Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-87-290, Forwards Final Response to IE Bulletin 85-003 Per .Responses to Items a Through E Have Been Changed to Reflect Addition of & Uses of Movats,Inc Test Equipment + (11:20:30, 8 January 2025)
- ML17279A742 + (11:20:34, 8 January 2025)
- ML17279A740 + (11:20:35, 8 January 2025)
- ML17279A735 + (11:20:36, 8 January 2025)
- ML17279A734 + (11:20:38, 8 January 2025)
- ML17279A732 + (11:20:39, 8 January 2025)
- ML17279A730 + (11:20:39, 8 January 2025)
- GO2-87-282, Forwards Feedwater Nozzle Insp Rept for Refueling Outage RF87A,Spring 1987, Per NUREG-0619 Requirements + (11:20:40, 8 January 2025)
- IR 05000397/1987028 + (11:20:45, 8 January 2025)
- ML17279A724 + (11:20:46, 8 January 2025)
- ML17279A720 + (11:20:47, 8 January 2025)
- RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change + (11:20:48, 8 January 2025)
- ML17279A718 + (11:20:48, 8 January 2025)
- 05000397/LER-1987-030, :on 871106,upgraded Plant Tech Spec Fire Wall Not Constructed to Qualify as 3 H Fire Barrier & Wall Penetration Not Sealed.Cause Unknown.Engineering Evaluation of Wall & Penetration Will Be Conducted + (11:20:50, 8 January 2025)
- IR 05000397/1987029 + (11:20:51, 8 January 2025)
- ML17279A708 + (11:20:52, 8 January 2025)
- TAC:57728 + (11:20:53, 8 January 2025)
- ML17279A702 + (11:20:54, 8 January 2025)
- ML17279A700 + (11:20:55, 8 January 2025)
- TAC:57517 + (11:20:56, 8 January 2025)
- ML17279A696 + (11:20:57, 8 January 2025)
- TAC:57281 + (11:20:58, 8 January 2025)
- ML17279A694 + (11:20:58, 8 January 2025)
- ML17279A693 + (11:20:59, 8 January 2025)
- GO2-86-367, Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date + (11:21:00, 8 January 2025)
- ML17279A682 + (11:21:02, 8 January 2025)
- ML17279A681 + (11:21:03, 8 January 2025)
- ML17279A680 + (11:21:04, 8 January 2025)
- ML17279A679 + (11:21:05, 8 January 2025)
- ML17279A676 + (11:21:06, 8 January 2025)
- ML17279A675 + (11:21:08, 8 January 2025)
- ML17279A672 + (11:21:09, 8 January 2025)
- ML17279A666 + (11:21:10, 8 January 2025)
- ML17279A665 + (11:21:10, 8 January 2025)
- ML17279A660 + (11:21:11, 8 January 2025)
- ML17279A662 + (11:21:11, 8 January 2025)
- GO2-87-278, Application for Amend to License NPF-21,modifying Snubber Functional Testing Sampling Plans,Per Guidelines of Draft Ansi/Asme - OM-4 Document, Exam & Performance Testing of Nuclear Power Plant Dynamic Restraints. Fee Paid + (11:21:12, 8 January 2025)
- TAC:88808 + (11:21:12, 8 January 2025)
- GO2-86-370, Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept + (11:21:16, 8 January 2025)
- ML17279A648 + (11:21:44, 8 January 2025)
- TAC:62181 + (11:21:45, 8 January 2025)
- ML17279A645 + (11:21:46, 8 January 2025)
- GO2-86-076, Application for Amend to License NPF-21,modifying Tech Spec 3/4.3.8 to Revise Turbine Valve Test Interval from Weekly to Monthly.Fee Paid + (11:21:48, 8 January 2025)
- ML17279A641 + (11:22:39, 8 January 2025)
- GO2-87-275, Application for Amend to License NPF-21,changing Tech Spec Page 3/4 3-12 Correcting Inaccuracies/Inconsistencies in Items 1.d,1.c.3 & 1.e.Fee Paid + (11:22:41, 8 January 2025)
- GO2-87-273, Responds to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:On 870901,util Submitted Request for Amend to Tech Specs (Table 3.3.2-2) to Raise Main Steam Tunnel Temp Trip Setpoint to 164 F + (11:23:19, 8 January 2025)
- ML17279A625 + (11:23:50, 8 January 2025)
- ML17279A623 + (11:23:51, 8 January 2025)
- 05000397/LER-1987-025, :on 870808,ESF Isolations & Actuations Occurred.Caused by Spurious Trip of Breaker Due to Oxide Formation on Coil Plunger End of Undervoltage Relay Coil. Breakers Replaced + (11:24:01, 8 January 2025)
- ML17279A620 + (11:24:02, 8 January 2025)
- IR 05000397/1987020 + (11:24:07, 8 January 2025)