Responds to NRC 830728 & 0902 Ltrs Re IE Insp Rept 50-483/83-14.Turbine Driven Auxiliary Feedwater Pump Turbine Control Panel Procured,Received & Installed
ML20080M795
Person / Time
Site: Callaway 
Issue date: 09/20/1983
From: Schnell D
UNION ELECTRIC CO.
To: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20080M782 List:
References
ULNRC-666, NUDOCS 8310040273
Download: ML20080M795 (1)


Text

UNION ELECTRIC COM PANY IEcl GP ATIOT STREET ST. Louis, MISSOURI manumm aoonass:

DONALD F. sCHNELL P. O. BOX 149 September 20, 1983 Mr.

R.

C. Knop, Chief Projects Branch 1 US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 ULNRC-666

Dear Mr. Knop:

INSPECTION REPORT NO. 50-483/83-14

References:

1.

R.

C.

Knop letter to D.

F.

Schnell dated July 28, 1983

2. ULNRC-655 dated August 26, 1983 3.

R. C. Knop letter to D.

F.

Schnell dated September 2, 1983 References one and two forwarded the USNRC, Region-III I&E Inspection Report No. 30-483/83-14 and the Union Electric response, respectively.

Reference three acknowledged receipt of reference two, but also indicated an understanding about the turbine driven auxiliary feed-water pump turbine control panel which, perhaps, needs further clarification.

This turbine control panel was indeed procured, received and installed as a aafety-related item.

This clarification was discussed with Mr. P. Pelke of your Region III staff by Mr.

J.

R.

Veatch of our Callaway Plant Construction Quality Assurance staff-on September 12, 1983.

If you have any questions regarding this clarification, or if additional information is required, please let me know.

Very truly yours, Y

l t

s Donald F.

Scanell RWD/jds cc:

Mr. H. M. Wescott, NRC Region III NRC Resident Inspector, Callaway Plant Missouri Public Service Commission 8310040273 830930 PDR ADOCK 05000483 SEP 2 21983 O