Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196J233 + (ML20196J233)
- ML20196J235 + (ML20196J235)
- ML20196J237 + (ML20196J237)
- ML20196J238 + (ML20196J238)
- ML20196J239 + (ML20196J239)
- 05000254/LER-1987-019-02, :on 870914,as Found Leakage Exceeded Tech Spec 3.7.A.2.b Limit.Cause Not Determined.Valves & Penetrations Tested as Required by Local Leak Rate Test Program.Several Valves & Penetration Repaired or Replaced + (ML20196J241)
- ML20196J242 + (ML20196J242)
- ML20196J243 + (ML20196J243)
- ML20196J244 + (ML20196J244)
- ML20196J247 + (ML20196J247)
- ML20196J252 + (ML20196J252)
- NSD-NRC-97-5248, Responds to Discussion Conducted During 970709 Senior Mgt Meeting W/W Re AP600 Design Certification,Loss of Off Site Power & No Pressurizer Relief Valve Lift.Ssar Chapter 15 Safety Analysis Based on Conservative Assumptions + (ML20196J254)
- ML20196J255 + (ML20196J255)
- ML20196J258 + (ML20196J258)
- ML20196J259 + (ML20196J259)
- ML20196J261 + (ML20196J261)
- ML20196J262 + (ML20196J262)
- ML20196J263 + (ML20196J263)
- 05000328/LER-1988-006-01, :on 880207,main Steam Isolation Occurred & Reactor Trip Signal Generated by ESF Actuation Sys.Caused by Improper Compliance W/Procedures & Nuance Between Operating Procedures.Procedure Changed & Recategorized + (ML20196J268)
- IR 05000313/1988006 + (ML20196J269)
- ML20196J270 + (ML20196J270)
- ML20196J271 + (ML20196J271)
- ML20196J272 + (ML20196J272)
- NG-97-1335, Responds to Violations Noted in Insp Rept 50-331/97-09. Corrective Actions:Revised Maint Instruction Form Associated W/Corrective Maint Action Request,Counseled Personnel Involved & Initiated Review of Previous Tagout Errors + (ML20196J275)
- ML20196J276 + (ML20196J276)
- ML20196J277 + (ML20196J277)
- ML20196J278 + (ML20196J278)
- ML20196J281 + (ML20196J281)
- ML20196J283 + (ML20196J283)
- ML20196J285 + (ML20196J285)
- 05000423/LER-1997-037, :on 970516,discovered That RHR Sys Testing During Transition to Mode 4 Incorrectly Used RHR One Hour out-of-service Allowance.Caused by Improper Interpretation Contained in Ts.Submitted TS Change Request + (ML20196J287)
- ML20196J288 + (ML20196J288)
- ML20196J289 + (ML20196J289)
- ML20196J290 + (ML20196J290)
- ML20196J292 + (ML20196J292)
- ML20196J294 + (ML20196J294)
- 05000414/LER-1997-005-02, :on 970626,automatic Reactor Trip Occurred While in Mode 1.Caused by Equipment Failure of Cutler-Hammer E30JY5 Close/Trip Push Button Switch.Maint & Engineering Found & Replaced Defective Switch + (ML20196J295)
- ML20196J299 + (ML20196J299)
- ML20196J300 + (ML20196J300)
- ML20196J301 + (ML20196J301)
- ML20196J303 + (ML20196J303)
- ML20196J304 + (ML20196J304)
- IR 05000334/1998006 + (ML20196J305)
- ML20196J307 + (ML20196J307)
- ML20196J308 + (ML20196J308)
- ML20196J310 + (ML20196J310)
- ML20196J313 + (ML20196J313)
- ML20196J314 + (ML20196J314)
- ML20196J317 + (ML20196J317)
- ML20196J319 + (ML20196J319)
- ML20196J320 + (ML20196J320)