Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214E261 + (07:22:22, 4 December 2024)
- ML20214E260 + (07:22:23, 4 December 2024)
- ML20214E259 + (07:22:23, 4 December 2024)
- 05000414/LER-1987-016-01, :on 870413,facility Shutdown Due to Unidentified Reactor Coolant Leakage Greater than 1.0 Gallon Per Minute.Caused by Nozzle & Disc of Valve 2NM434 Badly Pitted.Valve Repaired + (07:22:27, 4 December 2024)
- IR 05000373/1986003 + (07:22:31, 4 December 2024)
- ML20214E251 + (07:22:32, 4 December 2024)
- ML20214E254 + (07:22:32, 4 December 2024)
- ML20214E246 + (07:22:33, 4 December 2024)
- ML20214E250 + (07:22:33, 4 December 2024)
- ML20214E245 + (07:22:34, 4 December 2024)
- ML20214E243 + (07:22:35, 4 December 2024)
- ML20214E242 + (07:22:36, 4 December 2024)
- ML20214E241 + (07:22:36, 4 December 2024)
- ML20214E238 + (07:22:37, 4 December 2024)
- ML20214E237 + (07:22:37, 4 December 2024)
- ML20214E236 + (07:22:38, 4 December 2024)
- ML20214E235 + (07:22:39, 4 December 2024)
- ML20214E230 + (07:22:40, 4 December 2024)
- ML20214E231 + (07:22:40, 4 December 2024)
- ML20214E228 + (07:22:41, 4 December 2024)
- PNO-III-86-017, on 860303,HPCI Sys Declared Inoperable When Water Backed Up Into HPCI Turbine.Caused by HPCI Gland Exhaust Condenser Tube Leak Coupled W/Failure of Sump Pump Motor.Repairs to Condenser Expected to Take 4 Days + (07:22:42, 4 December 2024)
- PNO-V-87-086, on 870510,reactor Shutdown Due to Inoperable Channel C 120-volt Ac Vital Inverter.Outage Tasks Will Include Surveillance Tests,Insp & Repair of Leaking Low Pressure Feedwater Heater & Equipment Problem Repairs + (07:22:42, 4 December 2024)
- ML20214E223 + (07:22:43, 4 December 2024)
- ML20214E216 + (07:22:44, 4 December 2024)
- ML20214E214 + (07:22:45, 4 December 2024)
- ML20214E213 + (07:22:46, 4 December 2024)
- 05000206/LER-1986-001-02, :on 860131,diesel Generator 2 Declared Inoperable Due to Delinquent Quarterly Inservice Testing Valve Surveillance.Caused by Personnel Error.Surveillance Performed.Generator Operable + (07:22:49, 4 December 2024)
- ML20214E205 + (07:22:50, 4 December 2024)
- NRC-87-0034, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-341/85-11.Corrective Actions:Std Design Methodology Developed to Document Expansion Anchor Design Criteria for Plant Wide Use + (07:22:50, 4 December 2024)
- ML20214E204 + (07:22:51, 4 December 2024)
- ML20214E203 + (07:22:51, 4 December 2024)
- ML20214E202 + (07:22:52, 4 December 2024)
- IR 05000456/1986008 + (07:22:53, 4 December 2024)
- ML20214E199 + (07:22:54, 4 December 2024)
- ML20214E197 + (07:22:54, 4 December 2024)
- ML20214E195 + (07:22:55, 4 December 2024)
- ML20214E196 + (07:22:55, 4 December 2024)
- PY-CEI-NRR-0648, Forwards Rept of Changes to Initial Test Program,Per License Condition 2.C(4) & 10CFR50.59(b).Rept Includes All Changes Made from 870328-0428 + (07:22:56, 4 December 2024)
- ML20214E193 + (07:22:56, 4 December 2024)
- B11984, Proposed Tech Spec 4.6.E.5,clarifying Functional Testing Requirements for Safety/Relief Valve Position Indication Sys + (07:22:57, 4 December 2024)
- ML20214E187 + (07:22:58, 4 December 2024)
- ML20214E188 + (07:22:58, 4 December 2024)
- ML20214E184 + (07:22:59, 4 December 2024)
- ML20214E182 + (07:23:00, 4 December 2024)
- ML20214E183 + (07:23:00, 4 December 2024)
- ML20214E179 + (07:23:01, 4 December 2024)
- ML20214E174 + (07:23:02, 4 December 2024)
- ML20214E176 + (07:23:02, 4 December 2024)
- ML20214E172 + (07:23:03, 4 December 2024)
- ML20214E169 + (07:23:04, 4 December 2024)
- ML20214E171 + (07:23:04, 4 December 2024)