + (Discusses Allegation Guidance Memo 96-02 Re Assuring Technical Adequacy of Basis for Closing Allegation)
  • ML20199G522  + (Discusses Allegation Guidance Memo 98-01 Informing Allegers & Licensees of Completion of Investigations by OI)
  • ML20237J953  + (Discusses Allegation I from Ofc of Inspector & Auditor Rept 86-10 Re Region IV Harassment & Intimidation of Inspectors to Downgrade or Delete Proposed Insp Findings.Allegation Unsubstantiated by Ofc of Inspector & Auditor)
  • ML20126D454  + (Discusses Allegation Involving Ebasco Svcs,Inc QA Review of Fischback & Moore Records for Seismic Support Installations. Falsified/Altered Documentation Cited.Portions Withheld (Ref FOIA Exemption 7))
  • ML20126D396  + (Discusses Allegation Involving Ebasco Svcs,Inc QA Program. Nonconformance Repts Not Written/Dispositioned Improperly. Problems W/Certification of Mercury Welders & NDE Personnel Cited.Portions Withheld (Ref FOIA Exemptions 6 & 7))
  • ML20129J075  + (Discusses Allegation Number RII-90-A-0124 Re Alleged Failure to Control & Report Discovery of Unsecured Safeguards Info for Plant,Unit 1 & 2)
  • ML20236F544  + (Discusses Allegation RI-84-A-0055 Re Inadequate Exam/Insp of Visible Crack Inside Recirculation Pump Suction Valve B. Based on Further Evaluation,Region I Concluded That No Crack,But Acceptable Surface Irregularity,Indicated)
  • ML20212M947  + (Discusses Allegation RI-84-A-0059 Re Alcohol & Drug Abuse Causing Shoddy Workmanship & Firing Alleger for Blowing Whistle. Licensee Substance Control Program Well Implemented & Numerous Levels of QC Ensure Safety)
  • ML20235F895  + (Discusses Allegation RI-85-A-0095 Re Instrumentation & Control Testing Concerns.Licensee Investigation Substantiated Some Allegations.Safeteam Review Resulted in New Corrective Actions)
  • ML19327A683  + (Discusses Allegation RI-86-A-0038 Re Employee Possible Involvement W/Controlled Substances.Util Requested to Investigate Matter & Inform NRC of Results)
  • ML20129J067  + (Discusses Allegation RII-90-A-024 Re Alleged Failure to Control & Report Discovery of Unsecured Safeguards Info for Plant,Units 1 & 2)
  • ML20044B997  + (Discusses Allegation RII-93-A-0032.Allegation Contains Privacy Info & Not Available in PDR)
  • ML20044B995  + (Discusses Allegation RII-93-A-0043.Allegation Contains Privacy Info & Not Available in PDR)
  • ML20246P614  + (Discusses Allegation RIII-89-A-0055 Re Activities at Plant & Requests Review & Disposition of Issue within 45 Days of Ltr Date.Encl Withheld (Ref 10CFR73.21))
  • ML20126H400  + (Discusses Allegation RIII-91-A-0022 Re Contaminated Landfill.Investigative Effort by Ofc of Investigations Unwarranted for Listed Reasons)
  • ML20210J960  + (Discusses Allegation RIII-94-A-0026 Re Possible Dumping of Radioactive Materials in Landfills)
  • ML20205P216  + (Discusses Allegation RIII-94-A-0118 Re Falsification of Firewatch Records)
  • ML20205P493  + (Discusses Allegation RIII-96-A-0090 Re Bar Code)
  • ML20207R346  + (Discusses Allegation RIV-86-A-06 Re Improper Use of E-Brite 26-1 Matl in Nuclear Facilities.Assignment of Engineer to Perform Peer Review of Actions to Address Alleger Concerns Requested)
  • ML20235F577  + (Discusses Allegation RIV-86-A-060 Re E-Brite 26-1 Metal. Evidence Proves That Matl Cannot Be Successfully Welded for Any Extended Lifetime Duration.Mfg Provided False Test Data to Obtain Code Approvals)
  • ML20057B459  + (Discusses Allegation RIV-92-A-0016 Re Operations at Plant)
  • IR 05000445/1992018  + (Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property)
  • ML20204D171  + (Discusses Allegation RV-84-A-087 Received in Late 1984. Alleged Drug Use by Plant Employees Substantiated. Allegation Re Falsification of Startup Test Packages Unsubstantiated)
  • ML20198A365  + (Discusses Allegation RV-85-021.Statement of Concern Re 850404 Telcon Concerning Possible Microbiologically Induced Corrosion at Unit 1 Encl.Response Requested If Statement Does Not Accurately Reflect Concerns)
  • IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr  + (Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr)