2CAN058303, Monthly Operating Rept for Apr 1983
| ML20076H212 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/15/1983 |
| From: | Bramlett L, John Marshall ARKANSAS POWER & LIGHT CO. |
| To: | Bassett H NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| 2CAN058303, 2CAN58303, NUDOCS 8306160474 | |
| Download: ML20076H212 (7) | |
Text
-
OPERATING DATA REPORT DOCKET NO.
50-368 DATE R /15/R3 COMPLETED BY L.5.Bramlett TELEPHONE 501-964-3145 OPERATING STATUS Arkansas Nuclear One - Unit 2 Notes
- 1. Unit Name:
- 2. Reporting Period:
Apri1 1-30, 1983
- 3. Licensed Thermal Power (MWt).
28_15 942.57
- 4. Nameplate Rating (Gross MWe):
912
- 5. Design Electrical Rating (Net MWe):
097
- 6. Maximum Dependable Capacity (Gross MWe):
RRA
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:
None
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr to-Date Cumulatise 719.0 2879.0 27143.0 i1. Hours in Reporting Period 719.0 2136.3 18292.5
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Resene Shutdown llours 0.0 91.6 1430.1 719.0 2105.6 17674.3
- 14. Hours Generator On-Line 0.0 0.0 75.0
- 15. Unit Rewne Shutdown Hours
- 16. Gross Thermal Energy Generated IMWH) 2018736.0 5714353.0 43965414.0 660261.0 1873807.0 14249111.0
~17. Gross Electrical Energy Generated iMWH) 631292.0 1790734.0 13508478.0
- 18. Net Electrical Energy Generated (MWHI
- 19. Unit Senice Factor 100.0 73.1 65.1 100 0 73.1 65.4
- 20. Unit Availability Factor 102.3 72.5 58.0
- 21. Unit Capacity Factor (Using MDC Net) 96.3 68.2 54.6
- 22. Unit Capacity Factor (Using DER Net) 0.0 26.9 21.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months IType. Date.and Duration of Eacht:
NONE N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status IPrior io Commercial Operation):
Forecast Achiesed INITI A L CRITICA LITY INIIIA L ELECT RICI TY COMMERCIAL OPER ATION 8306160474 830515 PDR ADOCK 05000368 to/77 i R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-368 2
UNIT DATE 5/15/83 L.S.8ramlett COMPLETED BY TELEPHONE 501-964-3145 April, 1983 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net)
I 880 17 8R0 881 2
18 881 881 3
RA1 l9 881 4
881 20 881 880 5
21 883 6
22 879 880 7
23 8
880 880 24 856 9
25 880 876 878 10 26 877 875 11 27 874 871 I
12 23 877 871 13 39
~
881 870 14 3o 881 ls 3i 16 880 l
l I
INSTRUCTIONS On this format, list the average daily unit power lesel in MWe Nei for each day in the reporting month. Compute io the nearest whole megawatt.
l I
(4/776 l
l-i l
L.
')
4 DOCKET NO. 50-3 6 8 ANO-Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME DATE May 4.1983 COMPLETED BY T-9-
Bramlett REPORT MONTil APRTT.
TELEPHONE 501-.964-3145
~.
E
=.5 U '"S##
5"o
$t Cause & Corrective
=
,i 1
5f 3
h5d f
E Action to h*C"'
3,?
gU Present Recurrence g
g33 e g-S2 0
53%
Report a mu g
3 Di l C ':
6 NONE I
4 3
I 2
Exhibit G Instructions Method:
1-Manual for Preparation of Data F: Foiced Reason:
S: Scheduled A-Equipment Failure (Explain) 2-Manual Scram.
Entry Sheets for Licensee B Maintquance of Test 3 Automatic Scram.
Event Report (LER) File (NUREG-C-Refueling 4-Continuation 0161)
D-Regulatory Restriction E-Operator Training & License Examination 5-Load Reduction 5
F Administrative 9-Other Exhibit !- Same Source G-Operational Estor (Explain)
(9/77) 11 Other (Explain)
I
WP83454 NRC MONTHLY OPERATING REPORT OPERATING SUmfARY - APRIL, 1983 UNIT 2
\\
The unit operated throughout the month at 100% full power.
J
.~
REFUELING INFORMATION 1.
Name of facility.
Arkansas Nuclear One - Unit 2 2.
Scheduled date for next refueling shutdown.
Jan. 6, 1984 3.
Scheduled date for restart following refueling.
April 1, 1984 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
To be determined 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
December 1. 1983 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
To be determined I
t l
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
a) 177 b) 112 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
485 503 present increase size by 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
[
DATE:
1991
~~
l l
l 1
ARKANSAS POWER & LIGHT COMPANY l
POST OFFICE BOX 551 LITTLE ROCK, ARKANSAS 72203 [501) 371-4000 May 16, 1983 j
i 2CAN058303 Mr. Harold S. Bassett, Director Division of Data Automation and Management Information Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
SUBJECT:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report (File:
2-0520.1)
Gentlemen:
Attached is the NRC Monthly Operating Report for April 1983 for Arkansas Nuclear One - Unit 2.
Very truly yours, Bd John R. Marshall Manager, Licensing JRM:SAB:sc Attachment cc:
Mr. John T. Collins l
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 g
Mr. Richard C. DeYoung
/
Office of Inspection and Enforcement j
U. S. Nuclear Regulatory Commission Washington, DC 20555 MEMBEA MOOLE SOUTH UTIUTIES SYSTEM l*