Safety Evaluation Supporting Amend 208 to License NPF-6
ML20196J277
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/29/1999
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20196J264 List:
References
GL-91-08, GL-91-8, NUDOCS 9907070213
Download: ML20196J277 (5)


Text

?.

~

.s v.

l1; 4

L m nog 7

p 1!k-UNITED STATES r

j-

' NUCLEAR REGULATORY COMMISSION I

WASHINGTON, D.C. 30006 0001 i

- SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATJQN l

lr RELATED TO AMENDMENT NO. 208 TO t

FACILITY OPERATING LICENSE NO. NPF-6 ENTERGY OPERAT!ONS. INC.

L ARKANSAS NUCLEAR ONE. UNIT NO. 2 l

l DOCKET NO,50-368

1.0 INTRODUCTION

By letter dated August 6,1998 (2CAN089802), as supplemented by letter dated May 18,1999 j

(2CAN059906), Entergy Operations, Inc. (the licensee), submitted a request for changes to the l

Arkansas Nuclear One, Unit No. 2 (ANO 2), Technical Specifications (TSs). The requested

^,

changes would revise TS 3.1.3.2, " Reactivity Control Systems, Position Indicator Channels -

. Operating," to adopt requirements that are consistent with NUREG 1432," Standard Technical 3

- Specifications for Combustion Engineering Plants." in addition, the proposed change would relocate TS Table 3.8-1, " Containment Penetration Conductor Overcurrent Protective Devices,"

to licensee control procedures in accordance with the guidance provided in Generic Letter 91-08," Removal of Component Lists From Technical Specifications."

The May 18,1999 (2CAN0599065), letter provided clarifying information that did not change the scope of the original application and the initial proposed no significant hazards consideration determination.

2.0 EVALUATION 2.1 Control Element Assembiv Position Indicatlon Technical Specification 3.1.3.2, " Reactivity Control Systems, Position Indicator Channels -

- Operating," requires at least two of the three stated methods of verifying indication of control element assembly (CEA) position to be operable. The Action statement for TS 3.1.3.2 provides i

l guidance for conditions in which a single CEA per CEA group has less then two means of l

Indicating CEA position. However, Limiting Condition For Operation (LCO) 3.0.3 would apply if l

two CEAs within a CEA group had less then two means of indicating CEA position as this condition is not addressed in TS 3.1.3.2. The proposed change would revise the Action l

Statement for TS 3.1.3.2 to address CEA position indication on an individual CEA basis with I

requirements that would not depend on the associated CEA group. In addition, TS 3.1.3.2, Action c, would be revised to include references to TS 3.1.3.1, " Reactivity Control Systems, 1

CEA Position," and TS 3.1.3.5, " Reactivity Control Systems, Shutdown CEA Insertion Limits,"

-- which provide limitations on the positioning of CEAs.

i 9907070213 990629 PDR ADOCK 05000368 P

PDR j.

a t

e

. ~,

. The axial position of shutdown and regulating CEAs is indicated by two separate and independent systems, which are the plant computer CEA pulse counting position indication system and the reed switch position transmitter (RSPT) indication system. The pulse counting position indication system counts the commands sent to the CEA gripper coils from the control element drive mechanism control system (CEDMCS) that moves the CEAs. There is one step counter for each group of CEAs. Individual CEAs in a group all receive the same signal to move and should, therefore, all be at the same position indicated by the group step counter for that group. The pulse counting position indication system is considered highly precise because one step equals 3/4 inch of CEA movement. If a CEA does not move one step for each command signal, the step counter will still count the command and incorrectly reflect the position of the CEA.

The RSPT indication system provides a highly accurate indication of actual CEA position, but at a lower precision than the step counter. The two reed switch stacks (RSPT #1 and RSPT #2) are mounted outside the reactor coolant system (RCS) pressure boundary, along the upper pressure housing. The individual reed switches are actuated by the permanent magnet

- attached to the top of the CEA extension shaft. No mechanical or electrical connections exist between the permanent magnet and the reed switches, only magnetic lines of flux that penetrate the RCS pressure boundary to actuate the switches. This system is based on inductive analog signals from a series of reed switches spaced along a tube with a center to center distance of 1.5 inches, which equates to two steps.

In addition to RSPT #1 and RSPT #2, a pair of reed switches are positioned for the lower electrical limit (LEL) and the upper electrical limit (UEL) for each CEA. These reed switches are positioned at the fully inserted and the fully withdrawn positions. The LELs and the UELs are j

referrect to by TS 3.1.3.2, Action c, and its Bases as the " Full In" and " Full Out" limits, j

respectively. These limits provide a position indication system to the operator in the form of a light at the CEA control panel when the CEA is at the respective positions. The TS allows the use of the LELs and UELs as an independent means of determining CEA position. However, they are allowed if only two of the required CEA position indications for an individual CEA are inoperable and the associated CEA is positioned to the associated electrical limit.

