Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076H339 + (07:36:49, 15 December 2024)
- ML20076H343 + (07:36:49, 15 December 2024)
- 0CAN038301, Responds to 821025 IE Insp Repts 50-313/82-14 & 50-368/82-11,Item 8 Re Control Room Dose Calculations.Item Re NUREG-0737,Item II.B.2, Plant Shielding, Closed + (07:36:50, 15 December 2024)
- RC-94-0270, Forwards Response to Questions on EQ for SG Replacement,Per 931029 Submittal of Majority of Safety Analysis Results & Associated TS Changes for SG Replacement + (07:36:50, 15 December 2024)
- ML20076H328 + (07:36:51, 15 December 2024)
- ML20076H320 + (07:36:52, 15 December 2024)
- RBG-15-238, Interim Deficiency Rept DR-116 Re larger-than-specified Gaps in Joints Connecting RHR HX Supports to Embedment Plates. Initially Reported on 830511.Next Rept to Be Provided by 830715 + (07:36:52, 15 December 2024)
- ML20076H314 + (07:36:53, 15 December 2024)
- ML20076H307 + (07:36:57, 15 December 2024)
- RBG-15-237, Interim Deficiency Rept DR-72 Re Improper Installation, Testing & Insp of Concrete drilled-in-expansion-type Anchors.Initially Reported on 830425.Addl Ae Info Awaited. Next Rept Due by 830831 + (07:37:00, 15 December 2024)
- RBG-15-216, Interim Deficiency Rept DR-111 Re Dimensional Discrepancy on Two Small Bore Pipe Support Design Drawings.Initially Reported on 830412.Evaluation Continuing.Next Rept Will Be Submitted by 830714 + (07:37:01, 15 December 2024)
- ML20076H291 + (07:37:02, 15 December 2024)
- ML20076H285 + (07:37:03, 15 December 2024)
- TXX-3686, Forwards Westinghouse Procedure ISI-154, Preservice & Inservice Insp of Reactor Vessels & plant-specific Reactor Vessel Insp Program + (07:37:04, 15 December 2024)
- ML20076H283 + (07:37:04, 15 December 2024)
- 05000368/LER-1983-022-03, /03L-0:on 830514,core Protection Calculator Channels Placed in Ceac 1 Inop or Ceac 2 Inop for Spurious Alarm Troubleshooting.Spurious Alarms Caused by Faulty Cards on Annunciator 2K-05 (D-4) & ZK-05 (F-4) + (07:37:06, 15 December 2024)
- LIC-94-0195, Monthly Operating Rept for Sept 1994 for Fort Calhoun Station + (07:37:07, 15 December 2024)
- ML20076H272 + (07:37:08, 15 December 2024)
- 05000298/LER-1983-006-03, /03L-0:on 830509,during Performance of Surveillance Procedure 6.3.10.9.1,four RHR Mechanical Snubbers Frozen.Caused by RHR Shutdown Cooling Creating Water Hammer & Overloading snubbers.w/830608 Ltr + (07:37:10, 15 December 2024)
- 1CAN068301, Forwards Bounding Analytical Assessment of NUREG-0630 Models on LOCA Kw/Ft Limits, Reflecting Use of Flecset Heat Transfer Correlation as Compensating Model to Reduce Impact of NUREG-0630 Models + (07:37:11, 15 December 2024)
- ML20076H246 + (07:37:11, 15 December 2024)
- ML20076H244 + (07:37:12, 15 December 2024)
- U-602348, Special Rept:On 940906,CPS Declared Loose Parts Monitoring Sys Out of Svc.Caused by False Alarms.Util Will Recalibrate Channel Six + (07:37:12, 15 December 2024)
- ML20076H231 + (07:37:13, 15 December 2024)
- ML20076H233 + (07:37:13, 15 December 2024)
- ML20076H225 + (07:37:14, 15 December 2024)
- ML20076H222 + (07:37:15, 15 December 2024)
- 05000368/LER-1983-020-01, /01T-0:on 830519,discovered Fire Watch Improperly Posted.Caused by Ineffective Communication Among Plant Personnel.Guidance Being Written for Personnel Re Fire Watch Responsibilities + (07:37:16, 15 December 2024)
- ML20076H217 + (07:37:17, 15 December 2024)
- 2CAN058303, Monthly Operating Rept for Apr 1983 + (07:37:18, 15 December 2024)
- ML20076H215 + (07:37:18, 15 December 2024)
- PLA-1655, Monthly Operating Rept for Apr 1983 + (07:37:19, 15 December 2024)
- 05000313/LER-1983-012-03, /03L-0:on 830519,w/plant Heatup/Startup in Progress,Auxiliary Feedwater Pump P-75 Outboard Mechanical Seal Failed.Cause Unknown.Seal Rebuilt & Reinstalled + (07:37:24, 15 December 2024)
- A830009, Forwards Revised P&Ids.Updated Index Encl.W/O P&Ids + (07:37:25, 15 December 2024)
- ML20076H180 + (07:37:27, 15 December 2024)
- ML20076H160 + (07:37:27, 15 December 2024)
- ML20076H152 + (07:37:28, 15 December 2024)
- ML20076H153 + (07:37:28, 15 December 2024)
- RBG-15-223, Interim Deficiency Rept DR-115 Re Tackwelding of Heavy Hex Nuts.Initially Reported on 830510.Current Station Design Specifies Use of Locknuts W/Heavy Hex Nuts in Lieu of Tackwelding.Interim or Final Status Rept Expected by 830718 + (07:37:29, 15 December 2024)
- ML20076H130 + (07:37:30, 15 December 2024)
- ML20076H128 + (07:37:30, 15 December 2024)
- ML20076H115 + (07:37:31, 15 December 2024)
- ML20076H105 + (07:37:32, 15 December 2024)
- ML20076H099 + (07:37:33, 15 December 2024)
- ML20076H100 + (07:37:33, 15 December 2024)
- ML20076H085 + (07:37:34, 15 December 2024)
- ML20076H095 + (07:37:34, 15 December 2024)
- ML20076H081 + (07:37:35, 15 December 2024)
- ML20076H080 + (07:37:36, 15 December 2024)
- ML20076H077 + (07:37:36, 15 December 2024)
- ML20076H076 + (07:37:37, 15 December 2024)