July 31, 1986 DISTRIRlITION:
0-3. 7 Local PDR/NRC PDR BWD-3 r/f EAdensam EHylton JRradfute
- Attorney, OELD JPartlow FJordan BGrimes ACRS {10)
Docket No. 50-397 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Suppl.y System P.O.
Box 968 3000 George Washington Way
- Richland, Washington 99352 B. Turovlin Wong D. Liberman I
@wN lQ aO
>O ON Vo OO
~ON gg+
Dear Mr. Sorensen:
Subject:
WNP-2 CPPR-93 Preservice Inspection Program Plan, Request for Relief
Reference:
Letter from Sorensen (SS) to Rutler (NRCl, same suhiect, dated May 17, 1985 Letter from Sorensen
{SS) to Schwencer (NRC), WNP-2 CPPR-93, Preservice Inspection Program Plan, Amendment No. 4, Summary Report Supplement No. 1, NIS-1 Code Data Report, dated February 28, 1985.
We note that vour original request for relief dated Februarv P8,
- 1985, was sub-mitted approximately three months after your commercial operation date.
We expected you to be in conformance with ASME Section XT requirements or have approved relief from these requirements prior to commercial operation.
The NRC staff's conclusions in granting relief would have been the same i< the Supply System had identified these issues prior to commercial operation.
- However, we expect that future licensing submittals and requests will be made in a more timely manner.
Sincerel.v, Your request for specific written relief from the requirements of Section XI of the ASME Code for the four Preservice Inspection items identified in your referenced letter has been reviewed and evaluated by the staff.
The staff finds that the requests for relief are acceptable for the reasons identified in the enclosed safety evaluation.
Accordingly, the relief is hereby granted.
The staff also concludes that granting relief where the Code requirements are impractical, is authorized by law and will not endanaer life or property, or the common defense and security and is otherwise in the public interest con-sidering the burden that could result upon WPPSS if the Code requirements were imposed upon WNP-2.
Enclosure:
As stated cc:
See next page
- NOTE:
Previously Concurred BWD-3:DBL LA:BWD-3:DRL
- JBradfute/hmc
- EHylton 4/21/86 4/21/86
/S/
Elinor G. Adensam, Director BWR Project Directorate No.
3
,</ ~
Division of RWR Licensing
~
SI. c gS
(~KG
<<(4D p ]ll p'tbV 0>> /,~2 I
OELD D:
0
-3'APH EA am 4/22/
7/~86 J
ad
/~ /AC
A l.
I I
t 4,
1'
Mr. G.
C. Sorensen, Manager Washington Public Power Supply Svstem WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Nicholas S. Reynolds, Esq.
Bishop, Liberman,
- Cook, Purcell 5 Reynolds 1200 Seventeenth
- Street, N.W.
Washington, D.C.
20036 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way
- Richland, Washinqton 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-1I Olympia, Washington 98504 P.
L. Powell, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, MD 956B Richland, Washington 99352 Mr. W.
G.
Conn Burns and Roe, Incorporated c/o Washington Public Power Supply System P. 0.
Box 968, MD 994E Richland, Washington 99352 R.
B. Glasscock, Director Licensino and Assurance Washington Public Power Supply System P; 0.
Box 968, MD 280 Richland, Washington 99352 Mr. C.
M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box MD 927M Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
'l C
k Il t
J r