Text
_
I
(
OPERATING DATA REPORT DOCKET NO.
50-261 DATE 830502 COMPLETED llY
- 11. Ray Norris TELEPHONE (803) 383-4524 OPERATING STATUS H. B. Robinson Unit No. 2 Notes
- 1. Unit Name:
- 2. Reporting Period: 830401. 0000 / 830430, 2400 There are' presently 157 spent
- 3. Licensed Thermal Power (MWt):
2300 fuel assemblics in the spent 739 fuel pool.
- 4. Nameplate Rating (Gross MWe):
700
- 5. Design Electrical Rating (Net MWe):
700
- 6. Maximum Dependable Capacity (Gross MWe):
665
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Througir 7) Since Last Report, Give Reasons:
No Change.
1955 MWt reactor power.
- 9. Power Level To Which Restricted,If Any (Net MWe):
Although the unit is not restricted by any outside
- 10. Reasons For Restrictions,1f Any:
agency,1the power level is presently reduced due to steam generator considerations.
v This Month Yr.-to-Date Cumu!ative 719.00 2879.00 106565.00
- 11. Hours In Reporting Period 627.94 2738.90 79578.67
- 12. Number Of Hours Reactor Was Critical 50.01 85.44 1393.21
- 13. Reactor Reserve Shutdown Hours 550.26 2643.52 77479.56
- 14. Hours Generator On-Line
.00
.00 23.20
- 15. Unit Reserve Shutdown Hours 943323.84 4622083.68 155386675.20 l
- 16. Gross Thermal Energy Generated (MWH) 303127.00 1487771.00 29996534.00
- 17. Gross Electrical Energy Generated (MWH) 281048.00 1'195647.00 47267749.00
- 18. Net Electrical Energy Generated (MWH)
~
76.53 91.82 72.71
- 19. Unit Service Factor
[
76.53 91.82 72.73
- 20. Unit Availability Factor
- 21. ' Unit Capacity Factor (Using MDC' Net) -
58.78 72.90 66.70 55.84 69.25 63.37
- 22. Unit Capacity Factor (Using DER Net) 18.13 6.66 13.98
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
None May 20. 1983
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY '
3 l
INITI A L ELECTRICITY COMMERCIAL OPERATION 7,d' 8306160420 830502 I,
PDR ADOCK 05000261 WIll)
R PDR g
I
9 o
n AVERAGE DA!LY UNIT POWER LEVEL DOCKET NO. 50-261 UNIT II. B. Robinson Unit 2 DATE 830502 COMPLETED BY 11. Ray Norris TELEPHONE (803) 383-4524 MONTI{
April 1983
?
DAY AVERAGE DAILY POWER LEVEL
. DAY AVERACE DAILY POWER LEVEL -
(MWe-Net)
(MWe-Net) 558 1
26 37,
2 42 Ig 558
'3
-24 19 514
-25 4
33.
20
.5 510 21 124 6
559 22 539 558 562 23 7
8 561 24 370 9
562 25 319 556 560 26 10 11 560 27 557 12 559 28 392 13 561 29
-23
-20 559 30 14 15 560 31 559 16 INSTRUCTIONS On this format, list the average dail) unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77 )
UNIT SilVTI) OWNS D D l'0WER ltEDilC110NS DOCKlirNO[ 50-261II..X'50
' UNtr NAst1 DATI: 83Q502__. _.._.
COMP 1,E'I EI) ltY R. _. Bay Eon _is.. _,
REPORT M0id ll, April
.g.[,r.rl!ONE @03) 383-4524_
.$ g
'h
- fYf, Licensee Pt,,
t Cause & Correciive Attiim to N..
D.d e fj 3y s
,@ y 5 Event y,'y
([o g5 5
3gc Report se vi u Prevent itectorenic o
I-u f
s.
O 4/1 830401 S
0 A
4 HB HIEXCH Power reduction to = 80% due to steam generator considerations.
4/2 830401 F
24.05 A
1 HH HTEXCH
- 5 feedwater heater tube leaks.
Twenty-five, tubes required plugging.
4/3 830402 F
50.12 A
1 HA Pump XX Loss of E-H oil 'i'n main turbine due to E-H oil' pump failure.
Pump was replaced.
4/4 830419 F
37.94 A
2 HA Pump XX Loss of E-H system oil pressure due to loss of E-H pumps. The E-H pumps, filters, and unloaders were replaced.
4/5 830424 F
9.72 D
1 83-05 WA CKTBRK
' Service Water Booster, Pump (SWBP) B was
~
out-of-service for maintenance when SWBP-A failed due to a loose contact internal to the motor contactor. The.
motor contactor was replaced.
~
4/6 830429 S
4.6.92 S
1 HB HTEXCH S/G. Inspection Outage.
I 2
~
I 4
Exhihil G. Instnictiom Melhoti:
F: Forced Reason:
S: Sdictinical A Etiuipinent Failore (Explain)
- 1. Manual for Preparation of D.na H.Mairstenance ci Test 2 Manual Scrain.
lintiy Sheets for I.icensee 1.Autinuatic Scram.
IIveni Repois (I.liR) File (NtlRI.G.
C.R'cGicling 1).Regulatiny Rest:iction 4-Olher (lixplain) 0161) li Operator Training & License Exarnination 5
F-Athninist ative.
lixhibil 1 Same Somce G Operational listor (Explain)
F1/77)
Il Oiher (lixplain) e s
-l W
lY gDOs D WL Carolina Power & Light Company n..
r=--
- nm II. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 11ARTSVILLE, SOUTH CAROLINA 29550 MAY1 C 1983 Robinson File No:
15505 Seridi: RSEP/83-589 Mr. Richard C. DeYoung,. Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. DeYoung:
- In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the' month of April 1983.
Very truly yours, f'
- f. B. St'arkey, Jr.
Cencral Manager H. B. Robinson SEG Plant HRN/jt 0B10 M
Enclosurc 9gs1G30 cc:
R. A.11artfic1d (2) 3Y J. P. O'Reilly (1) ged r
I (
,