Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211N661 + (ML20211N661)
- RBG-44217, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/97-03 on 970804-08.Corrective Actions:Counseled Radwaste Shipping Personnel for Failure to Follow Procedural Requirements + (ML20211N662)
- ML20211N663 + (ML20211N663)
- NSD-NRC-97-5368, Forwards Response to RAI Re Control Rod Insertion Assumptions in AP600 SSAR LOCA Analyses.Nrc Should Inform W of Status to Be Designated in NRC Status Column of Oits + (ML20211N664)
- ML20211N665 + (ML20211N665)
- ML20211N667 + (ML20211N667)
- ML20211N668 + (ML20211N668)
- 05000334/LER-1997-030, :on 970908,failure to Comply W/Edg TS Action Statement Was Identified.Caused by Inadequate Interpretation of Ts.Revised Procedure 3.4, Clearance Procedure to Agree W/Ts Action Statement 3.8.1.1.b + (ML20211N669)
- ML20211N671 + (ML20211N671)
- ML20211N672 + (ML20211N672)
- ML20211N673 + (ML20211N673)
- BECO-LTR-97-101, Forwards Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program, Which Incorporates post-refueling Outage 11 Changes & Plant 10CFR50 App J,Option B License Amend + (ML20211N674)
- ML20211N675 + (ML20211N675)
- ML20211N678 + (ML20211N678)
- ML20211N680 + (ML20211N680)
- ML20211N682 + (ML20211N682)
- BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station + (ML20211N683)
- IR 05000338/1986008 + (ML20211N684)
- ML20211N685 + (ML20211N685)
- ML20211N687 + (ML20211N687)
- ML20211N688 + (ML20211N688)
- ML20211N690 + (ML20211N690)
- ML20211N691 + (ML20211N691)
- ML20211N694 + (ML20211N694)
- ML20211N695 + (ML20211N695)
- ML20211N696 + (ML20211N696)
- ML20211N697 + (ML20211N697)
- ML20211N698 + (ML20211N698)
- ML20211N699 + (ML20211N699)
- ML20211N701 + (ML20211N701)
- ML20211N702 + (ML20211N702)
- ML20211N703 + (ML20211N703)
- IR 05000461/1986028 + (ML20211N704)
- ML20211N705 + (ML20211N705)
- ML20211N709 + (ML20211N709)
- ML20211N712 + (ML20211N712)
- ML20211N713 + (ML20211N713)
- TXX-6138, Interim Deficiency Rept CP-85-31 Re Indeterminate Structural Integrity of Electrical Raceway Support Sys.Initially Reported on 850827.Addl Supports Added & Conduit Supports Modified.Next Rept Will Be Submitted by 870310 + (ML20211N714)
- ML20211N716 + (ML20211N716)
- ML20211N717 + (ML20211N717)
- ML20211N719 + (ML20211N719)
- ML20211N721 + (ML20211N721)
- ML20211N722 + (ML20211N722)
- L-99-136, Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls + (ML20211N723)
- ML20211N724 + (ML20211N724)
- 05000410/LER-1987-008, :on 870127,violation of Limiting Condition for Operation Occurred During mark-up of Carbon Dioxide Fire Suppression Sys.Caused by Misinterpretation of Communication by Personnel.Signature for Actions Required + (ML20211N725)
- CY-97-110, Discusses Planned Movement of Fuel within Plants Spent Fuel Pool to Reduce Potential Impact of Beyond Design Basis Event Which Assumes Loss of Fuel Pool Coolant Inventory + (ML20211N726)
- ML20211N727 + (ML20211N727)
- ML20211N728 + (ML20211N728)
- 05000219/LER-1986-028, :on 861110,reactor lo-lo Water Level Initiation Signals Discovered Jumpered Out Since 861103 & Reactor Bldg Ventilation Not Secured.Caused by Personnel Error.Equipment Control Procedure Will Be Revised + (ML20211N731)
- ML20211N732 + (ML20211N732)