-I-OPERATING DATA REPORT DOCKET NO.

50-244 DATE May 6, 1983 COMPLETED BY Mdd8 Mhw

' Andrew E. McNam3ra 1 (315) 524-4446 TELEPHONE OPERATING STATUS Ext. 301, at Ginna

1. Unit Name:

GINNA STATION. UNIT #1 Notes April, 1983 The Annual Refueling and

2. Reporting Period:

1520 Maintenance Shutdown

3. Licensed Thermal Power (MWr):

490 continued.

4. Nameplate Rating (Gross MWe):

470

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, if Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Da te Cumulative 719 **

2,879.00 117,695.00

11. Ilours In Reporting Period 0

2,001.08 88,887.23

12. Number of flours Reactor Was Critical 0

0 1,631.32 *

13. Reactor Reserve Shutdown F.2urs 0

1,998.0 86,978.13

14. Ilours Generator On Line 0

0 8.5 *

15. Unit Reserve Shutdown llours 0

2,921,472 119,504,026

16. Gross Thermal Energy Generated (MWil) 0 955,257 38,922,054
17. Gross Electrical Energy Generated (MWil) 0 907,546 36,893,608
18. Net Electrical Energy Generated (MWil) 0 69.39 73.90
19. Unit Service Factor U

69.39 73.91

20. Unit Availability Factor 0

67.05 69.57

21. Unit Capacity Factor (Using MDC Net) 0 67.05 68.57
22. Unit Capacity Factor (Using DER Net) 0 0.98 8.38
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAYIb ~

~

Cummulative Total commencing January 1, 1975 y

    • Eastern Standard Time to Eastern Daylight Savings Time f'306160485 830506 y

)

\\

PDR ADOCK 05000244 I

R PDR

m

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT

  1. 1, Ginna Station DATE May 6, 1983 COMPLETED BY 65: ? ef. )ppc,1w Andrew E. McNahara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH April, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

17.

2.

18.

3.

19.

4.

20.

5.

21.

6.

22.

7.

23.

8.

24.

9.

25.

10.

26.

11.

27.

12.

28.

13.

29.

14.

30.

15.

31.

XXXXXXXX 16.

INSTRUCTIONS i

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

}

D(X'KET NO.

50-244 UNITNAME.51tGitna Station May 6' 198*#

UNIT SHUTDOWN AND POWER REDUCTIONS DATE COMPLETED llY 3- [^ "IM*- _ - r _.

Andrew E. McNamar h-REPORT MONTil April, 1983 TliLEPilONE 1 (315) 524-4446 Ext. 301, at Ginna m

o N

w m

c o et Licensee e,

gm Cause & Corrective Eq e

No.

Date

{

jg

} g,{ j Event

  • g Q

Action to Report #

  1. j

!u Prevent Recurrence r

gz g

e 2

g U

o The Annual Refueling and Maintenance Overhaul continued.

I l

.i 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions

'l S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Dat.

Il-Maintenance or Test 2-Manual Scram.

Eritry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 E

4....

m ev. in o ll-Other (Explain)

Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE May,6, 1983 COMPLETED BY /9h Jn e b.M f -

. Andrew E. McNahara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH April, 1993 The Annual Refueling and Maintenance Shutdown continued.

I

-l

Page 5 GINNA STATION

!!aintenance Report Summry April, 1933 During the month of April, routine _ maintenance an:1 inspections were performed, along with maintenance scheduled as part of the Refueling Outage.

Safety-related maintenance included:

1.

"A" Reactor Coolant.Ptimp Seal Inspection and ?!ctor Inspection.

2.

!!inor inspection.of the "B"

Reactor Coolant Pump and Motor.

3.

Cleaning of the thin Feedwater Flow Venturin.

4.

Inspection and Maintenance of Motor Control Centers 10 and 1D.

5.-

Reactor Protection Channel Calibrations.

6.

Inspection and thintenance of "B"

Containment Recire. Fan and flotor.

7.

Inspection and 11a i n tenance of the 1B Containment Spray Pump.

G.

Discharge "'est and charge of the Station Batteries.

. 9.

la Charging Pump Varidrive an1 Motor Overhaul.

10.

Plinor Inspection and flaintenance of the 1A Containment Spray Pumo, the A and B Auxiliary Feedwater Pumps, CV Recirc.

Fans,.9afety Injection Pumps.

11.

Inspection, !!a in tena nce and Test of Breakers on Buses 14 and 16.

12.

Steam Generator Eddy Current Inspection,-and repair (this will be described in the monthly summary following completion o f the work).

13.

Maintenance support for the Refueling activities to include fuel haniling system inspection and maintenance, and maintenance on incore instritmentation.

f 1

1

er j

Q,l,U tW:??'S R{:/7#E;g

' * * * ~ * * *

{N f

. v o.,

.4

. Sta n.

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649 T E L E s'H O N E

"""c x

2.. 546 2700 GINNA STATION May 6, 1983 Director, Office of Management Information and Program Analysis U.S.

NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for April, 1983 Operating Status Information R.

E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244

Dear Sir:

Pursuant to our-Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1983 Very truly yours, A

B uce A.

Snow Plant Superintendent BAS /kdg Attachments cc:

Mr. James M. Allan NRC (1)

/