During normal 100 percent power operation, the CEAs are fully withdrawn at the programmed insertion limit. The programmed insertion limit was developed due to the concern with CEA guide tube / finger tip wear concerns. The programmed insertion limit is discussed in a letter dated June 16,1978, from Robert E, Martin of the NRC to the licensee. The programmed insertion limit starts the operating cycle with all the CEAs fully withdrawn or at the UEL. At approximately every 90 effective full power days (EFPD) throughout the cycle, the CEAs are inserted an additional step (one step equals 3/4 inch) until they are three steps inserted. At approximately every 90 EFPD interval thereafter, the CEAs are withdrawn a step. This process is continued until the CEAs are again at their UEL. The process is then repeated until the

- particular operating cycle is over. This periodic movement of the CEAs allows the CEA finger tips to be inserted inside the CEA guide tube varying amounts and, thus, spreading the wear pattem over a larger surface area. Currently, TS 3.1.3.2, Action c, requires that all CEAs associated with_ the group be placed at the " full in" or " full out" position when an individual CEA in the group has only one of the required means of position indication. This action prevents the use of the programmed insertion limit as previously discussed.

3.

The NRC staff has reviewed the TSs covering CEA position and the information provided by the l

. licensee supporting the proposed change. The staff has determined that removing references to the CEA group from the Action statement for TS 3.1.3.2 would prevent an unnecessary entry into LCO 3.0.3 if a second CEA in a CEA group had only one of the required means of position indication.' In addition, the proposed change would allow the other CEAs in the respective group to follow the programmed insertion limit, as applicable, if a single CEA had only one of the required means of position indication. The current TS has references to the CEA group due to the design of the CEA pulse counting position indication system, which counts the movement commands sent to the CEA group rather then the individual CEA. However, the staff has determined that the controls specified in TS 3.1.3.1, TS 3.1.3.5, and TS 3.1.3.6 are sufficient to control the position of CEAs and CEA groups. In addition, the RSPT indication system provides two separate reed switch stacks that are capable of providing position indication on an individual CEA basis. Thus, when combined with the LEL or UEL reed switch as specified in the Action statement, at least one means of CEA position indication based on CEA specific reed switches will be available. Therefore, the requirements for CEA position indication can be controlled on an individu6J CEA basis without adversely effecting the controls on CEA position.

The TS requirements for individual CEA position indication remain unchanged. This change is consistent with NUREG-1432, " Standard Technical Specifications for Combustion Engineering Plants." Based on the above, the staff concludes that the proposed change is acceptable.

2.2 Containment Penetration Conductor Overcurrent Protective Devices Technical Specification 3.8.2.5, " Electrical Power Systems, Containment Penetration Conductor

' Overcurrent Protective Devices," specifies the operability requirements for the containment electrical penetration circuit overcurrent protective devices. TS Table 3.8-1 provides a list of containment penetration conductor overcurrent protective devices and is referenced to describe the individual plant components covered by the requirements of TS 3.8.2.5. The licensee has proposed the removal of TS Table 3.8-1. The proposed change would control this information in the appropriate ANO-2 plant procedures. The licensee has indicated that all of the containment penetration conductor overcurrent protective devices listed in TS Table 3.8-1 have been verified to be listed in ANO-2 plant procedures. These procedures are subject to the change control provisions listed in the Administrative Controls Section of the ANO-2 Technical Specifications, in addition, the licensee has committed to revise the Updated Final Safety Analysis Report (UFSAR) to include a discussion of the design features associated with the l

containment penetration conductor overcurrent protective devices including references to plant operating procedures. The licensee has proposed the following modified statement for the LCO l

under TS 3.8.2.5 to support the removal of references to Table 3.8-1:

Primary and backup containment penetration conductor overcurrent protective devices associated with each containment electrical penetration circuit shall be OPERABLE. The scope of these protective devices excludes those circuits for which credible fault currents would not exceed the electrical penetration design rating.

i -

In addition, the licensee has proposed to revise the TS 3.8.2.5, Action statement discussion to remove the reference to Table 3.8-1. Th a surveillance requirement has been revised to state the following:

j b

m w

All containment penetration conductor overcurrent protective devices shall be demonstrated OPERABLE in accordance with the manufacturers' recommendations.

The surveli;ance requirement reference to "All containment penetration conductor overcurrent protective devices" is consistent with the format proposed in Generic Letter 91-08, Enclosure 2, and is intended to be inclusive of the set of components defined in LCO 3.8.2.5 as " Primary and

. backup containment penetration conductor overcurrent protective devices." The licensee has proposed changes to the above TS that are consistent with the guidance provided in Generic Letter 91-08. Finally, the licensee has confirmed that all of the components for which the TS requirements apply are adequately identified and controlled by plant procedures.

' On the basis of its review, the staff finds that the proposed change to the TS for ANO-2 is primarily ar administrative change that does not alter the requirements set forth in the existing TS. The removal of the component list is acceptable because it does not alter the existing TS requirement or those components to which it applies and the table is not required to be in the TS pursuant to 10 CFR 50.36. Overall, this change will allow the licensee to make corrections and updates to the list of components for which this TS requirement applies, under the provisions that control changes to plant procedures as specified in the Administrative Controls Section of the TS and in accordance with 10 CFR 50.59. Therefore, the staff finds that the proposed TS change is acceptable.

3.0 STATE CONSULTATION

in accordance with the Commission's regulations, the Arkansas State official was notified of the proposed issuance of the amendment. The State official had no comments.

4.0 ENVIRONMENTAL CONSIDERATION

The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes

. surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative i

occupational raciation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (63 FR 56245, October 21,1998). Accordingly, the l:

amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the i

l

.. amendment.

l l

5.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the I

L_

4 4

5 Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: Chris Nolan Date: June 29, 1999 i