IC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 Verify the IC System:
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- a.
Shellside water level > 6 feet; and
- b.
Shellside water temperature s 2100F.
SR 3.5.3.2 Verify each IC System manual, power 31 days operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.5.3.3 Verify the IC System actuates on an actual 24 months or simulated automatic initiation signal.
SR 3.5.3.4 NOTE--------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after adequate reactor power is achieved to perform the test.
Verify IC System heat removal capability to 60 months remove design heat load.
Dresden 2 and 3 3.5. 3-2 Amendment No. 215, 207