ML20196J289
| ML20196J289 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 02/29/1988 |
| From: | Blosser J, Moose J UNION ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| ULNRC-1741, NUDOCS 8803140240 | |
| Download: ML20196J289 (7) | |
Text
, _ _ _ _
r l
I DOCKET NO.
50-483 UNIT NAME CALLfa'AY UNIT 1 DATE 3-7-88 COMPLETED BY J. M. Moose TELEPHONE 314/676-8243 PART A CPERATIONS
SUMMARY
l ne plant operated at approximately 100% power throughout the month with the following exception. On February 13, 1988 a turbine / reactor trio occurred during the weekly turbine overspeed trip test.
Safety injection was actuated on low steam line pressure during the subsequent plant cooldown. Power operations resumed on February 17.
PARI B PORV AND SAFETY VALVE SUFFARY l
l None Ils Page 1 of 4 8803140240 880229 PDR ADOCK 050004G3 R
V s
e Part C AVERACE DAILY UNIT POWER LEVEL DOCKET NO.
50 483 UNIT NAME CALLAWAY UNIT 1 DATE 3-7-88 COMPLETED BY J. M. Hoose TELEPHONE 314/676-8243 HONTH:
February 1988 AVERACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL DAY (HWe-Net)
DAY (HWe-Net) 1 1117 17 0
2 1116 18 581 3
1116 19 1082 4
1118 20 1111 5
1117 21 1109 6
1115 22 1104 7
1111 23 1115 8
1111 24 1116 9
1114 25 1117 10 1118 26 1110 11 fl18 27 1113 12 1118 28 1115 13 146 29 1116 l
i 14 0
I 15 0
16 0
Page 2 of 4 i
r Pr.rt D OPERATING DATA REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 3-7-88 COMPLETED BY J. M. Hoose TELEPHONE 314/676-8243 OPERATING STAIUS (YTD CUM )
1.
REPORTING PERIOD: February 1988 GROSS HOURS IN REPORTING PERIOD:
696 1440 28022.5 l
2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (HWe-Net):
1120 DESIGN ELECTRICAL RATING (MWe-Net):
1171*
- At stretch power level which is not currently authorized under the Operating License.
3.
POWER LEVEL TO kHICH RESTRICTED (IF ANY) (MWe-Net):
4 REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL...............
600.5 1,333.7 23,311.5 6.
REACTOR RESERVE SHUTD0kN HOURS.....................
0 0
0 7.
HOURS GENERATOR ON LINE............................
583.6 1,303.6 22,758.1 8.
UNIT RESERVE SHUID0kW HOURS........................
0 0
0 9.
GROSS THERMAL EN5;RGY GENERATED (MkH)...............
1,944,633 I,,345,394 72,635,174
- 10. GROSS ELECTRICAL ENERGY GENERATED (MkH) 664,073 1,483,000 24,524,720 11.
NET ELECTRICAL ENERGY GENERATED (MWH)..............
631,769 1,412,238 23,301,914 12.
REACTOR SERVICE FACTOR.............................
86.3 92.6 83.2 13.
REACTOR AVAILABILITY FACTOR........................
86.3 92.6 83.2 14 UNIT SERVICE FACTOR................................
83.9 90.5 81.2
- 15. UNIT AVAILABILITY FACTOR...........................
83.9 90.5 81.2
- 16. UNIT CAPACITY FACTOR (Using MDC)...................
81.0 87.6 74.2 l
- 17. UNIT CAPACITY FACTOR (Using Design MWe)............
77.5 83.8 71.0 18.
UNIT FORCED OUTAGE RATE............................
-16.15 9.47 4.41 19.
ShVID0kHS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUT D0kW AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
Page 3 of 4
i" a
Part E UNIT SIlUTDOWNS AND POWER f MUCTIOri DOCKET NO.
50-483 UNIT NAME CALLAWAY LHIT 1 DATE 3-7-88 COMPLETED BY J. M. Moose TELEPIIONE 314/676-8234 REPORT MONTII: February 1988 METilOD OF TYPE SilUTTING DOWN F: FORCED EURATION Tile REACTOR OR DATE S: SCIIEDULED (liOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /COF2fENTS 3
2-13-88 F
112.4 B
3 Turbine / Reactor Trip while performing turbine trip test.
Subsequent safety injection. LER 88-004-0 SUntARY:
REASON METilOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELINC 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTifER (EXPLAIN)
E: OPERATOR TRAININC AND LICENSE EXAMINATION F: ADMINISTRATIVE C: OPERATIONAL ERROR (EXPLAIN)
II: OTIIER (EXPLAIN)
Page 4 of 4
(
3
- Union
.Etscraic n
Ca#away Plant.
March 7, 1988 Nuclear Regulatory. Commission Document Control Desk Weshington,-DC 20555 ULNRC-171.1'
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT FEBRUARY 1988 v
The enclosed Monthly Operating Report for February 1988 is i
submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
L,DB/w J
D. Blosser Manager, Callaway Plant ET/
/
c Enclosure cc: Distribution attached i
1 S[f I
t i
Makg Aodress: P.O. Box 62Q Futort MO 65251
cc distribution for ULNRC-1741 with enclosures Mr. Robert DeFayette, Chief Project Section 1A U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Thomas Alexion (2 copies)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102 i
j
i bec distribution for ULNRC-1741 with enclosures Records Center Institute of Nuclear Power Operations Suite 1500 1100 circle 75 Parkway Atlanta, GA 30339 l
l American Nuclear Insurers Library l
c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Mark Parvin Callaway Project Manager Westinghouse Electric Corp.
P. O. Box 355 2
Pittsburgh, PA 15230 D. F. Schnell (400)
R. J. Schukai (470)
F. W. Brunson (470)
J. F. McLaughlin T. P. Sharkey A. P. Neuhalfen W. R. Campbell A. C. Passwater/D. E. Shafer/D. J. Walker (470)
G. A. Hughes G. J. Czeschin J. R. Peevy W. R. Robinson R. R. Roselius J. R. Polchow M. E. Taylor D. E. Young 2170.04 (QA Record)
S. L. Auston (NSRB) (470)
T. A. Moser J. M. Moose (2)
R. L. Kelly (460)
R. J. Irwin/J. M. Brown (490)
JDB Chrono 3456-0021.6 G56.37 N. Date W