Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23234A085 + (8/23/2023 EI-NI Independence ACRS Presentation Slides (99902100))
- ML042380205 + (8/24/04, Callaway, Deferral of Review of License Amendment Request)
- ML052370051 + (8/24/05 SONGS, Unit 2 and 3, License Amendments 198/189, Revise TS 5.5.2.15, Containment Leakage Rate Testing Program,)
- ML12213A517 + (8/24/2012 Harris Meeting Announcement - Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference)
- ML052520314 + (8/25/05 E-Mail from M. Johnsen/Dairyland Transmittal of White Paper, La Crosse Boiling Water Reactor - Reactor Pressure Vessel Removal - NUREG 0612 Compliance)
- ML051540210 + (8/25/05, Dresden, Units 2 and 3, License Amendment, Modify the Isolation Condenser System Heat Removal Capability Surveillance Requirement (SR) by Adding a Note to the Technical Specification Section SR 3.5.3.4)
- ML052420520 + (8/25/05, Dresden, Units 2 and 3, Technical Specifications, Modify the Isolation Condenser System Heat Removal Capability Surveillance Requirement (SR) by Adding a Note to the Technical Specification Section SR 3.5.3.4)
- ML11238A158 + (8/25/11 - Summary of Telephone Conference Call Between NRC and Energy Northwest Concerning Drais Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application)
- ML16250A165 + (8/25/16 Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Amendment Request to Transition to Westinghouse Analyses Methodologies and Alternate Source Term at Wolf Creek Generating Station)
- ML112360179 + (8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides)
- ML052010488 + (8/26/04 Personal Communication from Y. Abernethy (CNS) to D. Orr (NMC) Regarding Bald Eagles on MNGP Site)
- ML13238A310 + (8/26/13 Acknowledgement Ltr to S. Lerner Re Generating Influence, Common Cause/New Yorks Comprehensive Study of Entergy Corporations Political Spending and Public Campaign to Secure New Operating Licenses for the Indian Point Nuclear Power)
- ML15244B377 + (8/26/2015, Meeting Handout Regarding TVA Dual Unit Fire Protection Report)
- ML15244B383 + (8/26/2015, Meeting Slide Regarding WBN Dual Unit Fire Protection Report Page Revision Review)
- ML15244B371 + (8/26/2015, Summary of Public Meeting Regarding Watts Bar Nuclear Plant Dual Unit Fire Protection Report Audit Closure)
- ML21218A156 + (8/26/21 Public Meeting Notice of Interpretation on Industrial Radiographic Operations at Temporary Radiography Jobsites and an Agreement State Compatibility Category)
- ML24212A098 + (8/26/24 Notice of Meeting with Holtec International for Pre-Application Meeting for the Model No. HI-STAR 80 Package (Agenda Enclosed))
- ML18178A579 + (8/27/18 - Letter to Petitioner Mr. P. Bryne, Petitioner (Results of PRM Sufficiency Review; P. Byrne, Petition for Rulemaking for Part 35, Medical Licensees Flexibility)
- ML13238A188 + (8/27/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC (Egc)Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations)
- ML20226A220 + (8/27/2020 Notice of Significant Public Meeting to Discuss NRCs End-of-Cycle Assessment of Fermi 2 Power Plant Performance for the 2019 Calendar Year)
- ML24193A146 + (8/28/24 Notice of Pre-Application Meeting with Global Nuclear Fuel Americas LLC, for the Model No. Npc Package)
- ML13246A123 + (8/29/13 Ltr to Mr. Denight Participation in Commission Meeting on Flooding and Other Extreme Weather Events)
- ML12227A349 + (8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1)
- ML12227A347 + (8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1)
- ML12243A376 + (8/29/2012 Summary of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1)
- ML18248A084 + (8/29/2018 K. Steves E-Mail Comments on Draft Kansas Impep Report)
- ML18248A091 + (8/29/2018 K. Steves Letter Comments on Draft Kansas Impep Report)
- ML18248A086 + (8/29/2018 K. Steves e-mail Comments on Draft Kansas Impep Report)
- ML11217A022 + (8/3-4/11, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA)
- ML18211A625 + (8/3/2018 Letter to J. Schuerman Louisiana Proposed Regulations to 2015-4 and 2015-5, and Revised Final Regulations to Rats Ids 2013-1 and 2015-2)
- ML12243A438 + (8/30/2012 Meeting - RR 48 UT Vs RT Discussion)
- ML12243A447 + (8/30/2012 Meeting - RR 48 UT in Lieu of RT for Nuclear Power Plant Applications)
- ML12243A435 + (8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography)
- ML12244A215 + (8/30/2012 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3)
- ML042570197 + (8/31/04 - 28 Pages Slides - Summary of Senior Management Meeting with BWROG)
- ML062430366 + (8/31/06 Braidwood - Mid-Cycle Performance Review and Inspection Plan)
- ML062430301 + (8/31/06 Byron Station - Mid-Cycle Performance Review and Inspection Plan)
- ML062430315 + (8/31/06 Clinton Power Station - Mid-Cycle Performance Review and Inspection Plan)
- ML062430358 + (8/31/06 DC Cook - Mid-Cycle Performance Review and Inspection Plan)
- ML062430333 + (8/31/06 Dresden - Mid-Cycle Performance Review and Inspection Plan)
- ML062430335 + (8/31/06 Duane Arnold Station-Mid-Cycle Performance Review and Inspection Plan)
- ML062430336 + (8/31/06 Fermi, Unit 2 - Mid-Cycle Performance Review and Inspection Plan)
- ML062430311 + (8/31/06 LaSalle Station- Mid-Cycle Performance Review and Inspection Plan)
- ML062430328 + (8/31/06 Monticello Station- Mid-Cycle Performance Review and Inspection Plan)
- ML062430564 + (8/31/06 Palisades - Mid-Cycle Performance Review and Inspection Plan)
- ML062430329 + (8/31/06 Perry Nuclear Power Plant, Unit 1 - Mid-Cycle Performance Review and Inspection Plan)
- ML062430338 + (8/31/06 Prairie Island Station-Mid-Cycle Performance Reveiw and Inspection Plan)
- ML062430596 + (8/31/06 Quad Cities - Mid-Cycle Performance Review and Inspection Plan)
- ML072430354 + (8/31/07 Braidwood - Mid-Cycle Performance Review and Inspection Plan)
- ML072430548 + (8/31/07 Byron - Mid-Cycle Performance Review and Inspection Plan for 09/01/2007 - 12/31/2008)
- ML072430547 + (8/31/07 Clinton - Mid-Cycle Performance Review and Inspection Plan for 09/01/2007 - 12/31/2008)