August 31, 2006 Mr. J. Conway Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MONTICELLO NUCLEAR GENERATING PLANT
Dear Mr. Conway:
On August 7, 2006, the NRC staff completed its performance review of the Monticello Nuclear Generating Plant for the first half of the calender year 2006 assessment cycle. Our technical staff reviewed the performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at the Monticello Nuclear Generating Plant was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. Significant inspections planned include a Problem Identification and Resolution Inspection (PI&R) in November 2006, and an Independent Spent Fuel Storage Installation (ISFSI) Preoperational Inspection in May 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
J. Conway In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Bruce Burgess, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22
Enclosure:
Monticello Inspection/Activity Plan cc w/encl:
M. Sellman, Chief Executive Officer and Chief Nuclear Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.
State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office Chairman, Wright County Board Mayor of Monticello Chairperson, Sherburne County Administrator, City of Monticello INPO
J. Conway In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Bruce Burgess, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22
Enclosure:
Monticello Inspection/Activity Plan cc w/encl:
M. Sellman, Chief Executive Officer and Chief Nuclear Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.
State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office Chairman, Wright County Board Mayor of Monticello Chairperson, Sherburne County Administrator, City of Monticello INPO DOCUMENT NAME:G:\\Branch TSS\\ALL MOC\\midcycle 2005 to 2006\\monticello\\Monticello 2006 MOC letter.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME SSheldon:sls BBurgess DATE 08/30/2006 08/30/2006 OFFICIAL RECORD COPY
J. Conway ADAMS Distribution:
HKN PST TEB RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Monticello DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Monticello Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:01:43 Report 22 1
BI
- RADIOLOGICAL ACCESS CONTROL AND ALARA Baseline Inspections 10/16/2006 10/20/2006 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/16/2006 10/20/2006 1
7112102 IP ALARA Planning and Controls 3
- PI&R BI-ENNIAL INSPECTION Baseline Inspections 11/13/2006 12/01/2006 1
71152B IP Identification and Resolution of Problems 1
BI
- TRANSPORTATION AND RADWASTE Baseline Inspections 12/11/2006 12/15/2006 1
7112202 IP Radioactive Material Processing and Transportation 3
FY 2007
- MONTICELLO INIT PREP 01/2007 Not Applicable 01/15/2007 01/19/2007 1
W90147 OL - INITIAL EXAM - MONTICELLO JAN/FEB 2007 2
MOD50.59
- MOD/50.59 INSPECTION Baseline Inspections 01/15/2007 02/02/2007 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/15/2007 02/02/2007 1
7111117B IP Permanent Plant Modifications 3
FY 2007
- MONTICELLO INIT EXAM 02/2007 Not Applicable 02/12/2007 02/23/2007 1
W90147 OL - INITIAL EXAM - MONTICELLO JAN/FEB 2007 1
- ALARA AND ACCESS CONTROL Baseline Inspections 03/05/2007 03/09/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1
7112102 IP ALARA Planning and Controls 1
- ISI BASELINE INSPECTION Baseline Inspections 03/19/2007 03/23/2007 1
7111108G IP Inservice Inspection Activities - BWR 1
7112203
- REMP AND RAM CONTROL Baseline Inspections 04/30/2007 05/04/2007 1
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 04/30/2007 05/04/2007 1
71151 IP Performance Indicator Verification 4
- ISFSI INSPECTION - PREOP Other Routine 05/01/2007 07/01/2007 1
60854 IP Preoperational Testing Of An ISFSI Other Routine 05/01/2007 07/01/2007 1
60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 1
MAINRULE
- MAINTENANCE EFFECTIVENESS INSPECTION Baseline Inspections 05/14/2007 05/18/2007 1
7111112B IP Maintenance Effectiveness 1
7112103
- RAD INSTRUMENTATION Baseline Inspections 07/09/2007 07/13/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
EP BI
- BASELINE EP EXERCISE INSP Baseline Inspections 10/01/2007 10/05/2007 1
7111401 IP Exercise Evaluation Baseline Inspections 10/01/2007 10/05/2007 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/01/2007 10/05/2007 1
71151-EP03 IP Alert & Notification System Baseline Inspections 10/01/2007 10/05/2007 1
71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Monticello Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:01:43 Report 22 1
HEATSINK
- HEAT SINK INSPECTION Baseline Inspections 09/10/2007 09/14/2007 1
7111107B IP Heat Sink Performance 1
7112101
- ALARA PLANNING AND ACCESS CONTROL Baseline Inspections 10/01/2007 10/05/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/01/2007 10/05/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 10/01/2007 10/05/2007 1
71151 IP Performance Indicator Verification 2
- LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 10/15/2007 10/19/2007 1
7111111B IP Licensed Operator Requalification Program 1
- ISI INSPECTION Baseline Inspections 03/08/2008 04/08/2008 1
7111108G IP Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.