i OPERATING DATA REPORT DOCKET NO. 050-298 DATE 5-10-83 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Notes
- 1. Unit Name:
C oper Nuclear Station
- 2. Reporting Period:
April 1983
- 3. Licensed Thermal Power (MWt):
2381 836
- 4. Nameplate Rating (Gross MWe):
778
- 5. Design Electrical Rating (Net MWe):
707
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Date Cumulative 719.0 2.879.0 77.424.0
- 11. Hours in Reporting Period 703.6 2,850.1 64,221.0
- 12. Number Of Hours Reactor Was Critical O.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator On.Line 701.8 2,840.4 63,212.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.430.184.0 6,227,904.0 126.289.206.0
(
- 17. Gross Electrical Energy Generated (MWH) 477.972.0,_,
2.083.668.0 40.015.896.0 l
- 18. Net Electrical Energy Generated (MWH) 459,157.0 2.011.673.0 38.585,133.0
- 19. Unit Service Factor 97.6 98.7 81.6 97.6 98.7 81.6 l
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 83.6 91.5 65.2
- 22. Unit Capacity Factor (Using DER Net) 82.1 89.8 64.1
- 23. Unit Forced Outage Rate 0.0 0.7 3.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
Refueling, April 30, 1983, 4 weeks l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
May 28, 1983
- 26. Units in Test Status t Prior to Commercial Operation):
Forecast Achie$ed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
)#h l
8306160488 830510 PDR ADOCK 05000298
("/7 7 )
R PDR
-. -. ~
>, - /(
.o COOPER NUCLEAR STATION Nebraska Public Power District
"'A"e",*o"J'tM;"2L^$*^
CNSS830330 May 10, 1983 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Monthly Operating Status Report for April 1983 Gentlemen:
Enclosed for your information and use is a corrected copy of Cooper Nucletr Station Monthly Operating Status Report for April 1983. A correction to the Net Electrical Energy Generated (MWH) was made.
Should you have any comments or require additional information regarding this corrected report, please contact me.
Sincerely, f
wimY P. V. Thomason Acting Station Superintendent Cooper Nuclear Station