Letter Sequence Other |
|---|
|
|
MONTHYEARGO2-87-240, Application for Amend to License NPF-21,revising Tech Specs for Trip Setpoint for Item 1.d, Main Steam Line Tunnel Temp-High of Table 3.3.2-2,Isolation Actuation Instrumentation to Indicate Max Setpoint Value.Fee Paid1987-09-0101 September 1987 Application for Amend to License NPF-21,revising Tech Specs for Trip Setpoint for Item 1.d, Main Steam Line Tunnel Temp-High of Table 3.3.2-2,Isolation Actuation Instrumentation to Indicate Max Setpoint Value.Fee Paid Project stage: Request GO2-87-239, Requests Temporary Relief from Tech Spec Table 3.3.2-2,Item 1, Main Steam Line Tunnel Temp - High Re Increase in Trip Setpoint Value from 150 F to 156 F.Tech Spec Change to Address Inviolate Definition Concern Will Be Submitted1987-09-0101 September 1987 Requests Temporary Relief from Tech Spec Table 3.3.2-2,Item 1, Main Steam Line Tunnel Temp - High Re Increase in Trip Setpoint Value from 150 F to 156 F.Tech Spec Change to Address Inviolate Definition Concern Will Be Submitted Project stage: Other ML17279A5501987-09-0101 September 1987 Proposed Tech Specs,Reflecting Change of Trip Setpoint for Item 1.d, Main Steam Line Tunnel Temp-High of Table 3.3.2-2, Isolation Actuation Instrumentation Setpoints. to Indicate Max Trip Setpoint Value Project stage: Other ML17279A5461987-09-0202 September 1987 Concurs That Operation W/Setpoint at 156 F Provides Adequate Margin to Allowable Value of 170 F W/No Risk to Health & Safety of Public,Per 870901 Request for Temporary Relief from Trip Setpoint Limit for Main Steam Line Tunnel Temp Project stage: Approval ML17279A6141987-10-22022 October 1987 Notice of Violation from Insp on 870831-0930.Violation Noted:Main Steam Line Tunnel High Temp Setpoints Set Less Conservative than Allowed by Tech Specs & Keys to Locked High & hi-hi Radiation Areas Left Unattended Project stage: Other GO2-87-273, Responds to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:On 870901,util Submitted Request for Amend to Tech Specs (Table 3.3.2-2) to Raise Main Steam Tunnel Temp Trip Setpoint to 164 F1987-11-17017 November 1987 Responds to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:On 870901,util Submitted Request for Amend to Tech Specs (Table 3.3.2-2) to Raise Main Steam Tunnel Temp Trip Setpoint to 164 F Project stage: Request GO2-87-275, Application for Amend to License NPF-21,changing Tech Spec Page 3/4 3-12 Correcting Inaccuracies/Inconsistencies in Items 1.d,1.c.3 & 1.e.Fee Paid1987-11-19019 November 1987 Application for Amend to License NPF-21,changing Tech Spec Page 3/4 3-12 Correcting Inaccuracies/Inconsistencies in Items 1.d,1.c.3 & 1.e.Fee Paid Project stage: Request ML17279A6411987-11-19019 November 1987 Proposed Tech Spec Page 3/4 3-12,correcting Inaccuracies/ Inconsistencies in Items 1.d,1.c.3 & 1.e Project stage: Other ML17279A7201987-12-0404 December 1987 Safety Evaluation Supporting Amend 48 to License NPF-21 Project stage: Approval ML17279A7181987-12-0404 December 1987 Amend 48 to License NPF-21,revising Tech Spec Table 3.3.2.2, Changing Allowable Temp Range for Trip Setpoint for Trip Function 1.d,primary Containment Isolation & Main Steam Line Tunnel Temp Project stage: Other ML17279A7851988-01-20020 January 1988 Informs That During 880111 Meeting,State of Wa Energy Facility Site Evaluation Council Reviewed & Adopted Motions Indicating That Council Has No Comments Re Util 860321 & 870901 Requests to Amend License NPF-21 Project stage: Meeting ML17279A9611988-04-0505 April 1988 Notice of Consideration of Issuance of Amend to License NPF-21 & Proposed NSHC Determination & Opportunity for Hearing.Amend Changes Statement of Number of Channels Per Trip Sys for Main Steam Line Flow & Tunnel Temp Project stage: Other 1987-12-04
[Table View] |
Text
TRIP FUNCTION TABLE 3. 3. 2-1 ISOLATION ACTUATION INSTRUIIENTATIOH VALVE GROUPS tllNItlUH OPERATED BY OPERABLE CIIAHNELS SIGN11L Pal TG1P
~SYSTEII a)
APPLICABLE OPERATIONAL CONDITION ACTION g
$9
-; t h
'PT h
C:
C )
Iill 1.
PRI!IARY CONTAINtlENI ISOLATION a.
b.
c ~
e.
f.
g.
Reactor Vessel Mater Level 1)
Low, Level 3
2)
Low Low, Level 2
Orywell Pressure Itigh tlain Steam Line 1)
Radiation - Iligh 2)
Pressure Low 3)
Flow - Iligh tlain Steam Line Tunnel Temperature
- Itigt>
hlain Steam Line Tunnel 6 Temperature
- }ligh Condenser Vacuum - I.ow hlanual Initiation b.
C.
Reactor Building Vent Exhaust Plenum Radiation - kligh Orywell Pressure
- Iligh Reactor Vessel Mater Level Low Low, Level 2
tlanual Initiation gpp30009 87$ gj9 I
PDR P,DOCN 050 pDR P
2.
SECONDARY CONTAINHEHT ISOLATION 5(g) 1, 2, 4
2 2
1 2
5(b)(g) 2/group 1/group 1/group 3(b)(e) 3(b)(8) 3(b)(e) 3(b) 3(b) 2 1/group 1/group 4, 5(b)(g) 2 l(c)
Q$
yg; 2
gg9 2(c) 2 1,
Q 'Q)~ 2NSNaaa(d) ze Q,~
1 2
1, 2, 3
1, 2, 3
1, 2, 3
1,2,3 1
2 3
1 1, 2, 3
1, 2, 3
1,2,3 2A 3A',2,3 1, 2, 3
1 2
3 20 20 21 22 23 21 21 21 24
. 24 24 1, 2, 3, and "~
25 1, 2, 3
25 1, 2, 3, and ¹ 25 1, 2, 3
24 24 20
o d'
'I.
(
~ g
STATE OF WASHINGTON
)
)
COUNTY OF BENTON
)
Subject:
Admin. chan e to Table 3.3.2-1 I,
G.
C.
- SORENSEN, being dully
- sworn, subscribe to and say that I
am the
- Manager, Regulatory
- Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.
DATE l 0 A/of 1987 G.
C.
SO(
N, Manager Regulatory Programs On this day personally appeared before me G.
C.
SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this ~l9 d day of QI,1987.
Notary Public in and for the State of Washington Residing at
~I
-l