Monthly Operating Rept for Apr 1987
ML20214E223
Person / Time
Site: Salem 
Issue date: 04/30/1987
From: Miller L, White P, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8705220010
Download: ML20214E223 (8)


Text

... -.

AVERAGE DAILY UNIT POWER LEVEL-i.

Dodket No.

50-311 Unit Name' Salem # 2 Date

-May 10,1987 Completed.;by.

Pell White Telephone-609-935-6000 Extension 4451 Month ~

' April 1987 1

Day Average. Daily, Power' Level Day Average Daily Power Level' (MWe-NET)'

(MWe-NET)

~1 948 17' 129 2'

965 18 591 3

950 19 895 i

4-939-20 957 5

903 21.

952-4 6

959

.22 946 7

829 23 948 f

8 0

24 953 1

9 0

25 955 I

i l

10 0

26 944 11 0

27 954 i

i 12 0

28' 943 j

13.

0 29 955 14 0

30 950

.15 0

31 i

1 j.

16

.0-I Pg. 8.1-7 R1 0705220010 870430 ~

EI PDR ADOCK 05000311

(

R PDR 4

c

/

),

OPERATING DATA REPORT..

~

50-311 DocketLNo.

Date May 10,1987

' Telephone-935-6000 Completed by Pell White Extension 4451 Operating Status

~1

' Unit Name-Salem No. 2 Notes 2.

Reporting Period (MWt) 3411

-April 1987' 3.

. Licensed Thermal Power 4.

Nameplate Rating (Gross' MWe)

T1W

.5.

DesignLElectrical Rating (Net MWe) l))3I 6.

Maximum Dependable. Capacity (Gross MWe)TITF 7.

Maximum Dependable Capacity (Net MWe) 1133 8.

If. Changes Occur'in Capacity Ratings ~(items 3 through 7) since Last Report, Give. Reason N/A i

9.

Power Level to. Which Restricted,. if any ;(Net MWe)

-NA

~

10. Reasons for. Restrictions, if any

-N/A This Month Year to Date Cumulative I

11. Hours in~ Reporting Period 719

.2879 48624

12. No. of Hrs. Reactor was Critical 508.16 2609.5 28549.4 l
13. Reactor Reserve Shutdown Hrs.

0 0

-0

14. Hours Generator On-Line 488.4 2581.8-27520.2
15. Unit Reserve Shutdown. Hours 0

0 0

16. Gross Thermal Energy Generated 3

(MWH) 1431199 7925117 33933589 l

17. Gross Elec. Energy Generated (MWH) 467020-2602220 27779360' t
18. Net Elec. Energy Generated (MWH) 440739-2488150-26335555 1
19. Unit Service Factor 67.9 89.7-56.6 i
20. Unit. Availability Factor 67.9 89.7-56.6 i
21. Unit Capacity Factor (using MDC Net) 55.4-78.1 49.0
22. Unit Capacity Factor

{

(using DER Net) 55' 77.5 48.6.

23. Unit Forced Outage Rate (type, date and duration of each) 32 10.3-
24. Shutdowns scheduled over next 6 months 33.3 N/A
25. If shutdown at end of Report Period, Estimated Date of Startup:

[

N/A

26. Units in Test Status (Prior to' Commercial, Operation):

Forecast-Achieved.

Initial' Criticality 6/30/80 8/2/80 Initial Electricity..

9/1/80

.6/3/81=

Commercial Operation

'9/24/80 10/13/81 8-1-7.R2

,.. _ ~ _. _.. _

UNIT SHUTDOWN AND POWER REDUCTIONS-Docket No. 50-311 -

REPORT MONTH APRIL 1987 Unit Name 'suicm No.Z Date May:10,1987 Completed by Pell White Telephone 609-935-6000 Extension 4451 Method of Duration Shutting License Cause and Corrective No.

Date Type Hours Reason Down Event System' Component Action to 1

2 Reactor Report Code 4 Code 5 Prevent Recurrence Turbine Governing 0107 04-07-87 F

31.00 A

5 HA TURBIN System' Controls Other. Hydraulic System Problems 0108 04-07-87 F

7.37 A

3

^

HA MOTORX Turbine-Other Chemical Volume l

0109 04-08-87 F

22.33 A

4 PC DEMINX Control System' Reactor l

Nuclear Reactor 0110 04-09-87 F

200.88 A

4 CI PIPEXX Coolant System Piping-Nuclear Other Steam 0111 04-18-87 F

8.50 A

5 HI GENERA Generator-Problems Nuclear Other Steam HI-GENERA Generator Problems 0112 04-13-87 F

1.75-A 5

t i

l' 2 Reason.

3 Method

.4 Exhibit GD 5; Exhibit 1.

F Forced A-Equipment Failure-explain 1-Manual-In structions '- Salem as-

.S Scheduled B-Maintenance or Test 2-Manual Scram.~

for Prepara-Source' C-Refueling 3-Automatic Scram.-tion of:Datal D-Regulatory Restriction

'4-Continuation of: Entry Sheets E-Operator Training &. Licensing Exam Previous Outage. for Licensee F-Administrative'

~

5-Load Reduction'

' Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161).

i _,

MAJOR PLANT MODIFICATIONS DOCKET NO.:

50-311 REPORT MONTH- - APRIL-1987-UNIT NAME:

- Salem 2 DATE:'

May 13, 1987 COMPLETED BY:

L. Miller TELEPHONE: - 609/339-4497

  • DCR NO.

