Responds to & Advises Util That Rev 3 to Pump & Valve Inservice Insp Program Plan Has Not Yet Been Assigned to NRC Contractor for Technical Review.Util 860731 Requests for Relief Re Preservice Insp Program Plan Granted
ML17279A662
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/10/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
TAC-57728, NUDOCS 8712080166
Download: ML17279A662 (4)


Text

September 10, 1986 Docket No. 50-397 Mr. G.

C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.

Box 968 3000 George Washington Way Richland, Washington 99352

Dear Mr. Sorensen:

ACRS (10)

D IS BUTION:

c et o.

0-397

NRC PDR Local PDR BWD-3 r/f EAdensam EHylton JBradfute RBernero

Attorney, OGC EJordan JPartlow BGrimes

Subject:

Status of NRC Review of Pump and Valve Inservice Inspection Program Plan, Revision 3, and Preservice Inspection Program Relief Request

Reference:

1) Letter G02-86-679 from Sorensen (SS) to Adensam (NRC),

same

, subject, dated July 22, 1986

2) Letter from Adensam (NRC) to Sorensen (SS),

Subject:

WNP-2 CPPR-93 Preservice Inspection Program Plan, Request for Relief, dated July 31, 1986 Your letter, Reference l,,requests the status of our review of Revision 3 to your Pump and Valve Inservice Inspection Program Plan and your Preservice Inspection Program relief requests.

t The Pump and Valve Inservice Inspection Plan, Revision 3, is awaiting assignment to an NRC contractor for detailed technical review and the preparation of a Technical Evaluation Report (TER).

The TER will then be reviewed by the NRC staff which will prepare an appropriate Safety Evaluation.

If additional infor-mation's required by the contractor, we shall prepare a formal Request for Additional Information (RAI).

The complete review cycle will require approxi-mately thirty-five weeks from its onset which has not yet started.

The schedule to begin the review of your submittal and similar submittals of other utilities is in preparation; consequently the starting date for your review has not yet been determined.

We regret the delay.

Your Preservice Inspection relief requests have been granted (see Reference 2)..

Sincerely, gq fk cc:

See n t

/S/

Elinor G. Adensam, Director BWR Project Directorate No.

3 Division of BWR Licensing (0-:

B JBradfute/hmc 9/~ /86 (8:os'n 9/Q /86 D

-3:DBL EAdensam 9/~ Q'86 BD iaw p q',Isa

ltt lI P

I s ),'~'p,'$K~

, ~ I..

~" ~,Sl,,>>. ae

~, ~ a."r wa E<ea>>ha

.vk 4>>~h.>)i,A~X A4,>> Al 'i,>>, e>>,~>>l>>>>. ~ >>

~ I

~

>>>>- ~

i

". %at,

~

Mr. G.

C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Nicholas S. Reynolds, Esq.

Bishop, Liberman,

Cook, Purcell

& Reynolds 1200 Seventeenth

Street, N.W.

Washington, D.C-.

20036 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0. Box 968, MD 9568 Richland, Washington 99352 Mr. W. G.

Conn Burns and Roe, Incorporated c/o Washington Public Power Supply System P. 0.

Box 968, MD 994E Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 280 Richland, Washington 99352 Mr. C.

M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box MD 927M Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Reaulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 35