ML17279A623

From kanterella
Jump to navigation Jump to search
Forwards Rev 2A to WNP 1,2 10-Mile EPZ Evacuation Time Assessment Study
ML17279A623
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/23/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17279A624 List:
References
NUDOCS 8712020084
Download: ML17279A623 (9)


Text

REQUL*T INFORMATION DISTR IBUTIO YSTEM (BIDS) i ACCESSION NBR: 8712020084 DOC. DATE: 87/11/23 NOTARIZED:

NO DOCKET 0 FACIL: 50-39'7 WPPSS Nuclear Pro Jecti Unit 2>

Washington Public Poee 05000397 TRUTH. NAME AUTHOR AFFILIATION SQRENSENI Q. C.

Washington Public Power Supply System RECIP. NAME RECIPIENT AFFILIATION Document Control Branc~(Document. C'control Desk)

S~ ~r ~

SUBJECT:

Foriards Rev 2A to "WNP i'I 2 10-Mile EPZ uation Time Assessment Study. "

DISTRIBUTION CODE:

A045D COPIES RECEIVED:LTR t

ENC 'IIE; 5 4 1+0 TITLE:

OR Submittal:

Emergency Preparedness Plansi Implement'g Proceduresi C

NOTES:

REC IP IENT ID CODE/NAME PD5 PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME SAMWORTHe R COPIES LTTR ENCL 1

1 INTERNAL: AEOD/

Q FILE l

EXTERNAL:

LPDR.

NSIC 01 1

1 1

1 1

1 1

1 NRR/DREP/EPB NRC PDR 1

1 TOTAL NUMBER OF COPIES REQUIRED'TTR 8

ENCL 8

I

/

ii WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 8712020084 87k i23I !

DR ADOCN, 05000397 PDR November 23; 1987 U.S. Nuclear Regulatory Commission ATTN:

Document Control Room Washington, D. C.

20555 Gentlemen:

Subject:

'NP-1; 2 TEN MILE EPZ EVACUATION TIME ASSESSMENT STUDY Enclosed for your information and use is a revised (Rev.

2A) copy of the subject report.

This revision (2A) replaces Revision 2.

The earlier revision should be discarded.

Very truly yours; G.

C.

orensen; Manager Regulatory Programs cc:

RB Samworth/NRC w/o NRC Region V (2)

CM Bostad/Resident Inspector (1) 901A NS Reynolds/BCP8R w/o

I

DISTRIBUTION HNP-1, 2 Ten Nile EPZ Evacuation Time Assessment Study April 1987 Revision 2

No. of Co ies 1

1 1

1 1

1 1

1 1

1 1ll Internal CM Powers - Plant Manager Copy RL Corcoran - Control Room Copy KD Cowan - TSC Copy RA Chitwood Emerg.

Ping.

Copy RD Mogle - Author's Copy OE Larson - MUOAC Copy GC Sorensen - Licensing PL Powell - Licensing GD Bouchey - SSOC Copy Files 93.2.5 Files - PSF Records Room 1

1 2

2 2

2 1

15 9

35 External NRC Licensing 4 copies (via Sorensen) jo

.1 to Publi'c Ooc.

Roomi' 1 to Resident Inspector o

2 to NRC Region V

NRC Region V - G.

Good FEMA Region X - R. Donovan DOE-RL - J. Tokarz State DEM - H. Fowler OSHS - A. Nohseni County DEM - D. Somers Qestinghouse-RL - R. Heineman Extra TOTAL

J

)

W*5HI!e(

PL'BI IC POWER 4N SUPPL SYSTEM INTEROFFICE MEMORANDUM EP"RDM"87-009 DISTRIBUTION MAILDROP:

DATE:

October 21, 1987 TO:

FROM:

SUBJECT:

REFERENCE:

Distribution R. A. Chitwood, Mgr., Emerg. Ping.

8 Env. Programs MNP-1, 2 TEN MILE EPZ EVACUATION TIME ASSESSMENT WNP-I FILE WNP-2 FILE WNP-3 FILE WNPA FILE WNP.S FILE HGP FILE PKWD FILE LEGAL FILE ADMINFILE File

~IS. Z >

RDI</1 b RD Mogle The enclosed "NNP-1, 2 Ten Mile EFZ Evacuation Time Assessment Study",

Revision 2A, dated April 1987 replaces the Revision 2 version sent earlier,.

Errors detected in graphical illustrations in Figures 4 and S necessitated this replacement.

Please search out and destroy the earlier Revision 2

ccpy(s). as indicated or. the title page only.

RAC/RDM/vlc Enclosure WP.102 R4 (7 83)

'h 0

I, e

1

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 October 6, 1987 G02-87-257 Docket Ho. 50-397 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington; D.C.

20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST

References:

2) 3)

4)

WHP-2 Final Safety Analysis Report, Washington Public Power Supply System.

Primary Reactor Containment Leakage Testing for Water. Cooled Power Reactors, Code of Federal Regulations, Title 10, Part 50, Appendix J, January 1983 Leakage Rate Testing Containment Structures for Nuclear Reactors, American National Standards Institute, Inc., H.Y., NY; ANSI N45.4-1972

Letter, D.

M. Crutchfield (HRC) to G.

C. Sorensen (SS),

"Issuance oftExemption to a Provision of Appendix J and Amendment No.

41 to Facility Operating License Ho.

HPF-21 WPPSS~, Nuclear Project No.

2 (TAC No.

60740)",

dated April 29, 1987 In accordance with the reporting requirements stipulated in reference 2),

and in compliance with the testing commitments, regulations, and guidelines specified in references 1), 2), 3),

and 4), the Reactor Containment Building Integrated Lea!< Rate Test, September 1987 is submitted.

Yery truly ~ours.

G.

C. Sorensen, Manager Regulatory Programs DAI/PJI/bk Attachment cc:

JB Martin NRC RV NS Reynolds - BCPSR RB Samworth HRC DL Williams - BPA, "399 NRC Site Inspector - 901A