JUN 2 81988
-Docket No. 50-373
- Docket No. 50-374
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL '60600
Gentlemen:
This refers to the routine safety inspection conducted by Mr. Z. Falevits
of this office on April 4-6 and May 3,1988, of activities at LaSalle County
Station, Units 1 and 2, authorized by NRC Operating Licenses No. NPF-11 and
No. NPF-18 and to the discussion of our findings with Mr. G. J. Diederich and
others of your staff at the conclusion of the inspection. This inspection was
conducted to review the drywell temperature monitoring program.
The enclosed copy of our-inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required. This inspection showed that you have failed to adequately carry
out past commitments to the NRC and the tasks associated with the drywell
temperature monitoring program. Specifically, some of the required temp-atures
were not taken and submitted to engineering for evaluation; and a Special Report
. required by Technical Specification 3.7.7 a was not submitted within the
required time frame. Previous Inspection Reports No. 374/86018 and
No. 373/85026 contained similar violations.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
.
8807060347 8806
ADOCK O
0 73
PNV
- k
G
/N/
L
p :c
-
_ -
-
p
^
.
.
.
=.
.
_
- .
g
.
.
~
Comonwealth < Edison - Company'.
2
'
. e wil1-gladly. discuss any questions you have concerning this inspection.
W
,
.
Sincerely,.
Q.;
Original Signed'Bi 'J. ). Hanisea
~ ~
'
v..
H. J. Miller, Director
. Division.of Reactor Safety
Enclosures:
1.
2~
Inspection Reports
.
No.50-373/88012(DRS);and
'No. 50-374/88011(DRS)
cc w/ enclosures:
H. Bliss, Nuclear
Licensing Manager
G. J. Diederich, Plant
Manager
DCD/DCB (RIDS)
Licensing' Fee Management Branch
. Resident Inspector, RIII
Richard Hubbard.
J. W. McCaffrey, Chief, Public
Utilities Division
David Rosenblatt, Governor's
.0ffice of Consumer Services
.
l
1
l~
RIII
RIII
R II
II
R II
g,
MA
6
f
Fa ev ts/ims
rdger
i c(
rrison
Mi
r
~
D@9
9 D6
l
6/
f
u\\wh\\
L