Amend 153 to License NPF-38,extending Surveillance Test Interval for Reactor Trip Circuit Breakers from Monthly to Quarterly & Revising Bases Page Appropriately
ML20196J292
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/29/1999
From: Gramm R
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20196J296 List:
References
NUDOCS 9907070222
Download: ML20196J292 (7)


Text

-

.- g ery p

UNITED STATES s

j NUCLEAR REGULATORY COMMISSION

~

2 WASHINGTON. D.C. 20066 4 001 f,

{

ENTERGY OPERATIONS. INC.

DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION. UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.153 License No. NPF-38 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Entergy Operations, Inc. (the licensee) dated July 17,1996, as supplemented by letters dated October 22,1998, and January 12 and February 5,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9907070222 990629 PDR ADOCK 05000382 P

PDR

p

" l l

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-38 is hereby amended to read as follows:

(2)

Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.153, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION A M-Robert A. Gramm, Chief, Section 1 Project Directorate IV & Decommissioning

)

Division of Licensing Project Management Office of Nuclear Reactor Regulation i

Attachment:

Changes to the Technical Specifications Date of issuance:

June 29, 1999

ATTACHMENT TO LICENSE AMENDMENT NO.153 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50-382 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 3/4 3-10 3/4 3-10 3/4 3-11 3/4 3-11 3/4 3-12a 3/4 3-12a B 3/4 3-1a B 3/4 3-1a 5

l,

3 l

5 1

6 HC I

H O

E N

WC D

5 5

T RN N

E OA RI 4

4 5

E L

4 F

M L U D

SI 3

EQ 3

3 N

E VE 2

2 2

2 2

2 2

2 2

2 2

E S

D R R T

OU 1

1 2

1 1

1 1

1 1

1 1

1, M

N MSI A

S E

M

)

E 1(

R L

U I

A

)

)

/

1 1

U N

S

(

(

L Q

EO U

U d

R NTT S

S n

I

/

/

E

)

)

a NCS o

d 6

6

(

(

)

E ANE n

n R

R 1

C HUI a

a 1(

N CF R

Q Q

Q Q

Q Q

Q Q,

Q, Q

Q A

I LL EVR

)

)

U N

4, 5,

, )

)

S L

3 4

4, 5, 1

E O

(

(

N NTI M,

R 2 (4

-3 O

NA

(

)

DR

)

0 T

AR 4, )

4, 1

4 I

E A

HB A

24

)

,)

)8

((

4 2

7(

A 3

L T

CL N

DQ R

R R

R R

R D

SM R

N 4

I

(

(

(

B N

A A

E C

3

/

T M

U L

R E

T NK S

NC N

AE I

HH A.

A.

E CC N

S S

S S

S S

S S

S S

N V

ITC ETORP w

h R

h o

g O

ig L

iH m

h w

T H

h w

ig o

e L

h e

C h

ig o

H t

u ig le s

r AE ig e

H L

s le e

S l

H v

y R

H v

e s

e r

e v

L n

L e

e u

r e

y p

ir e

r u

u s

P L

it r

o 3

r r

l o

it s

T T

v e

s s

s r

r t

T r

e w

s s

e o

o n

a c

I I

o L

o e

e t

t e

r e

N r

r r

P a

a D

w e

to U

N tc r

P P

P r

r t

o n

r U

a e

n e

e r

c r

r n

n e

L e

P e

e e

G L

e w

im z

z m

G G

o R

m r

D A

R o

e e

w o

R P

h r

r n

P B

a aig F

i i

tcc O

N l

t u

u ia m

m la N

e e o a

r i

O r

s s

I u

a a

s s

tn a

a t

n o

e e

c D

S RL R

n e

g e

e T

a i

o r

r t

t o

E C

M L

L P

P C

S S

L T

N 2

A U

0 1

1 2

3 4

5 S

7 8

9 W

F 1

1 1

I EC R

N D O

A E 5

L R F

L UI I

4 S HEQ E CVE 3

2 2

2 DI RR 2

OH U 1

1 1

3 MWSIS 1

5 1

9 S

6 T

N O

E N

)

M T

1 E

(

R L

U N

/

E I

A S

M U

N L

D Q

EO

)

)

I 1

6 N

E NTT 1,

(

E R

NCS 0

R, 6

)

M E

ANE

)

(

1 9

R, A

C HU T

(

(

N CF Q

Q Q

Q A

LL IE

)

d V

N 5,

)

e R

LO 4

J, U

EI

(

T R,

n S

N A i

N R 4,

)

tn N

A B o

O HI A.

2 C

I C

(

L N

D R

R T

A

(

A C

1-T 3

N 4

E E

M L

L B

U E

A R

N K T

TS N C 1

N A E 1

H H A.

