Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211N755 + (02:34:36, 6 December 2024)
- ML20211N753 + (02:34:38, 6 December 2024)
- TXX-6139, Interim Deficiency Rept CP-86-78 Re Deviations in Structural Steel Bolting in Cable Spreading Room.Initially Reported on 861107.Pertinent Std Design Criteria Will Be Reviewed.Next Rept Will Be Submitted by 870311 + (02:34:39, 6 December 2024)
- ML20211N752 + (02:34:39, 6 December 2024)
- ML20211N750 + (02:34:40, 6 December 2024)
- ML20211N748 + (02:34:41, 6 December 2024)
- ML20211N749 + (02:34:41, 6 December 2024)
- ML20211N747 + (02:34:42, 6 December 2024)
- L-99-098, Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods + (02:34:46, 6 December 2024)
- ML20211N741 + (02:34:47, 6 December 2024)
- ML20211N740 + (02:34:47, 6 December 2024)
- ML20211N739 + (02:34:52, 6 December 2024)
- ML20211N737 + (02:34:53, 6 December 2024)
- PNO-I-87-013, on 870223,package Containing 2.3 Ci Mo-99 Received W/Surface Exposure Rate of 350 Milliroetgen/H on Package Bottom.Carrier Notified.Increased Exposure May Have Been Caused by Inadequate Shielding + (02:34:53, 6 December 2024)
- ML20211N732 + (02:34:56, 6 December 2024)
- 05000219/LER-1986-028, :on 861110,reactor lo-lo Water Level Initiation Signals Discovered Jumpered Out Since 861103 & Reactor Bldg Ventilation Not Secured.Caused by Personnel Error.Equipment Control Procedure Will Be Revised + (02:34:58, 6 December 2024)
- ML20211N727 + (02:34:59, 6 December 2024)
- ML20211N728 + (02:34:59, 6 December 2024)
- CY-97-110, Discusses Planned Movement of Fuel within Plants Spent Fuel Pool to Reduce Potential Impact of Beyond Design Basis Event Which Assumes Loss of Fuel Pool Coolant Inventory + (02:35:00, 6 December 2024)
- 05000410/LER-1987-008, :on 870127,violation of Limiting Condition for Operation Occurred During mark-up of Carbon Dioxide Fire Suppression Sys.Caused by Misinterpretation of Communication by Personnel.Signature for Actions Required + (02:35:05, 6 December 2024)
- ML20211N722 + (02:35:06, 6 December 2024)
- ML20211N721 + (02:35:07, 6 December 2024)
- ML20211N719 + (02:35:08, 6 December 2024)
- ML20211N716 + (02:35:09, 6 December 2024)
- ML20211N717 + (02:35:09, 6 December 2024)
- TXX-6138, Interim Deficiency Rept CP-85-31 Re Indeterminate Structural Integrity of Electrical Raceway Support Sys.Initially Reported on 850827.Addl Supports Added & Conduit Supports Modified.Next Rept Will Be Submitted by 870310 + (02:35:10, 6 December 2024)
- ML20211N713 + (02:35:11, 6 December 2024)
- ML20211N712 + (02:35:11, 6 December 2024)
- ML20211N709 + (02:35:12, 6 December 2024)
- ML20211N705 + (02:35:13, 6 December 2024)
- IR 05000461/1986028 + (02:36:16, 6 December 2024)
- ML20211N703 + (02:36:17, 6 December 2024)
- ML20211N702 + (02:36:18, 6 December 2024)
- ML20211N699 + (02:36:19, 6 December 2024)
- ML20211N701 + (02:36:19, 6 December 2024)
- ML20211N697 + (02:36:20, 6 December 2024)
- ML20211N698 + (02:36:20, 6 December 2024)
- ML20211N696 + (02:36:21, 6 December 2024)
- ML20211N695 + (02:36:22, 6 December 2024)
- ML20211N694 + (02:36:23, 6 December 2024)
- ML20211N690 + (02:36:24, 6 December 2024)
- ML20211N691 + (02:36:24, 6 December 2024)
- ML20211N687 + (02:36:25, 6 December 2024)
- ML20211N688 + (02:36:25, 6 December 2024)
- ML20211N685 + (02:36:26, 6 December 2024)
- BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station + (02:36:27, 6 December 2024)
- IR 05000338/1986008 + (02:36:27, 6 December 2024)
- ML20211N682 + (02:36:28, 6 December 2024)
- ML20211N678 + (02:36:29, 6 December 2024)
- ML20211N680 + (02:36:29, 6 December 2024)
- ML20211N675 + (02:36:35, 6 December 2024)
- BECO-LTR-97-101, Forwards Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program, Which Incorporates post-refueling Outage 11 Changes & Plant 10CFR50 App J,Option B License Amend + (02:36:36, 6 December 2024)