ML20214E214

From kanterella
Jump to navigation Jump to search
Approves Plans Attached to 851106 Response to Section Iv.C of NRC 841213 Order Modifying License.Meeting in Berlin,Ct Will Be Scheduled in Late Mar to Discuss Details of Plans
ML20214E214
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/27/1986
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
References
EA-84-115, NUDOCS 8603070200
Download: ML20214E214 (2)


Text

>

O FEB 2 71986 Docket No. 50-213 EA84-115 Connecticut Yankee Atomic Power Company ATTN:

Mr. J. F. Opeka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

We have reviewed your November 6, 1985 and January 31, 1986 responses to Section IV.C of the NRC Order Modifying License issued on December 13, 1984.

We approve the plans attached to your November 6, 1985 submittal. However, we would like to meet with you to discuss some of the details of these plans such as root causes, conclusions, and schedules.

To do so, we will separately schedule a meeting at your offices in Berlin, Connecticut fo.= late March.

Further details will be documented in our letter confirming that meeting.

Sincerely, Origlim1 cinued by homas Ee Marley Thomas E. Murley Regional Administrator cc:

R. Graves, Plant Superintendent D. O. Nordquist, Manager of Quality Assurance R. T. Laudenat, Manager, Generation Facilities Licensing E. J. Mroczka, Vice President, Nuclear Operations Gerald Garfield, Esquire Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut G603070200 060227 PDR ADOCK 05000213 p

PDR 1 o 901

l.

s,,

Connecticut Yankee Atomic Power Company 2 FEB 2 71986 bec:

Region I Docket Room (with cor.currences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP M. McBride, RI, Pilgrim J. Shediosky, SRI, Millstone 1&2 T. Rebelowski, SRI, Millstone 3 J. Akstulewicz, LPM, NRR i

t l

l l

I i

ORS RI7P RI:0RP R

AR f

RS RP s

M,cCabeBettenhausen'<

inger r

S Lar s cki u20 e umu p

an i

RI:pC RN 7'/

)@

RI:ES Holody x

grez d >> uge 8 if 11 q+r i

0FFICIAL RECORD COPY i

l

- -