PRINCIPAL SYSTEM SUBJECT

,' high 2SC-0766 Main Turbine. Lube-

. Install a.sidestream-

~ Oil-volume,; closed: loop' filtration system lon the~ Main Turbine

-lube oil reservoir.- - System is-to consist of internal / external reservoir piping, and a-pump, pump motor, strainer,1 filter towers mounted on a self-contained-skid.

- 2EC-1476 Crane & Hoist /

'This DCR provides for the Overhead Handling implementation of a' color Systems

-coding and capacity marking on all the cranes, hooks, slings, monorails, overhead hoists, mobile ~and hydraulic cranes and special lifting devices for Unit #2.

4 i

Design Change Request 4

y

.w=

,e

- i 4

~

a-y

' i

\\

3

- MAJOR' PLANT. MODIFICATIONS

' DOCKET: NO: : 50-311

' REPORT ~ MONTH --APRIL 1986 LUNIT;NAME:1 Salem-2 D'

~ ATE::

May 13,1987 D

. s_

>t.

COMPLETED'BY:

L. Miller

'\\

J' LTELEPHONE:

(609)339-4497 7

l L

  • DCR "F

' SAFETY EVALUATION.10 CFR 50 59 -

I

'2SC-0766 T is: DCR provides Unit #2 with ajsidestream, z highi

$~

~

~

'. volume, _ closed ~1oop filtration l system: on c the Main Turbine Lube Oil Reservoir.5 (MTLOR).. Theinew-system will' consist of~ internal;and externali

~

' piping,.and a pump,ipumpLmotor; strainer, filter P.

-towers mounted on'a self-contained: skid.'.LThe 1

purpose fo'rthe Lchange ?was. to provide. clean:

lubr16ation oil to.-the(MTLOR,!previously' lube; oil

-stored inithe~MTLOR:was not;being_ filtered at a properfrateito prevent-dirtland oil-impurities

.from1settlingsin;thenreservoir.

If notLproperly; filtered, these impurities 'could" easily -be fed-n n

L

-into MainiTurbine1 bearing lubrication.linest F

leading to subsequent bearing damageyand'possible

~

~

p' complete bearing-failurei :Thisidesign_-change-doesLnotfaffect'any.fsafety?related. system 1or:

component. - No Lunreviewed safety: question /is

. involved and;theEsafe. shutdown"of the' plant isL not jeopardized..

2EC-1476 This DCR provides forsthefimplementation:ofia color coding:and. cap'acity marking on^allLthe:

cranes,1 hooks,? slings, monorails,ioverhead:

. hoists,-mobilejandl hydraulic. cranes'and special

~ lifting devicesifor. Unit.#2. :Thi's painting (job:

will not,createLa new' safety:hazardstoLthe plant,

-l neither will:it affect-thelsafefshutdown'of the reactor.-iThe-implementationiof'thisEcapacity'-

'markingJis'done;to1 comply;with the" commitment-made.to L the - NRC and' also.with section 15.5.5 (4) L of-

-NUREG-0612 There are.nofunreviewed: safety 7

questions;nor! changes ~to:the Technical.

Specifications for'FSAR.,

L DCR - Design Change' Request f

l 4

p I

-\\-

g

e

~-SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NO. 2 APRIL 1987 The unit began;the period at approximately 89% power,-1,000 megawatts (MW) gross and continued atuthat level until Tuesday, April 7.

A problem developed while trouble shooting the: Electro-Hydraulic Control (EHC) system, the loss of DC control power to the EHC. circuitry closed all. turbine stop'and control valves.

This' sequence of. events resulted infa turbine-reactor trip.. The cooldown of the unit to Mode'S was initiated Wednesday night-because'of a valve bonnet leak'which could not be isolated for repairs.

The: repairs to the leaking valve were completed on Monday, April 13..

A generator stator. water leak was discovered on Wednesday and repairs initiated, while heat'up to normal operating-temperature and pressure'was completed on Thursday, April 16.

The generator'was synchronized on Friday, April 17 and the. unit increased to 89% power, 1,000 MW gross by Saturday, April 18.

The unit continued to operate.at that level for the remainder of the month except for a brief reduction requested by the Load Dispatcher on Tuesday, April 24 for line stability.

J

^

4 oc s

s i '

e

-REFUELING:.INFORMATION

DOCKET NO'~: j50-311-COMPLETED BY:

'L.K.

Miller

' UNIT NAME:-

Salem 2 DATE:, May~13, 1987 TELEPHONE: -EU3/935-6000 EXTENSION: -4497 Month' April 1987~

1.

- Refueling-information~has changed from last month:-

YES NO-X-

2.

Scheduled date for next refueling:-

April 9, 1988 J3.

- Scheduled date.for restart following refueling:;

June-8, 1988-4.

A)

Will. Technical Specification ch'anges or other license-amendments be required?

YES NO-X --

B)

Has.the reload fuel design been reviewed.by the StationL Operating Review Committee?-

YES NO X

If no, when is it scheduled?

February, 1988 5.

Scheduled date (s) for submitting proposed licensing action:.

February 1988 if required 6.

Important licensing considerations associated with refueling:

NONE 7.

Number of Fuel Assemblies:

A)

Incore 193 B)

In Spent Fuel Storage 224 8.

Present licensed spent fuel storage capacity:

1170-Future spent fuel storage capacity:

1170 9.

Date of last refueling that can be discharged to spent fuel' pool assuming the present' licensed capacity:

March 2003 8-1-7.R4 y

-s O PSEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station May 13, 1987

. Director, Office of Management U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specification, the original copy of the monthly operating reports for the month of April 1987 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Operating Summary Refueling Information Sincerely yours, Y

J. M.

Zupko, Jr.