ML20080M778

From kanterella
Jump to navigation Jump to search
Man-Rem Final End of Year Rept for 1994
ML20080M778
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 12/31/1994
From: Tremblay L
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.016, RTR-REGGD-1.016 BVY-95-25, NUDOCS 9503060029
Download: ML20080M778 (4)


Text

.-

]

b . .

l i

VERISONT -YANKEE

[

NUCLEAR POWER CORPORATION t

.- Ferry Road, Brattleboro VT 05301-7002 l

! nmv to j ENGINEERING 0FFICE ' .)

l '

i 580 MAIN STREET BOLTON, MA 01740 -

($08) 779-6711 February 28,1995 BVY 95 - 25

j. United States Nuclear Regulatory Commission ATTN: DocumentControlDesk Washington, DC 20555

References:

a. License No. DPR-28 (Docket No. 50-271) -

l Subject 1994 Annual Report of Personnel Exposure As required by Vermont Yankee Technical Specification 6.7,A.2, enclosed please find our annual report of personnel exposure. The enclosures consist of a report entitled " Reg. Guide 1.16 Man-Rem Final End of the Year Report for 1994", as well as a summary of any special maintenance conducted. This report covers the period beginning January 1,1994 and ending l

December 31,1994.

Should you have any questions with regard to this information, please contact this office.-

Sincerely, j i

'/ERMONT YANKEE NUCLEAR POWER CORPORATION h% ,

M Clif / ,

Leonard A. Tremblay, Jr., P.E.

Senior Licensing Engineer

(

l l

1 cc: USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager- VYNPS  !

I .

(? " C r o ::

s l 9503060029 941231 i j ADOCK 05000271 ho l PDR ,

R PDR ,

- . ..~ . . . . - . - . ..

i e

1 9

1 VIrmont Yankee Euclair Power Ctrp.

REG. GUIDE 1.16 MAN-REM FINAL END OF THE YEAR REPORT FOR 1994 NUMBER OF PERSONNEL OVER 100 MREM TOTAL MAN-REM

, STATION UTILITY CONTRACT WORKERS STATION. UTILITY CONTRACT WORKERS EMPLOYEES EMPLOYEES AND OTHERS EMPLOYEES. EMPLOYEES AND OTHERS REACTOR OPERATIONS & SURVE!LLANCE MAINTENANCE 16 0 22 4.146 0.000 7.262 OPERATIONS 22 0 9 6.422 0.000 0.293 HEALTH PHYSICS 11 0 4.076 0.000 0.866'

' SUPERVISORY. 0 0 0.000 0.000 'O.000 ENGINEERING 0 0 0 0.082 0.000 0.000 OTHER 2 0 0 0.540 0.000 0.003 .i SECU2 TTY 0 0 0 0.000 0.000 0.000 ROUTINE MAINTENANCE MAINTENANCE 8 0 10 2.318 0.000' 5.349 OPERATIONS 3 0 0 0.674 0.000 0.000 HEALTH PHYSICS 1 0 4 0.594 0.000 1.407 -

. SUPERVISORY 0 0 0 0.000 0.000 0.000 ,

ENGINEERING 0 0 0 0.002 0.000 0.000

]

OTHER 0 0 0 0.196 0.000 0.000 1 SECU21TY 0 0 0 0.000 0.000 0.000 INSERVICE INSPECTION MAINTENANCE O O O 0.000 0.000 0.000. ]

OPERATIONS 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS 0 0 0 0.004 0.000 -0.000 SUPERVISORY 0 0 0 0.000- 0.000 0.000 ENGINEERING 0 0 0 0.015 0.000 0.000 l OTHER 0 0 0 0.000 0.000, 0.000 SECURITY 0 0 0 0.000 0.000 0.000 SPECIAL MAINTENANCE MAINTENANCE 1 0 9 0.442 0.000 2.942 OPERATIONS 0 0 0 0.070 0.000 0.000 HEALTH PHYSICS 0 0 0 0.197 0.000 0.011 SUPERVISORY 0 0 0 0.000 0.000 0.000 I ENGINEERING 0 0 0 0.000 0.000 0.000 OTHER 0 0 0 0.020 0.000 0.000 SECU21TY 0 0 0 0.000 0.000 0.000

, WASTE PROCES$1NG MAINTENANCE O O 0 0.008 0.000 0.014 l OPERATIONS 0 0 0 0.000 0.000 0.000 l HEALTH PHYSICS 0 0 0 0.023 0.000 0.000 SUPERVISORY 0 0 0 0.000 0.000 0.000 ENGINEERING 0 0 0 0.000 0.000 0.000 OTHER 0 0 0 0.000 0.000 0.000 SECU21TY 0 0 0 0.000 0.000 0.000 l

t l REFUELING KAINTENANCE O O 0 0.014 0.000- 0.030 OPERATIONS 0 0 0 0.112 0.000 .0.000 HEALTH PHYSICS 0 0 0 0.003 0.000 0.001 SUPERVISORY 0 0 0 0.000 0.000 0.000 ENGINEERING 0 0 0 0.000 0.000 0.000 OTHER 0 0 0 0.000 0.000 0.000

( SECURITY. 0 0 0 0.000 0.000 0.000 l

5 e

TOTALS MAINTENANCE 25 0 41 6.928 0.000 15.596 OPERATIONS 25 0 1 7.278 0.000 0.293 HEALTH PHYSLCS 12 0 5 4.897 0.000 2.285 l SUPERVISORY 0 0 0 0.000 0.000 0.000 ENGINEERING 0 0 0 0.100 0.000 0.000

OTHER 2 0 0 0.756 0.000 0.003 i

SECURITY 'O O O 0.000 0.000 0.000 l

l

! GRAND TOTAL ,

64 0 47 19.959 0.000 18.177


-- -- 3Ef N Approved by : -- -

R fat}onP/otectionManager Date '

l 1

I l l

l t

I

ENCLOSURE TO BVY 95 - 25 Descriotion of Soccial Maintenance Activities Performed at Vermont Yankee Durine Calendar Year 1994 RDS-1000 System Installation There was one project in 1994 designated as Special Maintenance. This was the installation of the RDS-1000 System. He system is used to dewater resin inside of a shipping cask and liner, thus reducing personnel exposure associated with this task.

-4 -

w - m.. . y--,., ,,,