ML20076H244

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1983
ML20076H244
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/10/1983
From: Ballinger P, Thomason P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
References
CNSS830330, NUDOCS 8306160488
Download: ML20076H244 (2)


Text

-

1

\\

q i

i OPERATING DATA REPORT DOCKET NO. 050-298 DATE 5-10-83 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Notes

1. Unit Name:

C oper Nuclear Station

2. Reporting Period:

April 1983

3. Licensed Thermal Power (MWt):

2381 836

4. Nameplate Rating (Gross MWe):

778

5. Design Electrical Rating (Net MWe):

707

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to.Date Cumulative 719.0 2.879.0 77.424.0

11. Hours in Reporting Period 703.6 2,850.1 64,221.0
12. Number Of Hours Reactor Was Critical O.0
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator On.Line 701.8 2,840.4 63,212.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.430.184.0 6,227,904.0 126.289.206.0

(

17. Gross Electrical Energy Generated (MWH) 477.972.0,_,

2.083.668.0 40.015.896.0 l

18. Net Electrical Energy Generated (MWH) 459,157.0 2.011.673.0 38.585,133.0
19. Unit Service Factor 97.6 98.7 81.6 97.6 98.7 81.6 l
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 83.6 91.5 65.2
22. Unit Capacity Factor (Using DER Net) 82.1 89.8 64.1
23. Unit Forced Outage Rate 0.0 0.7 3.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

Refueling, April 30, 1983, 4 weeks l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

May 28, 1983

26. Units in Test Status t Prior to Commercial Operation):

Forecast Achie$ed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

)#h l

8306160488 830510 PDR ADOCK 05000298

("/7 7 )

R PDR

-. -. ~

>, - /(

.o COOPER NUCLEAR STATION Nebraska Public Power District

"'A"e",*o"J'tM;"2L^$*^

CNSS830330 May 10, 1983 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operating Status Report for April 1983 Gentlemen:

Enclosed for your information and use is a corrected copy of Cooper Nucletr Station Monthly Operating Status Report for April 1983. A correction to the Net Electrical Energy Generated (MWH) was made.

Should you have any comments or require additional information regarding this corrected report, please contact me.

Sincerely, f

wimY P. V. Thomason Acting Station Superintendent Cooper Nuclear Station

/cg

Enc, cc:

G. D. Waston w/ enc.

A. C. Gehr w/ enc.

J. T. Collins w/ enc.

'/