3 I

E C C N

S S

S 4

V

/

IT 3

C ETO RP RO s

w r

T o

o t

L C

!u w

a A

s E

r c

R e

la lo ka C

F 3

e s

t r

n r

n T

T B

o o

a IN t

l N

p it a

o I

U ir e

lu o

U c

t c

C T

o l

L r

r a

r D

A o

P C

o R

t t

N c

e A

ac O

O a

r F

I e

o E

e T

R C

C R

R C

ET N

A U

3 4

5 6

W F

1 i

1 1

[

TABLE 4.3-1 (Continued)

\\

l

. TABLE NOTATIONS (Continued) i l

(6)

This CHANNEL FUNCTIONAL TEST shall include the injection of simulated process signals into the channel as close to the sensors as practicable to verify OPERABILITY including alarm and/or trip functions.

(7)

Above 70% of RATED THERMAL POWER, verify that the total RCS flow rate as indicated by each CPC is less than or equal to the actual RCS

)

total flow rate determined by either using the reactor coolant pump j

differential pressure instrumentation or by calorimetric calculations and if necessary, adjust the CPC addressable constant flow co-efficients such that each CPC indicated flow is less than or equal to the actual flow rate. The flow measurement uncertainty is included j

in the BERR1 term in the CPC and is equal to or greater than 4%.

(8)

Above 70% of RATED THERMAL POWER, verify that the total RCS flow rate as indicated by each CPC is less than or equal to the actual RCS total flow rate determined by calorimetric calculations.

(9)

The quarterly CHANNEL FUNCTIONAL TEST shall include verification that the correct values of addressable constants are installed in each OPERABLE CPC.

(10)

At least once per 18 months and following maintenance or adjustment of the reactor trip breakers, the CHANNEL FUNCTIONAL TEST shall include independent verification of the undervoltage trip function and the shunt trip function.

(11)

The quarterly CHANNEL FUNCTIONAL TEST shall be scheduled and performed such that the Reactor Trip Breakers (RTBs) are tested at least every 6 weeks to accommodate the appropriate vendor recommended l

interval for cycling of each RTB.

l l

l WATERFORD - UNIT 3 3/4 3-12a AMENDMENT NO.425-153

1 3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR PROTECTNEMD_ ENGINEERED SAFETY FEATURF SAFETY ACTUATION SYSTEMS INSTRUMENTATION condition while another RWSP-Low channel is in bypass, the receipt of a valid Safety injection Actuation Signal Actuation, and a coincident failure of one of the two remaining OPERABLE RWSP-Low channels. These conditions could cause the Emergency Core Cooling System and Containment Spray System suctions to be supplied from the Safety injection System Sump prematurely due to containment pressure being higher than RWSP outlet pressure and loss of the Low Pressure Safety injection Systems.

When one of the inoperable channels is restored to OPERABLE status, subsequent operation in the applicable MODE (S) may continue in accordance with the provisions of ACTION 19.

The Surveiliance Requirements specified for these systems ensure that the overall system functional capability is maintained comparable to the original design standards. The periodic surveillance tests performed at the minimum frequencies are sufficient to demonstrate this capability.' The quarterly frequency for the channel functional tests for these systems comes from the analyses presented in topical report CEN-327: RPS/ESFAS Extended Test interval Evaluation, as supplemented.

Testing frequency for the Reactor Trip Breakers (RTBs) is described and analyzed in CEN NPSD-951. The quarterly RTB channel functional test and RPS logic channel functional test are scheduled and preformed such that RTBs are verified OPERABLE at least every 6 weeks to accommodate the appropriate vendor recommended interval for cycling of each RTB.

RPS\\ESFAS Trip Setpoints values are determined by means of an explicit setpoint calculation analysis. A Total Loop Uncertainty (TLU) is calculated for each RPS/ESFAS i

instrument channel. The Trip Setpoint is then determined by adding or subtracting the TLU from the Analytical Limit (add TLU for decreasing process value; subtract TLU for increasing process value). The Allowable Value is determined by adding an allowance between the Trip Setpoint and the Analytical Limit to account for RPS/ESFAS cabinet Periodic Test Errors (PTE) which are present during a CHANNEL FUNCTIONAL TEST. PTE combines the RPS/ESFAS 1

. cabinet reference accuracy, calibration equipment errors (M&TE), and RPS/ESFAS cabinet bistable Drift. Periodic testing assures that actual setpoints are within their Allowable Values. A channel is inoperable if its actual setpoint is not within its Allowable Value and corrective action must be taken. Operation with a trip set less conservative than its setpoint, but within its specified ALLOWABLE VALUE is acceptable on the basis that the difference between each trip Getpoint and the ALLOWABLE VALUE is equal to or less than the Periodic Test Error allowance assumed for each trip in the safety analyses.

i The measurement of response time at the specified frequencies provides assurance that the protective and ESF action function associated with each channel is completed within the time limit assumed in the safety analyses. No credit was taken in the analyses for those channels with response times indicated as not applicable.

Response time may be demonstrated by any series of sequential, overlapping, or total channel test measurements provided that such tests demonstrate the total channel response time as defined. Sensor response time verification may be demonstrated by (1) in place, onsite, or offsite test measurements or (2) utilizing replacement sensors with certified response times.

Angdment No.443,-448 WATERFORD - UNIT 3 B 3/4 3-1a

-. ~.

--