ML20214E184
| ML20214E184 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/04/1986 |
| From: | Dewald I COMSTOCK ENGINEERING, INC. |
| To: | COMSTOCK ENGINEERING, INC. |
| References | |
| 84-06-09-05, 84-6-9-5, OL-I-ROREM-267, NUDOCS 8705210694 | |
| Download: ML20214E184 (2) | |
Text
>\\,,
h /Sorun - 1Sl l g g]
@lM 1M
~
Comstock Engineering, Inc..a m 13 Aa:47 Memorandum tFr GO'-
To:
All Leads office: Braidwood-From:
I. F. Dew.ald
Subject:
Daily Inspection Assignments Date:
6-9-84 Control No: 84-06-09-05 Assignment of inspections shall be accomplished a day ahead. These assignments will be given to K. Worthington that day for tracking purposes.
At the end of the day a copy of the completed inspection assignments will be given to K. Worthington for review.
Assignment of inspector work will be accosplished as follows:
1.
Print No, item to be inspected (CC1, CC2, CC3)
I 2.
A total of 15 inspections will be provided to the inspector.
(This will assure the continuous
'O flow of work.)
b 3.
Print No,'s will be supplied to the vault by 8 a.m.
y g
g s 4 the previous day so that they may be put together g
d q
the day prior to issue by inspector name.
'g e f, ::'(
l L
\\
o E
2SS a,g 4.
The work assignments will be checked on a daily l
SQ3 g
basis to establish a status of completion.
54s9
""1
\\
$NQ T
5.
Leads shall also perform inspections and have assign-yd ment sheets covering their work.
0 5
\\
y N
6.
Sasple assignment sheet attached.
I D
7.
If the inspector has not completed all of the inspec-(3 b
tions, the incompleted inspections will be forwarded s
gy,k g
i A
to the next days assignment.
{ li I sillig {
Ie
.x sa a
e h32 $ Psh*oo h MA ^
A p
p I. F. DeWald G
QC Manager IFD/ jab EP.CGCC73 Attachment cc K. Worthington R. Saklak QC Mgr. file
- i n *-
(
s i
i e
i
- ~ ~ ~ ~ ~ '
,,g,
~
3 DATE:
SCHEDULE FOR FOLLOWING DAY NAME:
PRINTS NEEDED:-
NUMBER ITEMS ASSIGNED:
AREA (5):
/
/ COMPLETED t
(
(
~%
.. - -... -.