ML17279A742

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 860428-0502.Violation Noted:Util Did Not Adequately Document Qualification of Two Types of Rockbestos Cable
ML17279A742
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/16/1987
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML17279A741 List:
References
50-397-86-12, NUDOCS 8712290173
Download: ML17279A742 (2)


Text

DRAFT APPENDIX A NOTICE OF VIOLATION Washington Public Power Supply System P.

0.

Box 968 3000 George Washington Way Richland, Washington 99352 Docket No. 50-397 License No.

NPF-21 During an NRC inspection conducted on April 28 through May 2, 1986, violations of NRC requirements were'identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violations are listed below:

A.

Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and section 5.0 of NUREG 0588, Category II, the Supply System's files did not adequately document qualification of two types of Rockbestos cable because documentation of qualification of. type 780 polyethylene compound was not available.

This is a Severity Level IV violation (Supplement I).'.

Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and section 1.4 of NUREG 0588, Category II, the Su'pply System's files did not adequately establish qualification of Westinghouse low voltage containment penetrations because the plant total integrated radiation dose was not enveloped by referenced test conditions.

This is a Severity Level IV violation (Supplement I).

II C.

Contrary to Criterion V of Appendix B to 10 CFR 50, the Supply System did not adequately implement procedures and instructions for the qualification, documentation, or component installations of the following equipment:

1.

Victoreen high range radiation monitor, documentation 2.

Conax connectors for HRRM, documentation 3.

Barber Coleman motor, documentation 4.

Rosemount 1151 transmitter, installation and non-Eg-file documentation and instructions This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Washington Public Power Supply System is hereby required to submit a written statement or explanation to the U.

S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region V, and a copy to the NRC Resident Inspector, Mr.

C. J.

Bosted, within 30 days of the date of this Notice.

This reply should be clearly marked as a "Reply to a Notice of 8712~

QCK 05OOO397 0173 871216 PDR ADOC~

pDR 9

Violation" and should include for each violation:

(1) the reason for the violation if admitted, (2) the corrective steps 'that have been taken and the results

achieved, (3) the corrective steps that will be taken to avoid further.

violations, and (4) the date when full compliance will be achieved.

-If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other actions as may be proper should not be taken.

Consideration may be given to extending the response time for good cause shown.

FOR THE NUCLEAR REGULATORY COMMISSION Dated at Malnut Creek, California this /QK~day of:~~~+~ 1987 o ert J.

ate, Chief Reactor Safety Branch