WBN Dual Unit Fire Protection Report Page Revision Review TVA-NRC Public Meeting - August 26, 2015
Introduction
- Fire Protection Recovery Project:
- Background and Context
- Analysis and Products
- As-Constructed Fire Protection Report - June 24, 2015
- Regulatory Engagement:
- Region II Triennial and Operational Readiness inspections ongoing
- Brief Structure:
- Overview of TVA-NRC audit discussions by category
Manual Actions
- Feasibility and Reliability (F & R)-
- Acceptance criteria relative to Actions Required and Important to Fire Safe Shutdown (FSSD)
- Related feasibility and reliability evaluations
- Environmental factors
- Managing Unit 1 OMAs-
- Evaluation of new U1 OMAs
Manual Actions
- Main Control Room Abandonment
- Action acceptance criteria for both Units
- Appendix R, III.L performance goal evaluation
- Cold Shutdown Repair Procedures
- Emergency lighting after 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> l 4 WBN Dual Unit Fire Protection Report TVANRCDiscussions:
Manual Actions l 5 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchangeintention AffectedPages OMArequiredvs.important FSSDF&R criteria ClarifiedFSSDF&Rcriteria for requiredandimportantFSSD OMAs PartV(full revision): 47 AFW flowOMAF&R evaluation Updatedwordingtoreflect calc updateandrequiredvs.
importantactionaspects PartVII:268 270 U2VCTroomactiontime Actionperformancetravel timecorrected PartV (full revision):4 Part VII:306 New andexistingU1 OMA evaluations Clarifiedcriteria and managementofnewU1OMAs PartV(full revision):2
Manual Actions, cont.
l 6 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchangeintention AffectedPages MCRabandonment action acceptancecriteria ClarifiedMCRabandonment actioncriteria PartV(full revision):6 Environmental factors ClarifiedF&Racceptance criteriawith environmental factordiscussion PartV(full revision):67 MCRabandonmentactions evaluations Providedupdatedengineering evaluationswithdefensein depthinmeetinggoals PartV(full revision):1116 Coldshutdownrepair documentation Providedadditionaldetail PartV(full revision):16 PartII:8
Manual Actions, cont.
l 7 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchangeintention AffectedPages Emergency lightingfor manualactionsafter8hours Clarifieduseofinstalledand portableemergency lights PartV(full revision): 18
Specific Technical Topics
- Safety Injection (SI)-
- Definition of spurious versus inadvertent
- Deviation Evaluations-
- Appendix R
- BTP 9.5-1, Appendix A
- Fire Detection Monitoring Panel upgrade-
- Modification chosen design code
- Conformance with appropriate industry standards and testing
- Fire Brigade member responsibilities-
- Other essential functions l 8 WBN Dual Unit Fire Protection Report TVANRCDiscussions:
Specific Technical Topics, cont.
- Reactor Building Equipment Hatch room-
- Surveillance frequency relaxation
- Applicability of alternate compensatory actions
- Mechanical Pipe Penetration Seals-
- F and T rating
- Steam Generator (SG) Power Operated Relief Valve (PORV) OMA-
- Allowed time revision
- F&R evaluation l 9 WBN Dual Unit Fire Protection Report TVANRCDiscussions:
Specific Technical Topics l 10 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchangeintention AffectedPages Definingspuriousvs.
inadvertentSI Providedclarification for termsusedinFPR PartIII:56 PartIV:2 Appendix Rdeviation justifications(combustible loading,equipmentlocation)
Clarified deviation justificationswithadditional detail PartVII:7,8 FireDetectionMonitoring Paneldesigncodeand standards U1: SubmittedLicenseCond.
U2:SubmittingLicenseCond.
UpdateNFPAcodealternative U1:LAR U2:Submittal PartX:53,55 OtherFireBrigade member responsibilities Also medicalresponders, fire brigadewillinitially stabilize injuredandthenfirefight PartII:25
Specific Technical Topics, cont.
l 11 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchange intention AffectedPages RB hatchroomsurveillance frequencyandcompactions Provided moredetailed justification PartII:100 PartVI:632,1301 PartVII:137138 Pipepenetrationseal FandT rating Providedmoredetailed technical basis PartII:4445 BTPDeviation for1.5hour dampersin3 hourfire barriers Deviationjustification documentedfollowing FPRengineering validation and CorrectiveAction Programevaluation Part I:11,19,20,22 Part VI:357358,935 937,968969,1135 Part VII:135,136 PartVIII: 23,62,67 PartX:5
Specific Technical Topics, cont.
l 12 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchangeintention AffectedPages SGPORVOMAcalculated allowedtimerevision; F&R evaluation Leverageincreased calc marginforOMAafter firefightingeffects;provide firefightingeffortsimpacts defenseindepthoptions PartVI:504,508, 515,519,526,530, 537,541,548,552, 683,684,690,691, 697,698,704,705, 711,712 PartVII:203207, 218222,230235, 241246,297298, 303304
FPR Consistency
- Intra-document consistency-
- Appendix R deviation component list shorter in evaluation
- Cold Shutdown Repairs-
- Required rooms table inconsistent with source section
- Consistency with calculation
- Actions common to all fires and function performed wording one revision behind
- Note table truncated
- Primary RCS depressurization strategy update l 13 WBN Dual Unit Fire Protection Report TVANRCDiscussions:
FPR Consistency l 14 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchangeintention AffectedPages Fourthcomponentmissing inAppendixRdeviation evaluation Consistentlylistfour components indeviation componentlistandevaluation PartVII: 26,52, 76 ColdShutdown repairs requiredroomsmissingin TableI1 Restoreconsistencywithin document PartI:Table I1, 625 Table61 revision consistency Tableupdated tocurrentFPR andcalc revision;consistency validated PartVI: Table6 1,13831386
Wording Clarifications
- Referencing prior or future NRC reviews in evaluations and justifications
- Preferred wording
- Unit applicability reference errors
- Clerical or redundant wording errors l 15 WBN Dual Unit Fire Protection Report TVANRCDiscussions:
Wording Clarifications l 16 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchangeintention AffectedPages Referencing priororfuture NRCreviews RemovedpriorNRCreview references PartI:4 PartII:4 PartVII: 133 Preferredormoreaccurate wording Updatedwordingwithno changeinintent PartII:96 Clericalorredundant,non substantiveeditorialserrors Corrected errorswithno changeinintent PartVII:6,112, 113 PartVII:9 PartIX:6,18
Wording Clarifications, cont.
l 17 WBN Dual Unit Fire Protection Report WBNDUFPRPageRevisions:
Discussion Item TVAchangeintention AffectedPages Unitapplicability,non substantiveeditorial referenceerrors Verifiedandcorrected unit applicabilityerrorswithno changeinintent PartVII: 128 PartVIII:60
Way Ahead
- Updated FPR Pages Submittal:
- Provides docketed submittal of viewed FPR change pages
- Submittal includes Unit 2 Fire Detection Monitoring Panel License Condition
- Anticipate submittal this week
- Regulatory Engagement:
- Anticipate Region II Triennial and Operational Readiness inspections into September
- Above supports ongoing Unit 2 Operating License technical and readiness review efforts l 18 WBN Dual Unit Fire Protection Report
WBN Dual Unit Fire Protection Report l 19 Header Use appropriate bullet lay-out Questions?