Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080M942 + (13:58:24, 14 December 2024)
- ML20080M938 + (13:58:25, 14 December 2024)
- NLS8400060, Application for Amend to License DPR-46,consisting of Proposed Change 12,revising LER Sys + (13:58:25, 14 December 2024)
- 05000346/LER-1984-001, :on 840108,reactor Tripped.Caused by Automatic Insertion of Axial Power Shaping Rods.Faulty Sys Logic Card Repaired + (13:58:27, 14 December 2024)
- ML20080M931 + (13:58:30, 14 December 2024)
- ML20080M930 + (13:58:31, 14 December 2024)
- ML20080M927 + (13:58:32, 14 December 2024)
- ML20080M925 + (13:58:32, 14 December 2024)
- ML20080M923 + (13:58:33, 14 December 2024)
- BECO-84-026, Monthly Operating Rept for Jan 1984 + (13:58:34, 14 December 2024)
- LIC-95-0060, Forwards FCS Performance Indicators Jan 1995 + (13:58:34, 14 December 2024)
- ML20080M917 + (13:58:35, 14 December 2024)
- 05000338/LER-1984-002, :on 840118,RCS Vented to Containment Atmosphere & Single Train Inadvertent ECCS Actuation Occurred at 110 F During Removal of Solid State Protection Sys Output Fuses. Caused by Lack of Procedural Guidance + (13:58:37, 14 December 2024)
- ML20080M910 + (13:58:38, 14 December 2024)
- ML20080M908 + (13:58:38, 14 December 2024)
- 3F0284-09, Application for Amend to License DPR-72,revising Tech Specs to Include Addl DHR Requirements.Amend Fee Encl + (13:58:39, 14 December 2024)
- 05000373/LER-1984-004, :on 840118,reactor Bldg Ventilation Sys Shut Down Following Receipt of Unit 2 Primary Containment Isolation Signal.Caused by Accidental Movement of Relay 2B21H-K66 by Const Personnel + (13:58:41, 14 December 2024)
- ML20080M898 + (13:58:42, 14 December 2024)
- RC-95-0056, Forwards Summary Description of Proposed Vehicle Control Measures.Encl Withheld Per 10CFR73.21 + (13:58:42, 14 December 2024)
- ML20080M890 + (13:58:43, 14 December 2024)
- ML20080M881 + (13:58:44, 14 December 2024)
- BSEP-95-0057, Semiannual Radioactive Effluent Rept,940701-1231 + (13:58:45, 14 December 2024)
- ML20080M859 + (13:58:46, 14 December 2024)
- ML20080M857 + (13:58:46, 14 December 2024)
- ST-HL-AE-1006, First Interim Deficiency Rept Re Corrosion on Reactor Containment Bldg post-tensioning Sys Tendons.Initially Reported on 830826.Evaluation Underway to Determine If Condition Impairs Tendon Strength.Next Rept by 840229 + (13:58:47, 14 December 2024)
- ML20080M852 + (13:58:48, 14 December 2024)
- ML20080M847 + (13:58:49, 14 December 2024)
- ML20080M846 + (13:58:49, 14 December 2024)
- ML20080M841 + (13:58:50, 14 December 2024)
- ML20080M844 + (13:58:50, 14 December 2024)
- 05000346/LER-1995-001, :on 950126,determined That LOCA Analysis Results for 2 Ft Core Elevation Potentially non-conservative Due to Modeling Errors.Vendor Evaluated Current Fuel Cycle to Determine If Operating Limits Valid + (13:58:52, 14 December 2024)
- ML20080M828 + (13:58:53, 14 December 2024)
- ML20080M823 + (13:58:54, 14 December 2024)
- ML20080M822 + (13:58:55, 14 December 2024)
- IR 05000285/1983028 + (13:59:33, 14 December 2024)
- ML20080M811 + (13:59:34, 14 December 2024)
- ML20080M809 + (13:59:35, 14 December 2024)
- ML20080M807 + (13:59:36, 14 December 2024)
- ML20080M804 + (13:59:37, 14 December 2024)
- ML20080M801 + (13:59:38, 14 December 2024)
- ML20080M795 + (13:59:39, 14 December 2024)
- ML20080M796 + (13:59:39, 14 December 2024)
- ML20080M791 + (13:59:40, 14 December 2024)
- ML20080M789 + (13:59:40, 14 December 2024)
- ML20080M771 + (13:59:41, 14 December 2024)
- ML20080M778 + (13:59:41, 14 December 2024)
- 05000336/LER-1995-002-01, :on 950125,confirmed That Assumptions Made for Original Design Basis Analysis for Containment Sump Isolation Valve non-conservative.Caused by Inadequate Evaluation.Second Review Completed + (13:59:43, 14 December 2024)
- ML20080M759 + (13:59:44, 14 December 2024)
- ML20080M756 + (13:59:45, 14 December 2024)
- ML20080M752 + (13:59:45, 14 December 2024)
- FVY-83-104, Advises That Assessment of Two Viable Options for Location of Primary Emergency Operations Facilities,Per Suppl 1 to NUREG-0737,scheduled for Completion in Early Nov 1983.Final Decision Expected by 831119 + (13:59:46, 14 December 2024)
- ML20080M748 + (13:59:47, 14 December 2024)