August 31, 2006 Mr. Gary Van Middlesworth Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DUANE ARNOLD ENERGY CENTER Dear Mr. Van Middlesworth On August 7, 2006, the NRC staff completed its performance review of the Duane Arnold Energy Center for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at the Duane Arnold Energy Center was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
In our mid-cycle assessment letter dated August 30, 2005, (ML052420426), we advised you of a substantive cross-cutting issue in the area of human performance, involving inadequate procedure use and adherence. In our end-of-cycle assessment letter dated March 2, 2006, (ML060610458) we advised you of the continuation of this substantive cross-cutting issue. The mid-cycle assessment of this substantive cross-cutting issue included a review of inspection results over the 12-month period of July 1, 2005 to June 30, 2006. During this period, we observed improvement in the effectiveness of corrective action. We noted that you no longer meet the criteria for number of human performance findings during the assessment period, and that only one finding was identified in the last half of the assessment period having a human performance aspect. Based on the trends and the ongoing corrective actions that you implemented during the assessment period, we conclude that this cross-cutting issue is closed.
We will continue to monitor your performance in this area during NRC baseline inspections.
G. Van Middlesworth The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. Significant inspections planned include a Triennial Fire Protection Inspection in September 2006, a Problem Identification and Resolution Inspection (PI&R) in April 2007, and a Component Design Basis Inspection in March 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Bruce Burgess, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49
Enclosure:
Duane Arnold Inspection/Activity Plan DISTRIBUTION:
See next page
G. Van Middlesworth The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. Significant inspections planned include a Triennial Fire Protection Inspection in September 2006, a Problem Identification and Resolution (PI&R)
Inspection in April 2007, and a Component Design Basis Inspection in March 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Bruce Burgess, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49
Enclosure:
Duane Arnold Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME:G:\\Branch TSS\\ALL MOC\\midcycle 2005 to 2006\\duane arnold\\Duane Arnold 2006 MOC Letter.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME SSheldon:sls BBurgess DATE 08/30/2006 08/30/2006 OFFICIAL RECORD COPY
G. Van Middlesworth cc w/encl:
J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chairman, Linn County Board of Supervisors D. McGhee, State Liaison Officer The Honorable Charles W. Larson, Jr.
Chairman, Benton County Supervisors Benton County Sheriff Coordinator, Benton County Emergency Services Mayor of Atkins Mayor of Shellsburg Mayor of Urbana Linn County Supervisors Linn County Sheriff Director, Linn County Emergency Management Agency Mayor of Robins Mayor of Alburnett Mayor of Cedar Rapids Mayor of Hiawatha Mayor of Marion City Manager of Marion Mayor of Center Point Mayor of Palo INPO
G. Van Middlesworth ADAMS Distribution:
TEB DWS RidsNrrDirsIpab JLC1 GEG KGO RML2 SRI Duane Arnold DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Duane Arnold Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 12:58:09 Report 22 4
FPI
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 09/11/2006 09/29/2006 1
7111105T IP Fire Protection [Triennial]
2 71111.11
- LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 09/11/2006 09/15/2006 1
7111111B IP Licensed Operator Requalification Program 1
71114
- BIENNIAL EP EXERCISE Baseline Inspections 10/16/2006 10/20/2006 1
7111401 IP Exercise Evaluation Baseline Inspections 10/16/2006 10/20/2006 1
71151 IP Performance Indicator Verification 1
BI
- ACCESS CONTROL AND PI VERIF Baseline Inspections 11/06/2006 11/17/2006 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/06/2006 11/17/2006 1
7112102 IP ALARA Planning and Controls Baseline Inspections 11/06/2006 11/17/2006 1
71151 IP Performance Indicator Verification 1
7112102
- ALARA (OUTAGE) AND ACCESS CONTROL Baseline Inspections 02/12/2007 02/16/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/12/2007 02/16/2007 1
7112102 IP ALARA Planning and Controls 1
- ISI BASELINE INSPECTION Baseline Inspections 02/12/2007 02/16/2007 1
7111111B IP Licensed Operator Requalification Program 3
- PI&R BIENNIAL Baseline Inspections 04/02/2007 04/20/2007 1
71152B IP Identification and Resolution of Problems 1
7112202
- RADWASTE & TRANSPORTATION Baseline Inspections 04/02/2007 04/06/2007 1
7112202 IP Radioactive Material Processing and Transportation 1
HEATSINK
- HEAT SINK INSPECTION Baseline Inspections 04/23/2007 04/27/2007 1
7111107B IP Heat Sink Performance 1
EP BI
- BASELINE EP INSPECTION Baseline Inspections 07/09/2007 07/13/2007 1
7111402 IP Alert and Notification System Testing Baseline Inspections 07/09/2007 07/13/2007 1
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/09/2007 07/13/2007 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/09/2007 07/13/2007 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 07/09/2007 07/13/2007 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 07/09/2007 07/13/2007 1
71151-EP03 IP Alert & Notification System 1
MAINRULE
- MAINTENANCE RULE INSPECTION Baseline Inspections 08/06/2007 08/10/2007 1
7111112B IP Maintenance Effectiveness 2
7112203
- REMP AND PI VERIFICATION Baseline Inspections 09/10/2007 09/14/2007 1
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 09/10/2007 09/14/2007 1
71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Duane Arnold Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 12:58:09 Report 22 1
- ISFSI INSPECTION Other Routine 10/01/2007 10/05/2007 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2
MOD5059
- MODIFICATIONS/50.59 INSPECTION Baseline Inspections 10/01/2007 10/19/2007 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 10/01/2007 10/19/2007 1
7111117B IP Permanent Plant Modifications 1
7112101
- ACCESS CONTROL, ALARA & PI VERIFICATION Baseline Inspections 10/29/2007 11/02/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/29/2007 11/02/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 10/29/2007 11/02/2007 1
71151 IP Performance Indicator Verification 3
FY 2008
- DUANE ARNOLD INIT PREP 11/2007 Not Applicable 11/26/2007 11/30/2007 1
W90144 OL - INITIAL EXAM - DUANE ARNOLD - NOV/DEC 2007 3
FY 2008
- DUANE ARNOLD INIT EXAM 12/2007 Not Applicable 12/10/2007 12/14/2007 1
W90144 OL - INITIAL EXAM - DUANE ARNOLD - NOV/DEC 2007 4
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 03/03/2008 04/04/2008 1
7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.