BECO-84-026, Monthly Operating Rept for Jan 1984

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1984
ML20080M918
Person / Time
Site: Pilgrim
Issue date: 01/31/1984
From: Hamilton P, Harrington
BOSTON EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BECO-84-026, BECO-84-26, NUDOCS 8402220010
Download: ML20080M918 (7)


Text

. AVERAGE DAILY UNIT POWER LEVEL 50-293 DOCKET NO.

UNIT Pilgrim I DATE February 14, 1984 COMPLETED BY _P. Hamilton TELEPHONE (617) 746-7900 January, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (Mwe. Net)

0. ,7 o,

2 0- 18 n_

3 0. ,___ 39 0.

4 O. 0, 20 5 0. 21 n_ ,

6 0. 22 0.

7 0. 23 0.

8 0. 24 9 0. 25 0.

10 0. 26 0.

O.

11 27 0.

12

0. 23 0. .,

13 0. 29 0.

14 0. 30 0.

15

0. 0.

31 16 0.

INSTRUCTIONS i On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Cornpute to the nearest whole megawatt.

(9/77) 8402220010 840131 PDR ADOCK 05000293 R PDR

_ __ -, -.m.

a _ _ _ .

OPERATING DATA REPORT DOCKET NO.

50-293 DATE Feb run rv 14, 1984 COMPLETED BY P.J. Hamilton TELEPHONE N 71 7A6-7900 OPER ATING STATUS Pilgrim I Notes

1. Unit Name: January, 1984
2. Reporting Period:

140R-

3. Licensed Thermal Power (MWsI:
4. Nameplate Rating (Gross MWeJ: 67$.

655. ,

5. Design ElectricalRating(Net MWe):

690.

6. Maximum Dependable Capacity (Gross MWe): _670.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

-None None

9. Power Lesel To Which Restricted. If Any (Net MWe):

M/A 10.' Reasons For Restrictions.If Any:

This Month Yr to-Date Cumulative 744.0 744.0 97704.n

' i1. Hours In Reporting Period 0.0 69746.3 0.0

12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0 _
13. Reactor Reserve Shutdown Hours 0.0 nn 67534.0
14. Hours Generator On Line 0.0 0_n 0.0
15. Unit Reserve Shutdown Hours 0.0 116932632.0
16. Gross Thermal Eneigy Generated (MWH) n0 0.0 0.0 39228314.0 . . .
17. Gross Electrical Energy Generated (MWH) 37693409.0 0.0 0.0
18. Net Electrical Energy Generated (MWHg 0.0 0.0 69.1
19. Unit Service Factor 0.0 W1 0.0
20. Unit Availability Factor 57.6

.0.0 0.0

21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 58.9
22. Unit Capacity Factor (Udng DER Net) 9.2 0.0 0.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

Shutdown for refueling and recirculation pipe repair - Outage commenced on December 10, 1983.

August, 1984

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achieved

26. Units in Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY .

INITIA L ELECTRICITY COMMERCIAL OPER ATION (9/77I sn:,:s

50-293 IINt T SilillDOWNS AND POWER RFDtM'TIONS IMX'KIIT No.

LINIT NAME Pilgrim 1 DATF. _f.chruary 164 GWPl.EIEDBY P. Hami.lton RFPOR T MONill JANUARY 1984 (617) 746-7900 T EI.F.Pfl0NE i

i w -

~c b !I Nff .b. o Catete & forseg tive

] '- D;dc y g8 ,N fge Fvent 37 gOj At.,;on in o- E 305y RcP'"I # 'n U g Pievent Recurrente 6

16 83/12/10 S 744.0 C 1 N/A N/A N/A N/A - Shutdown for refueling and recirculation pipe repair.

Twoe Egason Method Svstem 8 Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 4 H 5-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report a License Examination 9-Other (LER) File (HUREG-8161) 9

~

REWELING INFORMAXION_

The following refueling information is included in the Monthly Repcrt as requested in an NRC letter to BECo dated January 18, 1978:

For your convenience, the information suprlied has been enumsrated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Power Station, Docka*:

Number 50-293.

2. Scheduled date for nart Refueling Shutdown: March, 1986
3. Scheduled date for restart following refueling: August, 1984 4.
5. Due to their s4mf1=rity, requests 4, 5, & 6 are responded to collectively:
6. The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8x8R design, as loaded tha previous outage consisting of 112 E8DRB282 assemblies cid 60 P8DRB265 assemblies.
7. (a) There are 0 fuel assemblies in the core.

(b) There are 1708 fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies.

The actual spent fuel storage capacity is 1770 fuel assenblies at present.

( 1) The planned spent fuel storage capacity is 2320 fuel assembif ss.

9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodsce an additional .62 fuel assemblies.

BOSTON EDISON COMPANY PILGRIM NUCLEAR POWFJL STATION

' * ~' . DOCKET NO- 50-293 Operational Summary for JANUARY, 1984 The Unit has "been shut down all month for the 1983 Refueling Outage and recirculation pipe repair.  ; .

All outage work continues.

Safety Relief Valve Challen'ges Month of JANUARY, 1984 Requireme~nt: T.M.I. T.A.P. II.K.3.3 Reason: No safety / relief valve challenges occurred during the the month of January, 1984. Refuel Outage #6 in pro-gress.

2 5

-. . ~. - . ~ _ . _ - . - - . - . . . _ , . . . . . . - __ . _ _ . - _ _ -

PILGRIM NUCLEAR POWER STATION Month Janunry, 1984 MAJOR SAFETY RELATED MAINTENANCE ,

CORRECTIVE ACTION STSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT RECURRENCE -ASSOCIATED LER

~

RCIC A0-1301-71 Blowing Steam Leaking Re-injected with Valve to be replaced. N/A Gasket Furmanite HVAC A0/N 83 Damper Blades Worn gears Replaced drive ESR submitted to evaluate . N/A do not close Gears gear and re- this situation.

furbished drives Fire Sprinkler Weight latch Loose Replaced exist- None: Routine Maintenance N/A Protection Sys M.G. Rm. disconnected threads ing weight and Pre

  • action tightened fast-Sprinkler ener Fire "A" Fire Blown gasket Wear Replaced per None: Routine Maintenance N/A Protection Water Storage M-300 Specifi-Tank cations 1

I T

o 1

0 0

P EDETON EDISON C OM PANY B00 80VLsTON STREET BOSTON, MAssACHUBETTs 02199 WILLIAM D. HARRINGTON eEnsen woes passess=v

=sau.

February 14, 1984 BEco Ltr. # 84-026 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attn: Document Control Desk Docket No. 50-293 License DPR-35

Subject:

January 1984 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

Respectfully submitted, William D. Harrington l

I l cc: Regional Administrator, Region 1 l

U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 U. S. Nuclear Regulatory Commission

! Document Control Desk I Washington, D. C. 20555 b

W h

. . . . . -- .