OPERATING DATA REPORT DOCKET NO.

50-261 DATE 830502 COMPLETED llY

11. Ray Norris TELEPHONE (803) 383-4524 OPERATING STATUS H. B. Robinson Unit No. 2 Notes
1. Unit Name:
2. Reporting Period: 830401. 0000 / 830430, 2400 There are' presently 157 spent
3. Licensed Thermal Power (MWt):

2300 fuel assemblics in the spent 739 fuel pool.

4. Nameplate Rating (Gross MWe):

700

5. Design Electrical Rating (Net MWe):

700

6. Maximum Dependable Capacity (Gross MWe):

665

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Througir 7) Since Last Report, Give Reasons:

No Change.

1955 MWt reactor power.

9. Power Level To Which Restricted,If Any (Net MWe):

Although the unit is not restricted by any outside

10. Reasons For Restrictions,1f Any:

agency,1the power level is presently reduced due to steam generator considerations.

v This Month Yr.-to-Date Cumu!ative 719.00 2879.00 106565.00

11. Hours In Reporting Period 627.94 2738.90 79578.67
12. Number Of Hours Reactor Was Critical 50.01 85.44 1393.21
13. Reactor Reserve Shutdown Hours 550.26 2643.52 77479.56
14. Hours Generator On-Line

.00

.00 23.20

15. Unit Reserve Shutdown Hours 943323.84 4622083.68 155386675.20 l
16. Gross Thermal Energy Generated (MWH) 303127.00 1487771.00 29996534.00
17. Gross Electrical Energy Generated (MWH) 281048.00 1'195647.00 47267749.00
18. Net Electrical Energy Generated (MWH)

~

76.53 91.82 72.71

19. Unit Service Factor

[

76.53 91.82 72.73

20. Unit Availability Factor
21. ' Unit Capacity Factor (Using MDC' Net) -

58.78 72.90 66.70 55.84 69.25 63.37

22. Unit Capacity Factor (Using DER Net) 18.13 6.66 13.98
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

None May 20. 1983

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY '

3 l

INITI A L ELECTRICITY COMMERCIAL OPERATION 7,d' 8306160420 830502 I,

PDR ADOCK 05000261 WIll)

R PDR g

I

9 o

n AVERAGE DA!LY UNIT POWER LEVEL DOCKET NO. 50-261 UNIT II. B. Robinson Unit 2 DATE 830502 COMPLETED BY 11. Ray Norris TELEPHONE (803) 383-4524 MONTI{

April 1983

?

DAY AVERAGE DAILY POWER LEVEL

. DAY AVERACE DAILY POWER LEVEL -

(MWe-Net)

(MWe-Net) 558 1

26 37,

2 42 Ig 558

'3

-24 19 514

-25 4

33.

20

.5 510 21 124 6

559 22 539 558 562 23 7

8 561 24 370 9

562 25 319 556 560 26 10 11 560 27 557 12 559 28 392 13 561 29

-23

-20 559 30 14 15 560 31 559 16 INSTRUCTIONS On this format, list the average dail) unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77 )

UNIT SilVTI) OWNS D D l'0WER ltEDilC110NS DOCKlirNO[ 50-261II..X'50

' UNtr NAst1 DATI: 83Q502__. _.._.

COMP 1,E'I EI) ltY R. _. Bay Eon _is.. _,

REPORT M0id ll, April

.g.[,r.rl!ONE @03) 383-4524_

.$ g

'h

fYf, Licensee Pt,,

t Cause & Correciive Attiim to N..

D.d e fj 3y s

,@ y 5 Event y,'y

([o g5 5

3gc Report se vi u Prevent itectorenic o

I-u f

s.

O 4/1 830401 S

0 A

4 HB HIEXCH Power reduction to = 80% due to steam generator considerations.

4/2 830401 F

24.05 A

1 HH HTEXCH

  1. 5 feedwater heater tube leaks.

Twenty-five, tubes required plugging.

4/3 830402 F

50.12 A

1 HA Pump XX Loss of E-H oil 'i'n main turbine due to E-H oil' pump failure.

Pump was replaced.

4/4 830419 F

37.94 A

2 HA Pump XX Loss of E-H system oil pressure due to loss of E-H pumps. The E-H pumps, filters, and unloaders were replaced.

4/5 830424 F

9.72 D

1 83-05 WA CKTBRK

' Service Water Booster, Pump (SWBP) B was

~

out-of-service for maintenance when SWBP-A failed due to a loose contact internal to the motor contactor. The.

motor contactor was replaced.

~

4/6 830429 S

4.6.92 S

1 HB HTEXCH S/G. Inspection Outage.

I 2

~

I 4

Exhihil G. Instnictiom Melhoti:

F: Forced Reason:

S: Sdictinical A Etiuipinent Failore (Explain)

1. Manual for Preparation of D.na H.Mairstenance ci Test 2 Manual Scrain.

lintiy Sheets for I.icensee 1.Autinuatic Scram.

IIveni Repois (I.liR) File (NtlRI.G.

C.R'cGicling 1).Regulatiny Rest:iction 4-Olher (lixplain) 0161) li Operator Training & License Exarnination 5

F-Athninist ative.

lixhibil 1 Same Somce G Operational listor (Explain)

F1/77)

Il Oiher (lixplain) e s

-l W

lY gDOs D WL Carolina Power & Light Company n..

r=--

- nm II. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 11ARTSVILLE, SOUTH CAROLINA 29550 MAY1 C 1983 Robinson File No:

15505 Seridi: RSEP/83-589 Mr. Richard C. DeYoung,. Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. DeYoung:

  • In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the' month of April 1983.

Very truly yours, f'

  1. f. B. St'arkey, Jr.

Cencral Manager H. B. Robinson SEG Plant HRN/jt 0B10 M

Enclosurc 9gs1G30 cc:

R. A.11artfic1d (2) 3Y J. P. O'Reilly (1) ged r