IR 05000338/1986008
| ML20211N684 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/01/1986 |
| From: | Gibson G, Mcguire D, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20211N681 | List: |
| References | |
| 50-338-86-08, 50-338-86-8, 50-339-86-08, 50-339-86-8, NUDOCS 8607030188 | |
| Download: ML20211N684 (1) | |
Text
l SAFEGUhRDS INFORMATION
.
'
.
,.*[4Ktc o
' UNITE 3 STATES
"
'o NUCLEAR REGULATORY COMMIS$10N -
'
,y REGION ll p
- 3 j.
101 MARIETTA STREET,N.W.
ATLANTA, GEORGI A 30323
'
\\....,/
JUN 271986
'
,
Report Nos. 50-338/86-08 and 50-339/86-08 Licensee: ~ Virginia Electric and Power Company P. O. Box 2666 Richmond, VA 23261 Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7
-
Facility Name: North Anna Units 1 and 2 Inspection Dates: March 25-28 and April 9,1986 Inspectors;dL J [ lidh 8 ~ /'b obin, Senior Securiity Inspector Date Signed ll.(
[ /- fil G. F.
ibsob Physical Security Inspector Date Si~gned h/'
Approved by:
_
s.
's D. R.'MdGuire, Chief, Physical Security Section Date Signed-Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety _and Safeguards SUPMARY
-
Scope:
This routine, unannounced inspection involved 48 inspector-hours onsite inspecting: _. Security Plan and Implementing Procedures; Records and Reports; Access Control-Personnel; Access Controls -Packages; Access Controis-Vehicles;. Personnel Training and Qualifications-General Requirements; Safeguards Contingency Plan Implementation Review; Protection of Safeguards li1 formation; and followup on previous enforcement matters.. Additionally, a licensee reported event was evaluated.
Results: Of the eight areas inspected, no violations or deviations were identified in seven areas; one violation was found in one area (Failure to control access to the protected area).
86-08-01 E;:CLc;W.C CWAN SpgcuARDS IWOWAT10N 8607030188 860627 UPON SEPARAT10 G IS PDR ADOCK 05000338 G
PDR PACgISDECONTROLLED.
SAFEGUARDS INFORMATl0N.
'
,
.