Docket No. 50-289
GPU Nuclear. Corporation
ATTN: Mr. H. D. Hukill
Vice President and Director of TMI-1
P. O. Box 480
Middletown, Pennsylvania 17057
Gentlemen:
I
Subject: 50-289/87-01
,
Enclosed is the report of the NRC team inspection conducted by Mr. R. J.
l
Paolino on January 12-21, 1987 at the General Public Utilities Nuclear
corporate office in Parsippany, New Jersey and the Three Mile Island, Unit 1
facility in Middletown, Pennsylvania, of activities authorized by NRC Operating
License No. DPR-50. The team's findings were discussed with you and members
of your staff at the conclusion of the inspection. The inspection reviewed
your implementation of a program for establishing and maintaining the quali-
fication of electric equipment within the scope of 10 CFR 50.49. Within these
areas, the inspection consisted of selected EQ files, procedures and records,
interviews with personnel and observations by the inspectors. The inspection
determined that you have implemented a program to meet the requirements of 10 CFR 50.49 except for certain deficiencies identified in the enclosed inspection
report.
As a result of this inspection, it appears that certain of your activities
have been identified that were not conducted in full compliance with NRC
requirements as set forth in the Notice of violation, enclosed herewith as
Appendix A.
This violation has been categorized by severity level in
accordance with the " General Statement of Policy and Procedure for NRC
Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy 1986).
Eight other apparent violations have been identified in your 10 CFR 50.49
program implementation, enclosed herewith as Appendix B, are classified as
Potential Enforcement Items. With regard to these items we are considering
appropriate enforcement action and will inform you of our decision in the
future. The eight Potential Enforcement items include 1) failure to maintain
the EQ files in an auditable form to permit verification of adequacy and
acceptability of qualification documents used in qualifying each item of
electrical equipment, 2) failure to demonstrate that the black Durez
(phenolic) Limitorque limit switch cam shaft was qualified for use in
!
containnent prior to this inspection, 3) failure to demonstrate that cable
insulation resistance for Rockbestos Cable had been considered with respect to
l
instrument accuracy requirements, 4) failure to demonstrate qualification of
installed Static-0-Ring Pressure Switch versus test specimen, 5) failure to
demonstrate qualification of Kerite Splice and dispositioning of Test
-
Anomalies, 6) Inadequate and missing performance data necessary in evaluating
!
0FFICIAL RECORD COPY
IR TMll 87-01 - 0001.0.0
k
04/29/87
i
8705220017 870511
!
DR
ADucK 0000
9
(
L
d
GPU Nuclear Corporation
2
Steam and Radiation Test results and temperature effects on instrument accur-
acy, 7) no traceability or comparison analysis to demonstrate qualification of
Weed RTD's, 8) failure to demonstrate that cable insulation resistance for
Brand-Rex cable had been considered with respect to instrument accuracy
requirements. Your corrective actions regarding the Potential Enforcement
Items should not be delayed pending future NRC inspection or further action by
the NRC regional office.
You are required to respond to this letter.
In preparing your response, you
should follow the instructions in the Notice of Violation, Appendix A.
The response directed by this letter and the accompanying Notice are not
~
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL-96-511.
-Your cooperation with us in this matter is appreciated.
Sincerely,
ogginal signed BYt
William V. Johnston, Acting Director
Division of Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
Potential Enforcement Items, Appendix B
3.
NRC Region I Inspection Report 50-289/87-01
cc w/encls:
R. J. Toole, Operations and Maintenance Director, TMI-1
C. W. Smyth, Manager, TMI-1 Licensing
R. J. McGoey, Manager, PWR Licensing
E. L. Blake, Jr. , Esquire
TMI-1 Hearing Service List
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
l
I
l
\\
OFFICIAL RECORD COPY
IR THIl 87-01 - 0001.1.0
.
04/29/87
l
-
-
-
- -
-
-
-
-
. -
-
-
-
T.
9
'
'*
_GPU Nuclear Corporation
3
'
bec w/encis:
Region I Docket Room (with concurrences)
_
.
.
W. D. Travers, Director, TMI-2 Cleanup Project Directorate
J._Goldberg, OELD: HQ
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
K. Abraham, PA0
Robert J. Bores, DRSS
64
RI DRS
R DRS
X&MRI.
Paolino/geb
Anderson F A Johnston
4/ 0/87
4/ 2W87
$ [/ W87
0FFICIAL RECORD COPY
IR TMil 87-01 - 0002.0.0